Sprinkler
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Sprinkler, mainly is suitable for the municipal, roads, gardens, water behind the front, watering, also with high-pressure water gun, jet distance, jet range, the world's fourth largest auto manufacturer SINOTRUK, our vehicle three assembly of all his research and development production. It has the characteristics of high stability. Convenient and unified management on the fitting
Engine Horsepower | Transmission | Drive axle | Front axle | Direction machine | cab | Tire | Remarks |
266、290、336、371 | HW15710 HW19710 | MCY13Q ST16 | HF7 | ZF8098 | HW76 HW79 | 295/80R22.5 |
The upper part containing water behind the front, sprinkler, water cannon. The upper part of the size can be adjusted according to the customer demand |
- Q:I 120 kg 183CM to ride long distance about 1700 km is not to go to Tibet is to buy a good car or a good assembly of the vehicle, then recommend an assembly, then expert list of a list of the best price psychological price 4500 to 5000 Thank you Kazakhstan needs load capacity Strong point
- Recommended low-cost to buy the vehicle is better, more than 2500, then the assembly draw, the general 1000 or more cars you can look at the basic configuration almost, less than 2500 cars you assembled a car, the parts may add up and the market price Of the vehicle almost, if the bulk of the words can be a space, higher than 2500, then you calculate the value of accessories and freight, the general assembly is cheaper than the vehicle into one. Mainly to see what you want the price of the car. For example, ATX770 market price is 2248, and assembled a Giant ATX770 a car, then assembled down to about 1900 (including shipping but not including shipping), more than 100 assembly of each 1650 (Excluding shipping and assembly costs), and assembly of an ATX830 price may be as long as 4300, the market price is 5398. Like the price of the assembly on the cost-effective
- Q:I do not want to buy a car through the 4S shop, and I do not buy a car on the card. All parts of the car can be through OKorder, modified stores, and so a variety of ways to buy, only the body! The body seems to have rarely sold how to buy the body! Note that I want to be new! I want to assemble my own car!
- You are then the city, which Auto Parts City is the most famous is the Guangzhou and Nanning Wanli Auto Parts City, where there are accessories, what the body, can be found there
- Q:Train freight Lingdan, vehicle, container is what it means
- One section is the vehicle, the train tonnage is 60 tons
- Q:What is the difference between the price of the vehicle and the LTL?
- Hello, on the same city of logistics and distribution, vehicle prices why the price will be lower than the zero parity, it is because the vehicle's single shipments to meet the needs of the vehicle, and a single delivery and delivery costs There is a reduction, and LTL as a ton of goods have a vehicle transport process, and the middle also have transit links, or loading and unloading services, so the price is relatively higher,
- Q:Volvo car with what material to do
- Is made of ultra-high strength steel. But now many brands of body steel are not thick, and everyone else who do not say who else.
- Q:Spray the vehicle before painting
- 13, while the paint room dust removal time, the topcoat with thin material on the good, into the gun, adjust the gun pressure, the amount of paint and the fan. 14, take the gun facing the place to be sprayed first to blow a few times, the above dust blown away, and then sticky dust cloth Sassafras again (such as conditions permit, there are degreasing agent, you can first wipe with a degreasing agent. A touch of a Sassafer.) 15, began to spray the background color. (This is no way to explain in detail, because the aspects involved too much, each spray paint spray method will be slightly different.If you spray the whole car, first spray the plane and then spray the surface, is the first cover before and after the cover And then around the facade, but in some spray teaching video on a detailed introduction.) 16, until the background dry, spray light. 17, if it is finished paint, then the final transition with a flush on it.
- Q:I would like to go to college when the bike to prepare to buy about ten thousand mountain bike do not know what kind of good (please refer to the brand and model more the better). Is the assembly good or the vehicle is good? Please understand the people to thank the excitement
- Is a good vehicle to buy TREK6500 oil dish line control air fork (rockshox) xt deore
- Q:Roewe 550 car to do paint is good?
- Roewe 550 is a very high price of a car, in such a price, with a 1.8T engine, 6-speed oil-cooled dual-clutch, intelligent driving system, electronic hand brake and other functions, who can better than it? Click here to schedule a test drive.
- Q:What is the job of car making?
- Responsible for the manufacture of which aspects of the car production for the vehicle factory called the vehicle factory, those who produce engines and other spare parts factory called accessories factory. General OEMs are the final assembly, painting, welding and other tasks.
- Q:Motorcycle car no electricity loudsrhea? Can start to start, there is power after the start. what is the reason
- First look at the fuse, no problem, then check the battery voltage.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Sprinkler
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 500 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords