• Double-ply red scrim aluminum foil insulated air duct System 1
Double-ply red scrim aluminum foil insulated air duct

Double-ply red scrim aluminum foil insulated air duct

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

IN006

Steel wire helix as framework,

single-ply aluminum foil jacket,

double-ply aluminum foil core,

filled with red scrim

PROPERTIES

VALUE

DIAMETER RANGE

80-1200MM

TEMPERATURE RANGE

-30-+140

WORKING TEMPERATURE

2000Pa

BENDING RADIUS

0.54*D+25MM

THICKNESS OF FIBERGLASS INSULATION

25MM

DENSITY OF FIBERGLASS INSLUATION

16-24KG/M3

STANDARD LENGTH

10M OR 7.6M


Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
After learning that feel boring, to diverted it, brush point repair it. Architectural design institute will need to design equipment (that is, plumbing) design talent, that is, will generally participate in architectural design, the wages should be
Q: Air to water heater host and air conditioning host is not the same
You can try asphalt! Is the kind of paving the way! Very useful!
Q: Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
The general level of more than 12 layers when you need to use.
Q: What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q: External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q: Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q: HVAC Heating: What are the main components of the air distribution system?
(HS Code) Yes, the tax rebate is 13% (April . 2009 latest data). Floor of the board of the tax number is, the tax rebate is 9% (June . 2009 the latest data), floor board is the inspection of goods, exports need to be checked. There is nothing to understand where to add me MSN:

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords