Solar panel LED street light
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 unit
- Supply Capability:
- 500000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description
Solar panel LED street light
Specification
Under Condition | 5.0kWh, 10 to 12 hours * 3 to 5 overcast nights |
Solar Panel: | 200W for 24V lighting Lifespan: 20 to 25 years |
Maintenance-free Gelled Battery | 100Ah/12V*2 pieces , sealed type, gelled Lifespan: 5 to 8 years |
Intelligent Solar Controller | 10A/24V, automatic light and time control Lifespan: 5 to 10 years |
Light Source | 60W LED, cool white 7200lm, 6500K, IP65 High-power and high brightness Lifespan: more than 80,000 to 100,000 hours |
Lamp Housing | Die-cast aluminum, IP65 Lifespan: more than 20 years |
Battery Box | Engineering plastic, underground of pole Lifespan: more than 20 years |
Cables | Armored cable, includes weather-protective cable glands |
Steel Pole System | steel, hot-dipped galvanized |
Warranty Time | 2 years for full system |
Payment Terms | L/C at sight or 30% T/T in advance and 70% before shipment or against copy of B/L |
Price Validity | 30 days after quoting date |
Image
Feature
SPARE PARTS POLICY
We provide 0.5% to 1% of spare parts for free based on the transaction amount.
Transaction amount $1000 ~ $19,999: 0.5% spare parts
Transaction amount more than $19,999 : 1% spare parts
Installation
We offer detailed instructions and videos for installation. Besides, FUTE Group can provide onsite installation training and technical assistance free of charge in initial period for large projects of more than 100 poles. However, all the travelling and food & accommodation costs shall be borne by the customer.
After-sale service
a. We will offer technical guidance and repair service for the whole life time of our products.
b. We promise to respond with customer’s questions within 24 working-hours.
Maintenance
Fute Group’s solar street lights are designed to be essentially maintenance free. In certain regions with heavy dust, snow, or extreme dry weather with little rain, however, some level of maintenance is required to ensure the proper function of the lights.
Typical maintenance schedule:
a. Every Week: Inspect street lights to ensure all the lights are working normally. If there are lights which are not lit, perform analysis to understand the cause and conduct repairs without delay.
b. Every Two Months: Inspect street light panels and clean ones which are covered with dust or sand. The best way to clean the panels is with a brush at the end of a long pole. Cares should be taken to avoid damaging the solar panels.
c. Every Five to Seven Years: Replace the solar street light batteries if the voltages drop below normal levels. The battery has an expected life of five-seven years.
Life Time & Warranty
Solar panel: over 25 years of power generation capacity, with a 5-year warranty
LED light: CREE chips or Bridgelux chips provide super-bright light from little power, need simple thermal management, and last up to 50,000 hours, with a 3-year warranty.
Controller: over 15 years of typical operating life, with a 3-year warranty, automatic operation from dusk to dawn or timed ON/OFF operation
Pole: up to 25 years of long life time, with a 15-year warranty
Battery: 5 ~ 8 years of maximum life, with a 1-year warranty
FUTE Group’s warranty does not cover damage caused during or after installation. The product components should be inspected as soon as the packaging is removed and any damage should be reported without delay. Once the product has been installed, We will not be responsible for any newly discovered damage. The product must be installed properly, with no unauthorized adjustments. Any costs caused by incorrect installation, including all accommodation and travelling costs of our technicians to the purchaser’s installation site shall be borne by the purchaser. Damages caused by lightning strikes are not covered. If there is the repair of electrical components without our permission or the use of electrical components not supplied by our company, any of the above warranties shall be exempted.
We reserve the right to substitute similar or better components in its lamp system provided that the product performs equally or better under the same guarantees.
FAQ:
We have organized several common questions for our clients,may help you sincerely:
①How about your company?
A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.
②How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
③How long can we receive the product after purchase?
In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served.
- Q:Solar street light solar panel selection of crystalline silicon or polysilicon
- The same wattage under the smaller size for sunny areas
- Q:Why there is no street lights on the highway?
- The future of highway installation lighting may become a trend, after all, lighting can reduce traffic accidents.
- Q:What are the dangers of streetlight glare?
- The type of glare direct glare: eyes look at the light when the glare glare, such as looking at the sun or the other day to the car lights
- Q:What is the street lamp
- Refers to the traffic lighting in the range of lighting within the lighting
- Q:Street lights to install what qualifications
- This qualification requires the Construction Committee and the State Grid Industry Management Office double approval
- Q:What are the benefits of Led Streetlights?
- LED lights have environmental advantages of pollution-free, low power consumption, energy saving
- Q:How is the street light control?
- Kind of light is the control, but the light control is too much trouble and the installation of the leaves is not so good so now is still more time-controlled
- Q:Which government department management is the street lamp?
- The State Construction Bureau co-ordinate the management, in accordance with the provisions of the Ministry of Construction management to determine the full-time management departments, so all local conditions
- Q:Night lights are not bright, how to tune
- It is recommended that the controller be re-commissioned.
- Q:How high is the street light?
- Special lamp type according to the design requirements of the installation, the height of the lamp in the equivalent of the need to be illuminated the width of the road.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Solar panel LED street light
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 unit
- Supply Capability:
- 500000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords