used cars 2nd hand cars used truck Trago CHM4250KPQ49V
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
used cars/2nd hand cars/used truck/Trago CHM4250KPQ49
- Q: Mondeo vehicle painting price
- The price of paint, then it depends on your car condition if it is not very serious, then generally not in the 4s shop, then the general also in 2500 or so 4s point may also point you remember to find a good master dry with a good varnish is not easy to change Yellowed.
- Q: What is the meaning of the vehicle's warranty period?
- That is, the terms of the warranty period there are two, one time limit, driving time 2 years; the second is the mileage limit, the driving mileage of 60,000 km. As long as these two conditions to achieve any one, it means that the vehicle warranty period has passed, the vehicle re-emergence of the normal maintenance are not free of charge.
- Q: What is the difference between the price of the vehicle and the LTL?
- Hello, on the same city of logistics and distribution, vehicle prices why the price will be lower than the zero parity, it is because the vehicle's single shipments to meet the needs of the vehicle, and a single delivery and delivery costs There is a reduction, and LTL as a ton of goods have a vehicle transport process, and the middle also have transit links, or loading and unloading services, so the price is relatively higher,
- Q: Road vehicles if you buy parts of their own cheap or cheap to buy cheap
- Depends on what stage you are ready to start, and if it is professional, the preferred is to buy their own parts, such as to get a 1W-2W road car, buy their own suite to install or go to the shop to pay the cost of installation That is the cheapest.
- Q: In the vehicle sales, billing why usually take a car a single way?
- Customer car to handle a series of procedures, tax, on the card, insurance, transfer, gift, scrapped, etc., and the car number, engine number, frame number is not the same. Can only be a single car can manage a good, for the future to bring convenience.
- Q: What is the role of car polishing?
- 200 or so, the car can wash the surface of the car wash can not afford to remove the dirty, throw finished light like a new paint, the drawback is the paint will be thin
- Q: Car annual inspection, the vehicle is not the standard?
- In the car inspection time, but then do not have to debug, because pay the money on the line. So theoretically, as long as you have time to casually on the line, the other one should pay attention to, but when a car inspection, but if you have passed, then repeat the line when you can directly skip the qualified Item, but in fact, but in fact, with the driver of the car has a great relationship, it is recommended that you go directly to the owners to take the initiative to reflect the situation of your car, the general pay the money is given directly, I was working in the test line
- Q: Why the car two days to play the fire, the starter did not respond, with a charger to charge the electricity will be able to name it! The battery is new for a long time, the Northeast card. When the voltage measured when the car about 14V, the generator should be no problem? The battery is always a loss of power which will be the problem?
- Check the line, one by one unplugging the insurance measured current. Carefully.
- Q: China Petrochemical vehicle for 93 gasoline price is how much?
- Changsha market, Sinopec: Guo Si 93 # gasoline 7320 yuan / ton.
- Q: I need to buy Merida or Giant brand titanium alloy mountain vehicle, not diy, first-line brand bicycle manufacturers in the titanium alloy?
- Bird's Nest Gymnasium, 3W multi-made, titanium alloy, the kind of material, Merida, Giant is currently no one-stop production of titanium alloy mountain bike
Send your message to us
used cars 2nd hand cars used truck Trago CHM4250KPQ49V
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches