• 20M 200L Holiday Time Led String Lights System 1
  • 20M 200L Holiday Time Led String Lights System 2
  • 20M 200L Holiday Time Led String Lights System 3
20M 200L Holiday Time Led String Lights

20M 200L Holiday Time Led String Lights

Ref Price:
$2.63 - 4.10 / pc get latest price
Loading Port:
Shenzhen
Payment Terms:
L/C,T/T
Min Order Qty:
200 Pieces pc
Supply Capability:
10000 Pieces pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

holiday led lights 20m 200L

1 .Voltage of the light:220V .
2. Bulbs: 200 leds/pcs
3. Type of bulb: LED bulb
4. Material:Pure copper
5. String length:20m
6. Color of bulb:red,Yellow,Blue,Green,Pink,Purple,White,Warm white, RGB
7. Life Span: >=50,000 hours
8. Function: controller with 8 liminous modes
9. The feature of LED: Low power consumption, bright color, long lift span
10.Certification: CE,ROHS approval.
11.Usage: Christmas, Festival celebration Wedding Banquet Dance and decoration

 

Multi-function Controller:8 kinds of luminous modes

  1. Always

  2. Wavy change

  3. Continuous change

  4. Flashing change

  5. Flashing slowly

  6. ON/OFF

  7. Dream

  8. Fast flashing

     

Company profile:

We are professional wedding lights company which focused on R&D located in SZ,

China Mainland.We handle small and big orders.
We had established long-term business relationship with many wholesalers and retailers from USA,UK,CANADA,AUSTRALIA,FRANCE etc.
Looking forward to a long-term cooperation with you.

LED string light uses classic strings. Its unique form and gorgeous colors give you a kind of sanctified dreamlike enjoyment.

 

Product Show:

 

Delivery:

Shipping Service

Estimated Delivery Time

DHL

2-8 business days

FedEx

3-8 business days

TNT

2-10 business days

UPS

1-7 business days

EMS

6-14 business days

ePacket

7-12 business days

China Post Air Mail

7-15 business days

China Post SAL

14-30 business days

Air freight

3-10 business days

By Sea

30-40 business days

1.    3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.

2.    "Business days" means Monday-Friday, excluding holidays.

3.    DHL and UPS cannot ship to military or P.O. boxes address

4.    The Shipping Service above is for reference only, for any other questions, please feel free to contact us.

 

Factory:

20M 200L Holiday Time Led String Lights

Q: CREE semiconductor lighting pay no
In case of holidays or rest days, you should pay in advance on the most recent working days. Wages shall be paid at least once a month, and wages paid by week, day and hour shall be paid by week, day and hour.
Q: What are some good suggestions for plant energy saving lighting modification?
the theory of life can reach 50000 hours, to the factory lighting energy saving renovation has brought great benefit.
Q: Aomori Festival
Time is not a holiday, the city of Aomori is August 2nd to 7, Hirosaki city is August 1st to 7, five in August 4th to 8 is set up. People use traditional Japanese paper to make huge square paper seat lights and parade them up and down the streets with their lighting.
Q: Does the lighting for the workshop use energy-saving lamps or LED lights?.
because it is glass, it is easy to be broken and bad to transport. It is not easy to install;
Q: Lighting line connections?
In parallel circuit, switch line closed, switch branches closed, bulb shine, switch line disconnect switch, the branch is closed, no light bulb, indicating switch line can control the whole circuit, the switch can control the branch branch.
Q: The problem of intelligent lighting control
You are the way to achieve energy-saving lamp switch interval, 1 1, 2, open 1, even after 3 1, this way our engineering design has been applied, but we used a set of intelligent lighting control system, the switch can be grouped to control the light, and since dynamic intelligent operation.
Q: Energy saving of urban lighting
According to the requirements of the planning and the specific circumstances of the building, the project should be integrated into the night view lighting system to locate its surface illuminance or brightness, and prevent its own pursuit of high brightness.
Q: What is the color temperature of a star hotel?
entrance channel lighting leads the vehicle safely to the entrance.
Q: What lamps or lighting energy-saving schemes are available for underground parking?
I think you can go to Shenzhen Rui Rui look
Q: How to use electric car storage battery and energy saving lamp to produce street lamp
Battery car battery series voltage, battery voltage and battery charge used vary greatly, in order to make the power supply voltage regulator circuit lamp will not be too complicated, so to the battery lighting device power supply voltage should not be too high, with a 12V battery to supply it.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords