Timer Beam Formwork H20 with Support System in China
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 100000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Timber-beam Formwork
.Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost.
. The system is convenient for construction and it is easy to control the quality.
.The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. Tie-yoke and tie-rod are used to reinforce the corner.
2. Main Features of Timber-beam Formwork
.Standardized production lines
.Easy transportation and storage
.Finger jointing of the flange and web
3. Timber beam wall formwork Images
4. Timber-beam Formwork Specification
.Shearing force failure load: 40kg
.Supply capability: 3000m/day, L=6600mm
.T=18mm&T=21mm
.In standard thickness, moisture content 10%
5. FAQ of Timber-beam Formwork
1) What can we do for you?
.We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
.We can provide fashionable and newest styles for you.
.We can provide you the professional design team.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers.
.Shipping time: Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
- Q: What is the use of building wall formwork support? Thank you
- To build a scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction.
- Q: Technical specification for construction formwork safety JGJ162-2008 who has made me please
- This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction.
- Q: 1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
- General principles for the implementation of 1.0.1 in the construction of formwork engineering in China to implement the principles and policies of safe production, to achieve advanced technology, economic and reasonable, easy to apply and to ensure safety in production, the development of this specification. 1.0.2 This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction. 1.0.3 template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation work to improve the reuse rate. The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
- Q: 86335 template support, what is the concept of those advantages
- In the case of the construction industry, after 20 years of this industry, dedicated to technical analysis and improvement. After painstaking research, invited the domestic industry elite Magi to discuss, repeated demonstration, combined with the actual measurement through the practice of technical staff, spend long time hard work. Finally invented this new type of digital steel template support combination structure, so far spent ten years of painstaking research on the huge sums of money technology finally succeeded. To fill the gaps at home and abroad (with our understanding of the current international and domestic architectural template combination structure has not been any new structure), and won the national invention patent.
- Q: Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
- Here we use multiple beams, and the waterproof, thermal insulation, in tile.What is the waterproof tile?Timber can do SBS? Don't understand what you mean, if not the construction of SBS membrane surface; or SBS polymerization coating applied to the beams? Feel that is not necessary, just like a bit of preservatives, like the outside paint brush.
- Q: What is the building template support
- (1) the material of the template support: high performance cold rolled steel, thickness of 2.5 mm to 2.7 mm, the new material is characterized by: corrosion resistance, elasticity, strong deformation.(2) the specification of new steel building formwork support:
Send your message to us
Timer Beam Formwork H20 with Support System in China
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 100000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches