EANTE excessive formwork 80×85×2.5
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Haiyuan New Material possesses china’s first fully automatic long fiber reinforced thermoplastic composite mould pressing production line with independent intellectual property, referred to as LFT-D line.
Why we developed EANTE formwork?
Superiority:
General worker can assemble and remove easily, save more labor cost.
The reinforcing ribs of EANTE formwork can be used to instead of the steel tube and wood.
Preassemble the EANTE formwork in the factory and fix it in the construction location.
The size accuracy of the composite formwork is better than that of the steel formwork and the wooden formwork. The concrete surface cast by EANTE Formwork is quite smooth, without any flaw, and no release agent is applied to assist the formwork removing.
We developed our own software with the characteristics as follow:
a. Computation time: it depends on the complexity of the architecture drawing;
b. Construction drawing: it is shifted from assembling drawing easily;
c. Material list: the assembling designing software would generate a list of formwork elements and auxiliary products.
Enviromental: EANTE Formwork is made from composite material, which is low-carbon, recyclable and environment-friendly.
Saftness: The labor, large equipment, electric saws and iron nails are used much less on the building site, which leads to simplified on-site management and the safer construction.
- Q:Plastic deformation of the template how to solve or why the deformation Thank you I want the reason
- Pvc plate deformation are: physical deformation and chemical deformation.A physical deformation, the cause:???? High temperature lead to deformation, if it is such a deformation, targeted plastic raw materials for high temperature modification, can effectively improve such problems???? Improper textile lead to deformation, such deformation has two reasons, a plate of raw materials can not meet the actual requirements of the product requirements, re-deployment of raw materials formula to meet the actual requirements of the product can be. Second, the processing and storage methods are not correct, leading to deformation, such problems can solve the problem from the rootTwo chemical deformation: mainly the molecular structure of raw materials change.
- Q:Is there a kitchen toilet to seal the water pipe plastic template? Where to sell?
- Hardware stores have, any one hardware store can buy, you can buy the nearest.
- Q:Types of building templates? What is the water template?
- Building a template, the use of rear surface roughness is better, do not need to deal with the second. Provincial workers, time-saving.
- Q:Want to purchase a number of building templates and found a new plastic building template, do not know how the quality?
- Why can not, now the plastic template, called light building materials, China is not yet a few plants can do a good job, after the air-conditioning refrigerator to use this, light and hard, not you like this, you can do with the wall, Now high-end are imported.
- Q:Europe and the United States national construction template is made of plastic or wood
- With plastic construction, then, is the most solid touch on the back, Europe and the United States part of the country after the earthquake so the use of wood plus wire
- Q:I heard that there are building aluminum template and plastic template it? Which is better?
- Wood-plastic building templates in the construction works more useful, more affordable, more convenient.
- Q:Why the floor is not plastic building materials square wood and template
- Must be strong and durable, the environment is bad, need to find strong
- Q:Shear wall plastic template for the wall height and thick ratio requirements is how much?
- Plastic building template to be extended when the expansion joints: As the plastic building template than the steel mold, wood mold thermal expansion coefficient larger, morning and evening laying plastic template must be reserved for about 2 mm expansion joints (according to the size of the day the temperature difference ), No need to reserve the expansion of the slit at noon. The length of the nail is generally 1.5 inches to 2 inches is appropriate, not too long or too short.
- Q:Does the building plastic template use it? How's the effect? Can I use 30 to 50 times? Can the fire protection requirements of the steel plate on the cast-in-place plate be achieved?
- I used, hand drawing is very convenient, can use hundreds of times, made of plastic
- Q:Why is the building template made 1830mm * 915mm and not made 2000mm * 1000mm it?
- Can be ruled length processing, can be ruled length processing, can be ruled length processing
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
EANTE excessive formwork 80×85×2.5
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords