CSR62 MET COKE
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m.t.
- Supply Capability:
- 50000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
CNBM MET COKE of CSR62
The world's iron ore resources concentrated in Australia, Brazil, Russia, Ukraine, kazakhstan, India, the United States, Canada, South Africa and other countries.China as the world's largest iron ore demand and its own iron ore reserves is not less, but unfortunately low grade, from an industrial economy perspective, rather than from Australia, Brazil and other countries is rich in the rich iron ore imports.
The intended use of CNBM MET COKE of CSR62
Our CNBM MET COKE of CSR62 are ideal for:
· Power plant
· Steel mills
The advantages of CNBM MET COKE of CSR62
Not only are OKorder's CNBM MET COKE of CSR62 of the highest quality and reliability, we are able to quickly ship orders within 20 days of receiving a deposit or original L/C.
Main features of CNBM MET COKE of CSR62
l Unique Frame Design For Easy Installation
l High energy conversion efficiency
l Reliable performance
FAQ:
Q1:How many peplo in your warehouse?
A: two
Metallurgical Coke of Coke CSR62 Images:
Specifications:
Parameters | Guarantee |
Moisture (ARB) | 5% max |
Ash (DB) | 12.50% max |
Volatile Matter (DB) | 1.4% max |
Sulphur (DB) | 0.7% max |
Phosphorus (DB) | 0.035% max |
CSR | 62% min |
CRI | 28% max |
M40 | 82% min |
M10 | 8% max |
Size 40-100 mm | 90% min |
+100 mm | 5% max |
-40mm | 5% max |
Mean Size | 58 mm |
At present, the main customers are NOBLEGROUP, IMR and so on. Our main overseas markets are Japan, India, Brazil, Iran,Vietnam, and so on.Let me know your demands then I can check availability.
- Q: Coke is how to make it? What is the use?
- Coke production has prepared the material into the coal charging car from coal tower, were sent to the furnace chamber. The gas produced by the dry distillation is sent to the chemical product recovery workshop for processing. After a coking period (from charging to pushing the required time is generally 14 to 18 hours, depending on the carbonization chamber and the width), a pusher will mature by refining coke coke machine into the coke car; coke quenching, coke is discharged into the cold coke; then screening and storage (Figure 4).The coking plant is generally composed of two coke ovens. The two coke ovens are arranged on the same central line, and a coal tower is arranged in the middle. A furnace with coke oven machinery -- corresponding charging car and coke machine, machine coke, coke quenching car and motor vehicle; also equipped with a set of facilities including coke quenching, coke quenching tower, coke quenching pump, coke powder and coke powder sedimentation tank grab, arranged in the end furnace group. The center of the coke quenching tower is not less than 40 meters from the center of the carbonization chamber. If dry coke quenching, coke oven station. The coking plant is also equipped with the necessary piping and reversing system.
- Q: The total amount of heat released by the fully burnt 200g coke is 60% by mass of 10kg water absorption [q coke =3.0 * 107J/kg, C water =4.2 * 103J/ (kg = C)], q:(1) how much heat is absorbed by water?(2) if the initial temperature of water is 10 degrees C, then, after absorbing heat, the temperature will rise to how much?
- Dry water temperatures:Delta t=Q ceilingC water m water=3.6 x 106J4.2 x 103J/ (kg * c) * 10kgC = 85.7,At the end of a water temperature t=t0+ t=20 C +85.7 =105.7 oc,
- Q: What is the difference between coking coal and coke
- Coking coal is an essential raw material for the production of coking coal, coking coal is one of the main uses of coke, coke is full of coking coal, coking coal is necessary for coke.
- Q: Why does Coke provide heat when it is fired, it reacts only at high temperatures and why it is needed to provide heat?Which is the exothermic reaction, carbon dioxide or carbon monoxide?
- Generate CO2;Of course, high temperature will produce CO, but not many;Please ask questions
- Q: What is the amount of waste gas produced by a ton of coke burning
- Metallurgical coke with high carbon content, high porosity, high strength (especially high temperature strength), is an important fuel and reducing agent of blast furnace ironmaking, but also the entire blast furnace pillar supporting agent and loose agent
- Q: I now do a good job in the coke network editor, I would like to know more about coke
- (1) heating.The heat needed for blast furnace smelting is provided by the combustion of coke and fuel, and the hot air is provided, and the heat of coke combustion accounts for 75% ~ 80%. The ash content of coke is low, and it still keeps a certain degree before falling to the tuyere.
- Q: Purpose of using coke in iron making raw materials
- The coke can provide the heat required for the reaction and has the reducibility
- Q: What is the difference between coke and semi coke in ferrosilicon smelting process? In the process of energy statistics in the end should be 0.9714 of the conversion coefficient should be used with the conversion coefficient of 0.75 x 0.9714, please expert advice? emergencyUrgent!
- Coke is used for smelting iron alloy coke, and the coke is used in blast furnace and used for copper, lead, zinc, titanium, antimony, mercury and other non-ferrous metal smelting of blast furnace, reducing agent, heating agent and columnar skeleton.
- Q: What is coke? What is the use?
- The use of coke coke is mainly used in blast furnace and used for copper, lead, zinc, titanium, antimony, mercury and other non-ferrous metal smelting of blast furnace, reducing agent, heating agent and columnar skeleton blast furnace adopts coke instead of charcoal.
- Q: Mechanism of carbon and coke is not the same as the price which high?
- I am on the Ba Chau facility in Hebei during May this year, but now has more than 3 months, only 2 tons of carbon, and are defective pile to nobody in my barn. I bought a big machine, according to them is made of bark can make the raw material drying, but home. It's not going to work. I had to switch to coal drying, coal can not over drying, rework is often the case. Carefully down a do tons of carbon coal money to spend more than and 300. The great machine can not work normally, the basic propeller around 4 hours repair time, until now I have changed my sleeve 7
Send your message to us
CSR62 MET COKE
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m.t.
- Supply Capability:
- 50000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches