Zebra Blinds Fabric Korea Combi Blinds Flexible Led Curtain Screen
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Overview:
1.Pivot the vanes to easily control light and privacy.
2.These motorized vertical blinds come in a variety of materials, from soft fabrics to durable faux wood, offering both a contemporary alternative to drapery, and the more traditional look with wood blinds slats.
3.It can control in 4 different ways. They can draw left, right, center, or opposites.
4.These blinds are offered in a variety of colors and textures, sure to suit your home
or office decor needs.
Features
1.We can make any requirements in design, pattern, color and size.
2.We can make customer's logo on the surface of products.
3.The dimension tolerance of our products is controlled within 0.03mm.
4.Our products are exported to America, Europe, India, west Asia, etc., and conforms to the standard test.
Specifications
Product Name | Roller Blinds |
Material | Fabric, 100% polyester |
Coating | Acrylic coating |
Width | 60/80/100/120/140/160*4000px |
Length | Customized |
Color | Various |
Light Fastness | >4.5 Grade |
Roller Tube | Aluminum alloy 17/25/28/32/35/38/40mm |
Bottom Rail | Aluminum alloy, flat shape/arc shape/round shape |
Operation System | Cord string / plastic chain / metal chain/remote controller |
Operation Method | Up/Down |
Used For | Bedroom, Hotel, Balcony, Sitting room, Hotel, Office etc. |
Function | Shading, heat insulation |
Product Pictures
How to place an order?
1.Tell us your requirement, samples can be provided if needed.
2.Confirm the sample after receiving.
3.We send you price.
4.Confirm the price and other details such as lead time, payment, shipment.
FAQ
Q1: Could I make an order that under the minimum order quantity?
A: Definitely you could if you trusted and give us an opportunity to have a long-time business relationship with yours and this is our pleasure to help you.
Q2: Which kind of payment do you accept?
A: We accept T/T, Western Union, and Escrow.
Q3: How About the shipment?
A: Usually it is by air or by express (DHL, TNT, EMS, FedEx)
We are offering direct factory prices and quality is among the best in the market.Thanks for your viewing and happy shopping.
- Q: Bedroom has two windows, small window with what curtains are good
- With the same window to do the same curtains. You can go to the curtains shop to see more. Ask the best curtains to do the curtains
- Q: Because the district inside the floor too close, opposite people every move are clear, empathy, people see me so, I feel very private, would like to install a ventilation and breathable, but also to ensure the privacy of the curtains, may I ask Blinds and gongshe siege yi ya amount of Tongfan wide cloth yarn curtains which is good? (The first layer of yarn, a layer of thick cloth), but the feeling of summer is particularly hot, not ventilation, even if it is a single drop yarn layer is also the case, is not the blinds than thin Is the yarn ventilated? But some people say that blinds are easy to bad, more contradictory
- Window frame built-in measurement method Width: respectively measure the high, medium and low width of the interior wall of the window frame. With the narrowest width minus fifteen millimeters, and then adjusted to a multiples of five millimeters as the width of the curtains. Height: Measure the left and right sides of the interior wall of the window frame and the middle height, with the minimum height as the actual height of the curtain. The width of the actual window is plus a hundred millimeters; the height of the actual window is plus one hundred and twenty millimeters. The user should reserve space between the window and the curtain so that the window switch does not affect the normal operation of the curtain. Maintenance Guide: Sweep the curtain with a sharp sweep. Regular use of vacuum cleaner brush suction (for shutter and organ curtain). If necessary, you can gently wipe with a wet sponge; if you need to strengthen the detergency, can be added to the water and cleaners. If you want to stop, you must first turn the leaves to the vertical wall and then pull up. If you want to stop halfway or stop, then pull the rope to the Right 45 degrees, the whole curtain will automatically fasten. Installation method: measure and determine the location of the installation code; fixed installation code; the blinds placed in the correct position; fixed screws. Decorate E station
- Q: Home decoration did not do the curtain box, how to install curtains, there is a remedy?
- With a Roman pole can be, it is divided into single rod and double rod, if you must add curtain, with double-sided sticky can
- Q: Office afternoon sunshine came in more dazzling, want to buy a curtain.
- Insulating glass As the desiccant in the aluminum frame through the aluminum frame above the gap to keep the glass hollow air long-term dry, so the insulation performance is excellent
- Q: Curtain feng shui curtain of the direction of what pay attention
- the living room: the larger living room is appropriate to fall cloth curtains, with sand, without shading cloth, style can be added to the curtains
- Q: How to install the blinds, ah, how the installation code and blinds connected to the map
- Step 1: Prepare work. . embedded in concrete or brick made of anchor, should be installed with charts, models, instructions and instructions with. . blinds and if the stone side adjacent to the stone should be coordinated with the stone to facilitate the installation of the blinds. . the assembly should be as far as possible beforehand on-site measurement to confirm the aluminum blinds unit scale, location and installation. . manufacturing and factory assembly, should be based on the field of measurement results to adjust the assembly to reduce the adjustment in the field, bonding and mechanical convergence and on-site combination. Step 2: Install. . blinds should be installed vertically and aligned with the adjacent face arrangement. . the use of hidden anchor, bolt washers should be made of copper or lead to protect the metal surface and the formation of close contact. . the exposed surface should be accurately connected to form a tight node; according to specify the seal material and seal material perforation and opening. . due to assembly and bonding required for the cutting, welding, grinding operations caused by the decoration surface damage should be trimmed, repair and dressing the work required to strive to surface beautiful and smooth. . with other metal contact with the hidden surface coated with zinc chromate coating. . the installation of shutters use the sealing material, should be based on the relevant provisions of the specification. The third step: cleaning. When you clean the shutters, you can put a linen glove on the outside of the rubber glove, stained with water, and the shutters with a cleanser are wiped or done.
- Q: The kitchen of the blinds covered with oil and dust above, may I ask what method can be quickly cleaned?
- Vertical curtains, verticalblinds, because the leaves of a piece of vertical hanging on the track and named, can be free to achieve the purpose of shading. Elegant, generous, bright lines. According to the different materials can be divided into: PVC vertical curtain, fiber fabric vertical curtain, aluminum vertical curtain and bamboo vertical curtain. According to the different operating methods are divided into: manual vertical curtain, electric vertical curtain. According to the appearance can be divided into: vertical vertical curtain, curved rail vertical curtain. The price is also a different degree of fear of cutting the feces cut into the irony quarrel, very cheap wholesale price of 10 yuan a square, high-end 100-200 yuan a square
- Q: How many types of curtains are the type of curtains and curtains
- Curtain of the rope, you can use a soft bristle brush gently wipe
- Q: Why do building glass curtains, shutters and other shelters and glass should not be less than 50mm
- Such problems are usually the experience and habits of the talks, no standard
- Q: Ah ah ah help me to do the wrong ~ I want to be the original cabinet to the results of the desk to the ~ ~ I am better talk even if the ~ ~ but now installed curtains problems ~ ~ If only Equipment and windows together with the curtains of the door that half of the side ~ ~ if the ground floor of the desk side of the ugly ~ ~ do not want to pretend to the left half of the right side of the kind of landing that fierce violence it ~ The The Does anyone have any opinion? The The I would like to really do not install a floor, do not shape, as long as shading ~ ~ directly to the right day to pull the right ~ ~ at night to pull the shade? The Or directly on the windowsill? The Outside the sun room ah ~ ~ ~ on the wall to ask advice ah ah ah ah ah ah ~ ~ ~ ~ ~ more
- Option 1 can use a straight Roman rail, a curtain on the left to do a window, a curtain! Do one on the right! Plan 2 left the big windows to make a Roman curtain, right to do a small Roman curtain. Also look good! Program 3 are doing aluminum alloy louvers! Program 4 to do around the shutter, this program the cheapest!
Send your message to us
Zebra Blinds Fabric Korea Combi Blinds Flexible Led Curtain Screen
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords