Animated Led Outdoor Acrylic Santa Claus With Lantern Decoration
- Loading Port:
- Ningbo
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 100 Sets set
- Supply Capability:
- 100000 Sets set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
General Introduction
2013 Hot Selling Collection
Brand New Animated Led outdoor Acrylic santa claus with lantern decoration
Bring you to the the ultimate in feel, magnificence, luxury and delight of Christmas.
Specification
Type; Animated Led outdoor Acrylic santa claus with lantern decoration | Specific Use; waterproof, outdoor use/ indoor use | General Use; Christmas decorating |
|
MOQ: 200PCS | Products size: 40cm (hight) | Color: R,G,B,Y,W ,RGB |
|
IP rank: IP20, IP44, IP65,IP68 | Voltage: 12V/24V/110-120V/220V | Certification: CE/GS/UL |
|
Delivery time; 30-45days | Qty/Ctn; 10 Pcs(carton box) | Packaging ; Usual export packing |
|
About us
We strive to provide our valued customer with the highest quality at a fair price and the best customer service possible.
Customer satisfaction is our main goal
You can contact us through Alibaba message center or ask seller a question link.
All questions, e-mails, will be responded within a 24 hours.
Before Orders:
If possible, please tell us what's the purpose for using it, so that we can recommend you the best package. Of course with best price to you!
Any other request, please feel free to let us know.
SAMPLES are avaiable before order.
OEM & ODM service is also avaiable
Our R&D department have more than 20 professional and technical personnel.We had help customers produce many OEM products for American Market,Germany Market and UK Market.
QC(Quality Control)
QC Team:More than 20 professional and technical personnel.
Material: Strictly control of material using, meet international requested standards.
Semi-finished Products Inspection: Product inspection before 100% finished. Such as Visual Inspection, Leak Testing, Comprehensive Safty Test and so on.
Production Line Test: With work team or data engineer who will inspect machines and lines at fixed period.
Finished Product Inspection: Quality and property test before products are packed and loaded
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
By sea | 30-40 business days |
1. 3-10 business days for Sample Orders; 7-40 business days for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address.
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
- Q: What are some good suggestions for plant energy saving lighting modification?
- the theory of life can reach 50000 hours, to the factory lighting energy saving renovation has brought great benefit.
- Q: What are the main technical measures for the implementation of energy-saving lighting?
- To make full use of natural light is one of the important ways to save the energy consumption of lighting, that is to say, electrical designers should consider the full combination of natural light and artificial lighting as far as possible, so as to save lighting energy.
- Q: Lighting line connections?
- In parallel circuit, switch line closed, switch branches closed, bulb shine, switch line disconnect switch, the branch is closed, no light bulb, indicating switch line can control the whole circuit, the switch can control the branch branch.
- Q: In the application of the following electrical appliances, what is said is incorrect
- Are connected in series between small color bulbs B, on the edge of the road, so the option B either.
- Q: What is lighting energy-saving?
- Therefore, it is imperative to actively promote energy-saving lighting.
- Q: What are festivals fireworks?
- In life, at certain times (such as the new year), enjoy the victory of the moment, or happy day, people will set off "fireworks", to express people's blessings and joy.
- Q: The sign and meaning of energy saving lamp
- the two signs all indicate that products meet the requirements of national standards for energy conservation evaluation.
- Q: The problem of intelligent lighting control
- Outdoor power is generally larger, such as street lights, factory lights, the application environment is relatively poor, moisture-proof, dustproof, high temperature needs to
- Q: Do the statutory holidays allow schools to assign homework to students?
- Protection of Minors Act provides education and training, the school should protect minors responsibility for the following provisions: (a) article thirteenth:" schools shall comprehensively implement the state policy for education, moral education, intellectual education, physical education and aesthetic education, labor education and guidance in social life and adolescent education of minors.
- Q: How to use electric car storage battery and energy saving lamp to produce street lamp
- The most important point of using LED is that the supply voltage is stable, and the slightly higher voltage can cause LED damage.
Send your message to us
Animated Led Outdoor Acrylic Santa Claus With Lantern Decoration
- Loading Port:
- Ningbo
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 100 Sets set
- Supply Capability:
- 100000 Sets set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords