• Drill Bit Re-Sharpener for Drilling Z13/Z20/Z26/Z32 System 1
  • Drill Bit Re-Sharpener for Drilling Z13/Z20/Z26/Z32 System 2
  • Drill Bit Re-Sharpener for Drilling Z13/Z20/Z26/Z32 System 3
  • Drill Bit Re-Sharpener for Drilling Z13/Z20/Z26/Z32 System 4
Drill Bit Re-Sharpener for Drilling Z13/Z20/Z26/Z32

Drill Bit Re-Sharpener for Drilling Z13/Z20/Z26/Z32

Ref Price:
get latest price
Loading Port:
NINGBO
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description

1. Portable drill grinder, accurate and rapid, easy to operate, with no skill requirement to grind.

2. Economic and saving cost, improve efficiency.

3. With Taiwan Grinding Wheel, only one piece can complete all procedure, accurate angle and long service life.

4. The electrically controlled and powerful DC motor, stable frequency, strong horsepower and long service life.

5. It can sharpen the drill bit front cutting lip, lip relief angle.

6. It can be effective co-ordination with the drilling material and speed, can control the quality and accuracy of the work piece, extend the life of the drill bit.

Standard with CBN grinding wheel for the HSS material, Optional SDC grinding wheel for the carbide material.


Technical Parameters

Model

Z13D

Z20

Z26

Z32

Grinding Range

Φ3-Φ13

Φ320

Φ1226(Φ32)

Φ326

Point Angle

90°-140°

95°-135°

95°-135°

95°-135°

Power

AC220V

AC220V

AC220V

AC220V

Motor

120W

120W

250W

250W

Speed

4800rpm

4400rpm

4400rpm

4400rpm

Dimension

36*21*19m

33*18*20cm

46*26*24cm

32*18*475px

Weight

9kg

17kg

25kg

33kg



Remarks:

Applicable cutting tool


Package

Q&A

Q1. Where is your factory located?

A : Our factory is located in Taizhou City, Zhejiang Province, China.

Q2. What is your MOQ of your machine?

A: Normally our MOQ is 1 set.

Q3. Do you test all your machine before delivery?

A: Yes, we have 100% test before delivery.

Q4: What is the payment term?

A: T/T 100% payment. We'll show you the photos of the products and packages before shipping.

Q5: What is the normal lead time?

A: If in stock, it usually takes10-15 days. 20-30 days if not in stock, depending on quantity.

Q6: Guarantee Period?

A: 1 year only for motor.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches