• PREFAB HOUS LOW COST AND NICE DESIGN 003 System 1
  • PREFAB HOUS LOW COST AND NICE DESIGN 003 System 2
  • PREFAB HOUS LOW COST AND NICE DESIGN 003 System 3
  • PREFAB HOUS LOW COST AND NICE DESIGN 003 System 4
  • PREFAB HOUS LOW COST AND NICE DESIGN 003 System 5
PREFAB HOUS LOW COST AND NICE DESIGN 003

PREFAB HOUS LOW COST AND NICE DESIGN 003

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
1000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

 

 

Q:What is the daily work of the warehouse?
Raw materials warehouse must be based on the actual situation and the nature of various types of raw materials
Q:What is the 5S in warehouse management?
because the Japanese Roman phonetic are "S" at the beginning and referred to as 5S management
Q:What are the processes required for the company's warehouse management?
In addition to the above three points, there is the inventory, according to the company's request, usually in a billing cycle of the starting point, the inventory will generally be on the warehouse in the stagnant goods or defective products to do The
Q:How can I manage the warehouse better?
to keep the inventory of goods, so that the number of accurate, good quality, to ensure safety
Q:How to do a good job Warehouse Invoicing?
The traditional manual record of goods Invoicing has been unable to meet the enterprise's warehouse management
Q:How to do warehouse management?
but the work of the smooth development of gas stations, reservoirs, spare tire, the normal operation of a unit can not be underestimated the decisive role.
Q:Recruitment of warehouse staff and warehouse manager of the quality requirements?
have a good professionalism, motivated, flexible response, work seriously responsible
Q:What is the meaning of goods warehousing?
Modern "warehousing" is not the traditional sense of the "warehouse", "warehouse management"
Q:What is the third-party warehouse function and responsibility?
Third-party warehouse that is the contract warehouse, refers to the logistics and other logistics activities will be subcontracted to the external company
Q:What do the warehouse keeper have to do and what should I pay attention to?
Second, keep abreast of the inventory status, to ensure timely supply of materials and equipment, give full play to the efficiency of turnover.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches