• TUV CE Listed T8 24W Frosted LED Tube with 5 Years Warranty System 1
  • TUV CE Listed T8 24W Frosted LED Tube with 5 Years Warranty System 2
TUV CE Listed T8 24W Frosted LED Tube with 5 Years Warranty

TUV CE Listed T8 24W Frosted LED Tube with 5 Years Warranty

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
3 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Color Temperature:
Pure White
IP Rating:
IP44
Lamp Body Material:
Aluminum
:
,,,
Power(W):
18
Light Source::
LED
Warranty(Years)::
3
Lamp Luminous Flux(lm)::
1800
Working Lifetime(Hour)::
50000
Lamp Luminous Efficiency(lm/w)::
160
Input Voltage(V)::
AC100-240V
Lamp Power(W)::
18
Color Temperature(CCT)::
2800K~6500K

    

Product Pictures

 

   TUV CE Listed T8 24W Frosted LED Tube with 5 Years Warranty

  

Advantage

 

Quality First------Competitive Price 

 Advantages 

• 2835 SMD LEDs with high luminous efficiency. 

 • T8 size shape with G13 socket. 

 • Optimum light uniformity and high color homogeneity 

 • Extremely robust with aluminum heat sink and polycarbonate cover. 

 • Power Factor: 0.95.

 • Overpower, short and open circuit protected. 

 • NO noise, NO flicker, NO UV and IR.

 • Mercury-free and RoHS compliant.

 

Packaging

 

 

1. All the products are safely packed for air transport, ocean shipping and express. The LED products are packed in inner box with paper card or shockproof sponge, then put them into outer carton.

2. Different quantity of products are packed in one outer carton, as 10 or 20 pieces, according to the product size or customers’ requirements.

           TUV CE Listed T8 24W Frosted LED Tube with 5 Years Warranty

 

  

FAQ

 

 

Q1: Your company is manufacturer or trader?
A1: We are the large building materials supplier in China, about one thousand kinds of products in our company, the company's brand is very big, and there are a lot of production base, our greatest advantage is the ability to do resource integration, we can provide many kinds of you need to building materials, and can offer competitive price.

Q2: Your company provides the product quality is guaranteed?
A2: Our company has a dedicated staff in factory for a long time, before the shipment, it’s need to have strict quality control, if the quality is unqualified, we pack the goods on site personnel are not allowed. So that you can rest assured that any problem after you receive the goods, we will cooperate with treatment.

Q3: Is there a minimum order quantity of your company? What is the minimum quantity?
A3: Our minimum order quantity is 500 m2, and general size is 4 m wide and 25 m long, if you have any requirements, we also can pack according to your request for production.

Q4: Can send free samples?
A4: The sample is free for your test, but the freight is borne by you, DHL gives us a discount when export, if you like, you can first turn fold after the freight to our account, cost savings for you, also, of course, how to run it up to you.

Q5: What is your company's payment terms?
A5: Our terms is advanced payment T/T 100%.

Q6: How long is the lead time? Will there be late delivery?
A6: The delivery time is generally for 20 days, occasionally there will be a late delivery happens, in order to guarantee the quality of the products, we will not neglect the quality of products in order to catch the delivery date. If you want to delivery of the goods as soon as possible, still have to confirm the order as soon as possible, lest delay.

Q7: Your company's products have SGS, CE certification or FIFA?
A7: Do you trust, lawn export certification we can provide you need.

Q8: Can price reduce some again?
A8: As the saying goes, a price points a points goods, the quality of our products are through strict control of, if you demand is big, we can give you discount.

 

Q:If the led lamp is replaced, the lamp power should be small
Yes the LED lamps and lanterns is a new rising in recent years a new kind of technology With high wattage than the brightness of lamps and lanterns Good quality Is to use small LED chip do hair luminous brightness of the light source Wide Angle
Q:What are the details of the whole process of the LED lamp?
LED lamp tube application CE certification, notice two aspects 1, sample selection, had better be to isolated power supply, power supply aspects need separate power supply L/N line at one end of the input, and weight requirements, should not exceed 500 g is 1.5 meters. It is difficult to meet the weight requirement by more than 1.5 meters. For other details, look at specific products and specific analysis. There are specific tests, detailed analysis... 2, the detection organization's choice. There are international authorities such as TUV, ITS, etc. Customers have these special requirements. According to customer's requirement. It is best to choose domestic CNAS. , Note: in March 2013, LED lighting was added to EN 62493: test standards for 2010, enforcement.
Q:Are led fluorescent tubes not available for lighting?
If home have a stent is built-in LED lights to be the most is to take the rectifier, and the external power supply is to use the power of the manufacturer to provide, so to be more back to safe some more energy efficient, at the same time LED the longer service life
Q:How do LED lamp tube install how connection?
1: leds are built in, so you don't have to install them directly. 2: the LED tube is an external power source, and the original (electronic or iron core) ballast is removed and replaced by an LED power supply that can be attached to the LED lamp. 3: you also need to pay attention to the LED lamp is double side into electricity or single-ended into electricity, double side into power two ends electricity across the electrodes (note) single-ended into electricity is a head into the electricity but also need to pay attention to is the cathode
Q:Buy LED fluorescent tubes to see which parameters
Power efficiency, power factor Output power (the voltage * output current of the output LED)/the input power. This parameter is especially important if the low efficiency means that a large portion of the input power is converted into heat. If it is installed inside the tubes will generate a very high temperature, and the led chip will generate heat, and would have a higher temperature, the superposition of all electronic parts within our power supply will increase with increasing temperature and shorten the service life. So the efficiency of power supply are decided life the most fundamental factor, efficiency is not too low, otherwise consume too much heat on the power supply. Power factor on the value, the power factor is the ratio of active power and apparent power, namely the cosine Φ = P/s. low power factor, can produce a large amount of reactive power, power efficiency and will also cause disturbance to the grid, it will be high to the requirement of engineering and the factory! General requirement efficiency is above 80, power factor is above 0.8. Brightness, longevity The current led lighting tube is 90-100lm/watt, and the life span is more than 20,000 hours, and the chips and power supply should be paid attention to. We adopt a 3-ampere, long power supply to ensure the quality of the lamp.
Q:Is an LED 20 watt equivalent to 40 tubes?
The equivalent of 40 to 60 w. Theory led luminous efficiency is more than 10 times of incandescent lamp, energy-saving lamp is 2 to 3 times, but according to the feeling of the human eye not probable, because the led color temperature difference is very big, also is white is a lot of kinds, unlike CFLS in general only warm white (3000 k) is the white (4500 k) two kinds, calculate by is white multiples this is true, but when the temperature above 6000 k will feel a lot of dark, smooth color slants, a bit like a jack-o '-lantern, so buy the led lamp in the guest is white, the bedroom to warm white (3500 k) advisable, can't see how much watts.
Q:How is the T8LED fluorescent lamp installed?
The first step is to make sure that the lamp is powered by a single end, or a two-stage power supply, and the second step is to use the direct or new direct.
Q:What is the most suitable power efficiency for leds?
It's about 0.97, it's still pretty high, I bought the lamp tube of zhaochang, very bright, used for two years, still like new
Q:Homemade studio, what's the light? What light tube, cold light, warm light
The lighting of the studio must be cold, not hot. Lighting can according to your cost budget, if the budget is generally can consider to use tricolor cold light lamp, LED lamps and lanterns can be used if the budget are high. Because you will need to photography, this is so light to adopt professional lamps and lanterns, lamp should also be taken with a standard for color temperature of bulb, generally it is to use 3200 k color temperature of bulb, philips and osram can choose.
Q:Can compatible inductance ballast, electronic ballast led fluorescent lamp tube which have to sell?
Technical implementation is a little difficult. And instant implementation, price estimates are not low.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords