• 12V200/20HR maintenance-free lead-acid battery ups,fire fighting equipment,Solar energy System 1
  • 12V200/20HR maintenance-free lead-acid battery ups,fire fighting equipment,Solar energy System 2
12V200/20HR maintenance-free lead-acid battery ups,fire fighting equipment,Solar energy

12V200/20HR maintenance-free lead-acid battery ups,fire fighting equipment,Solar energy

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 12V200/20HR maintenance-free lead-acid battery ups,fire fighting equipment,Solar energy   

 

Product description

12V200/20HR maintenance-free lead-acid battery ups,fire fighting equipment,Solar energy

12V200/20HR maintenance-free lead-acid battery ups,fire fighting equipment,Solar energy

12V200/20HR maintenance-free lead-acid battery ups,fire fighting equipment,Solar energy

 

 

12V200/20HR maintenance-free lead-acid battery ups,fire fighting equipment,Solar energy

12V200/20HR maintenance-free lead-acid battery ups,fire fighting equipment,Solar energy 

 

 

 

 

 FAQ

 Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral boxes and cartons. If you have legally registered patent, 
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and 
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, 
no matter where they come from.

  

Q: What is the difference between photovoltaic products and solar energy?
Photovoltaic and solar energy is a concept.Photovoltaic (Solar Power): solar photovoltaic power generation system (Solar power system) for short, is a kind of semiconductor material using solar photovoltaic effect, will be directly converted to a new generation of electric power system with solar radiation, operate independently and grid connected in two ways.
Q: Solar garden lamp product parameters
* storage battery: fully enclosed maintenance free lead-acid battery 15V20Ah - 80Ah* light source type: energy saving high power integrated LED, rare earth high efficiency energy saving lamp* protection level: IP65* use temperature: -30 degrees to 70 degrees, wind resistance is more than 150Km/h* lighting time: adjust as needed* pole height: according to need
Q: What are the disadvantages of traditional solar water heater
Lift people on science and technology, doubt, this contribution should be attributed to the Tsinghua sunshine and Emperor Ming in the past few years, their initial promotion products contributed to improvements in the manufacturing process, the product has also made a contribution. Make people know the solar water heater.
Q: What is the future of solar power
Residents issued 1 kwh of electricity, the state subsidy of 0.42 yuan; the national standard for the purchase of electricity from the desulfurization of residents with endless self generating electricity, the price is $0.42 per degree. To install and use a set of distributed photovoltaic power generation system with an average of 1 kilowatts of installed cost about 10 thousand yuan, if the 8 kilowatt system daily generating capacity of 30 degrees, 5 degrees every household consumption (no more than a price of 0.52 yuan), about 8 years to recover the investment. In accordance with the same calculation method, 10 kilowatts of distributed photovoltaic power generation device to recover the cost of 9-10 years. Family photovoltaic power plant to recover the cost of an average of between 8-10 years.
Q: Is there any water in the solar energy to water?
How much is the automatic water supply set level up to the number 2 can not need to fill 100 set automatic water temperature time to remove any fill
Q: Or must there be built - in battery? If yes, then use the mobile phone lithium battery can?
Solar panels can not be used directly to charge mobile phones and other products. The output voltage of the charger for mobile phone and other products at around 5V, and the output voltage of the solar panel is not fixed, fluctuated, when more than 5.5V or higher, causing permanent damage to products such as mobile phone, must control the output voltage between 4.5 ~ 5.5V through the conversion circuit.Built in battery is in order to output more stable, but the premise must be configured safe and effective protection circuit and voltage conversion circuit.
Q: 30MW solar thermal power plant total investment
0MW total investment in solar thermal power plants:Solar thermal power generation units at home and abroad to invest 1.5~3 yuan /kW range, so 30MW power plant is currently estimated to invest 5-9 billion yuan RMB.
Q: What are the functions of the new vehicle negative ion solar charging humidifier?
A lot of cities have Brown's physical store, go to the store to buy.
Q: The advantages and disadvantages of solar energy?Want to buy solar energy solar energy what is bad? Know about
3, placed the location of stress, angle, sunlight time, the surrounding environment is not easy to miscellaneous. Although the outside component is made of toughened glass, but also can not afford to toss the firecrackers. And aroundIf there is debris, easy to cause the "island effect" causes the component to burn oh.
Q: Buy solar water heater mainly look at what?
Two, after-sales service is very important in accordance with the three products, the principle of service of seven points. After sales service in the choice of solar water heater also plays a big role. With the development of solar energy industry, more and more manufacturers, in these new manufacturers, many do not have plant equipment, parts to take OEM processing, business variables, quality is difficult to guarantee. Due to the small sales, when operating for a period of time after a loss and product quality problems, will run away. The products are sold without service. So in the choice of solar water heaters, the choice of large brand products is essential.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords