5.0 CBM rock excavator Shi Dou Sfcat345
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
5.0 CBM rock excavator Shi Dou Sfcat345
Basic Info
Model NO.:CAT345 Type:Crawler ExcavatorSize:Medium-Sized Certification:ISO9001: 2000Condition:New Color:BlackExport Markets:Global
Additional Info
Trademark:SF Packing:PalletStandard:ISO9001-2008 Origin:China, Jiangsu ProvinceHS Code:84314100 Production Capacity:5000/PCS Per Month
Product Description
The following is some information of our CAT330 1.6CBM Rock Bucket
1. Material: Q345B+NM400
2. Configuration and performance
Add strengthen plate on the bottom
Add side protective plate and protective plate, tooth holder
3. Application
Applicable to heavy working environment, such as the loading of hard stone and ore after the blasting;
4. Group: Suitable for Caterpillar Excavator from 2-45T
If you are looking fo any spare parts for your excavator, we've got you covered.
We strive to deliver 5-star customer service, Order with confidence!
Type,material,performance and applications of buckets | |||
Main Bucket | Material | Configuration and performance | Application |
Rock Bucket | Q345B+NM400 | Add strengthen plate on the bottom,add side protective plate and protective plate,tooth holder; | Applicable to heavy working environment,such as the loading of hard stone and ore after the blasting; |
Heavy Duty Bucket | Q345B | Add strengthen plate on the bottom,excellent domestic tooth holder,prolonged service life. | Applicable to light working environment,such as the excavating and loading of hard soil,soil with rock,and soft rock. |
Q460 | Choose domestic wear-resistant plate as tooth holder plate and side plate;Excellent domestic tooth holder,to reach high abrasion and bending ability. | Applicable to heavy working environment,such as the excavating and loading of gravel,soil mixed with hard rock,second-hard rock,weathered granite. | |
Standard Bucket | Q345B | Normal thickness of the plate,excellent domestic tooth holder | Applicable to the heavy working environment,such as the excavating of the clay,sand and loamy gravel. |
- Q:My house is right along a steep hill then 4 acres, the problem is I need a path to get there for my ATV's or tractor or bike, If i go straight up the hill i will probably flip my ATV and a tractor would not make it even half way straight up. Any suggestion or who to hire for the job?
- Hire a local contractor with a small track dozer or one of the mini excavators.
- Q:the post are very rustic almost like a tree in half do they have to have concrete around like normal fencing because the posts are morticed for the rails i have a 3 ton excavator with a small bucket any advice from an expert would be highly appreciated
- Have put up a lot of fences... but not necessarily an expert. Good sources on the web in many DIY places... but in my opinion: A lot depends on the type of soil you're putting the posts in, and the climate. Dry climate and rocky soil would be less dependent on adding concrete. Moist climate and/or sandy soil would require something more substantial. And, it also depends on how high the fence is going to be and what you intend to keep in or keep out. In any case, would likely recommend treating the bottom couple of feet of the posts with a tar or creosote before installation to prevent rot and moisture penetration (Regardless of whether you use cement or not.) My experience, in rocky soil and an alpine climate, involved using a post-hole attachment on an International Harvester, a spud bar to break up rocks, and a supply of rocks to tamp back around the post once it was dry set. Six inches of large gravel in the hole. Insert post. Tamp large rocks around post with spud bar. Fill with dirt. Tamp some more. No concrete. Posts that loosen with time can be readily re-set. A slightly improved option, is to set the corner posts and gate posts in concrete and dry set the others. That works pretty well and saves some $$$. If you're going all out: treat the posts, drill the holes, bed with gravel, set the post, fill with concrete, slope the concrete away from the post, use bracing as necessary to maintain plumb. Can do a bunch or a few at a time that way. Make sure to cover the concrete with plastic as it dries to slow the drying and reduce cracking. Good luck. I'm sure there are lots of other good/better ideas as well. One nice option = the poly/vinyl fencing. Less weight. Very durable. Comes with instructions.
- Q:Hi there, I am playing the new Black ops zombies map Moon, and have ran into a problem in which the excavators have blocked my path, both tunnel 11 and the one adjacent to it. I cannot pass and do not have the hacker, is there a way around it or do they stop eventually? thanks
- First receive the hacker device from the lab. The lab is located just to the right if you are looking at the power switch, there are three floors in the lab and the hacker will be on one of the tables. Once you receive the hacker go through tunnel 11 or 6 and then go to the quick revive room where you start round 1. If the excavators have blocked both tunnels 11 and 6 there is a teleporter outside that takes you to area 51 this is where you start at the beginning of the game. To get to the teleporter go to the third floor of the lab and then open the left door. Carry on walking outside and then turn right and you should see 4 green lights if so walk pass the lights and jump down the hole. There will be a teleporter underneath you need every player on the teleporter to make it work. Once teleported wait until the teleporter reopens in area 51 and make everyone get onto it. Once you teleport back to quick revive there will be 1 or more green lights flashing on the excavator control panels. These are located to your right hand side in the middle with computers surrounding it or the other two next to the left airlock doors. It might be quicker to get teleported by the astronaut but you might not teleport in the right place and you will lose a perk e.g. juggernog. INPORTANT NOTICE Make sure that everyone is on the teleporter if you have the hacker so that you do not need to be revived because of lack of oxygen. If everyone else is on the teleporter you can make it to the teleporter and teleport with the hacker or without a space helmet on and not have to be revived.
- Q:I need to no the builds for:Gladiator Swordsman, Magic Knight, Excavator and shaman ._. thanks :D
- mon build are either full con, or 2con 1str. MK:Full dex .-. is good too me but, i see int/wis/dex or con. or int/wis/str crazy stuff.
- Q:Hi All,the scenario is..A compny wants to develop dbase to allow hiring of equipment to client. Company has 2types of equipment, power tools i.e drills and vacuums, and plants i.e. excavators and rollers. Power tools r decribed by model + voltage, plants r classified by model+ size in tonnes. Compny has various outlets, each outlet has staff including a Manager, and several Senior Technicians who are responsible for supervising the work of allocated groups of technicians. Each outlet has stock of equipment for hire that may be hired by clients for various periods of time, from a min of 4 hours to max of 6 months. Each hire agreement between a client and the company is uniquely identified by hire number. Client must take insurance cover for each equipment hire period. All equipment is checked for faults when returned by the client.Entities identified(are there any more?are any incorrect?): Equipmet Power Tools PlantsOutletSenior Technician TechniciansClientHire
- could you help me ? if you have this answer now please
- Q:Egyptians were a very religious and spiritual people, yet they somehow build pyramids that almost exactly aline with true north south east and west and aline with stars. not saying atheists are stupid, cause a lot of atheists are smart, yet I dont think atheists could build a pyramid anywhere near as good as the Egyptians could, but then again none of us can today that includes theists, well maybe we could but it wouldn't be an easy task.
- Where would you build it? Do you have permits? Do you have the resources needed to complete a task this size? What reason would a ceremonial tomb, the pyramids, we useful in our modern society? Why would an architect just design a triangle when it has already been done? Simply put, the pyramids are useless tombstones with costly maintenance and too expensive to biuld. Listen, I'm christian but this was not a smart question because this could be turned towards you. Simply. If theists are smarter that atheists, then why cant a theist build a orbital satellite like the atheists have? or build an observatory like the Alma observatory, the world's most expensive and sophisticated observatory,
- Q:hi,i would like to know if my 2 children and my wife would have a better life in france than the uk?i am a hgv driver/excavator operator and i am looking to life and work near to brittany??thanks
- Better in France nice leisurely way of life not a rat race like in the UK Brittanys great beautifull countryside and No Peage's
- Q:What are pieces of HEAVY equipment?
- Heavy equipment is used for heavy duty work, like a forklift or a tree uprooter thingy. Unless you're speaking in metaphor, in which case, ahem... I will just... I don't know.
- Q:I have. Her name is June. Please state the name and give examples.
- Yep. Some muslim cleric (cannot remember or spell his name) who got kicked out the UK for inciting violence. Says we are all filth and he did not want to live in the UK anymore anyway - so he went to Lebanon. Heard he approached the Royal Navy when Israel was bombing the bejesus out the place and demanded to be evacuated as he was British. They didn't. Instead they left him there and I hope he rots.
- Q:i want visit australia but i don't have friend or family there, anyone please help me...
- unless you can get here under the skilled migrant program you will find it very hard to obtain work here. Go to the Immi .au site for more details.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
5.0 CBM rock excavator Shi Dou Sfcat345
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords