• Concrete Vibrating Screed with Honda GX35 Engine System 1
  • Concrete Vibrating Screed with Honda GX35 Engine System 2
Concrete Vibrating Screed with Honda GX35 Engine

Concrete Vibrating Screed with Honda GX35 Engine

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
100 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

vibration rod adopts unique shaped scraper, can let a worker to concrete leveling the ground. Vibration effect can reduce

the surface bubbles to form strong and dense concrete ground. It reduced the common scraper required laborious time-consuming work.


Main Product Features:

1.Specially design, hardened aluminum blade ensuring a smoother finish than conventional screeds.

2.Heavy rubber mounts to reduce the vibration level on the handle.
3.The rounded ends of the blade make it easy to go around obstacles
4.The tilt-up stand keeps the engine out of concrete or off the ground obstacles
5.One piece casting body easy connect to engine
6.Emergency stop switch available
7.different working widths: 4ft/1. 2m, 6ft/1. 8m, 8ft/2. 4m, 10ft/3. 0m, 12ft/3. 7m, 14ft/4. 5m, 16ft/4. 9m
Easily changed blades



Product Specifications:

Model: JY36S

Engine Type: Chinese Engine/ Honda GX35

Power: 2-2.5HP

Blade Length: 1-4m

Frequency: 5500-6500r/min

Weight:20kg


FAQ:

Q1: How to confirm that your  Screed  could be used in our country?

A1: We have been providing Screed  for nearly ten years, possess near every kind of  Screed  in the market. What is more, we can produce as the customers’ request with drawing provided.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. 

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 5-15 workdays.

Q4: If we can produce some Screed  according to customers request?

A4: Yes, we can produce  Screed  according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.



Concrete Vibrating Screed with Honda GX35 Engine

Concrete Vibrating Screed with Honda GX35 Engine


Q:What is the performance of the Tiangong grader and the Xugong Grader? And how about the price? What if the installments are paid?
Liugong is good, with the Carter technique, general structure and Carter about the cab on the frame, Xugong also like the old, not what improvement, I use the Liugong 418, feeling than the other in a comfortable driving, my car and others are put together I say this car at the upscale, ha ha, a price more expensive than Xugong, personal feeling value, you can choose to buy it, XCMG money, money to buy a good point. I wish you a good car. In addition, Liugong market hit butter, convenient
Q:Roller, grader, operation permit and excavator operation certificate?
It is issued by the Chinese machinery department. It is common in the whole country and has the skills to be reported in our school
Q:What is the difference between grader and paver? Can you specify the construction process?,
Likewise, the grader is efficient and saves money, but the evenness is not as good as the paver
Q:XCMG gr180 grader gearbox 1 gear 23456, what's wrong with it?
What's the pressure of a few gear boxes back?
Q:Job grader, more than 10 years of road work experience, monthly salary of more than 6000
Here is to find a job, not to recruit people through the enterprise will ask, do you want to go to the relevant industry website resume, now more than 80% enterprises will be through online recruitment, grassroots posts will be solved by personnel outsourcing and talent market
Q:Performance of Tiangong 160C grader
Day machines, second-hand people like to buy, you say the quality is good...
Q:I opened the Sany when hydraulic grader walking haltingly.
if not up to the pressure, with 80% pump has a relationship, there is the oil inlet filter, there is no blockage, variable-speed torque converter on the valve, because now most of the grader is used in hydraulic torque converter, considering the transmission valve the pressure value and there is no blocking phenomenon, there is a variable valve spring spring, if broken would cause unstable pressure, if the transmission valve is also all right, leaving the hydraulic coupler and change the internal problems of converter!!
Q:Who can tell me: in the construction of highway engineering machine and medium bulldozer each in the use of what situation? Thank you very much!
Bulldozers are bigger earthwork handling, strength is good, but the speed is slow, the formation of the site is not very flat.
Q:Chang Linzhu, the wheel of the grader does not turn at one turn. What's the matter?
Hello, I am also has this kind of situation, you can click on the conventional repair system in 360, after the completion of repair can log in again, I hope you can help, after all, a large upgrade or to a period of time.
Q:Excavators, flat machines, dump trucks, rollers, loaders, wearing parts have what?
There's nothing bad about love when you worry about your car, your skin, your net, your butter mouth

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords