Double Mast Climbing Work Platform STC100 with Lifting Speed 8.3 m/min
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
Double Mast Climbing Work Platform STC100 with Lifting Speed 8.3 m/min
Descrition:
Mast climbing work platform is Shenxi's newly-researched and designed aerial work equipment, which adopts the latest technological advances and develops on the basis of traditional suspended access platform. It embodies lots of superior features and does play an indispensable part in large-scale construction work at height, especially in worksites where the suspending mechanisms are unable to install.
The main parts of Mast climbing work platform can be interchanged with building hoist such as mast sections, rack, pinion, reducing device and so on. And its width and length can be changed according to requirement. It is requisite equipment in construction job. Additionally. It is no need for foundation so that it is easy to change the working site
Specifications:
Single Mast | Double Mast | ||
Rated Capacity | 1000 kg | 1700 kg | |
Rated Lifting Speed | 8.3 m/min | ||
Max. Working Height | 100 m | ||
Max. Height of Stand-alone Installation | 7.5 m | ||
Length of Platform | 8.67 m | 20.34 m | |
BasicWidth of Platform | 1.5 m | ||
Max.Width of Platform | 2.5 m | ||
Size of Standard Section | 1508×500×500 mm | ||
Motor | Type | YZZ 132 S1-4 | |
Power | 2×5.5 kW | 4×5.5 kW | |
Rated Rotation Speed | 1400 r/min | ||
Rated current | 13.5 A | ||
Brake | Brake Torque | 100 N.m | |
Exciter Voltage | DC 195 V | ||
Reducer | Type | TU 65 C/125-63 | |
Transmission Ratio | 1:63 / 1300 N.m | ||
Power Supply | 3P, 380V, 50Hz | ||
Total Weight(H100m) | 8724 kg | 17734 kg |
Competitive Advantage:
1.with overload
2.with balance device
3.moving synchronize device
4.with anti-falling safety device
5.with constant speed safety device
6.with hand-operation landing equipment
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Double Mast Climbing Work Platform STC100 with Lifting Speed 8.3 m/min
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches