• Motor Grader Clg418 for Sale Road Machine 216HP System 1
  • Motor Grader Clg418 for Sale Road Machine 216HP System 2
Motor Grader Clg418 for Sale Road Machine 216HP

Motor Grader Clg418 for Sale Road Machine 216HP

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Motor Grader Clg418 for Sale Road Machine 216HP

Product Details

Basic Info.

Model NO.:CLG418

 

Type:Grader

Object:Gravel Road

 

Moving Type:Mobile

Mixing Method:Continuous Drum

 

Automatic Grade:Semi-Automatic

Product Capacity:40~400t/h

 

Certification:ISO9001: 2000, CE

Condition:New

 

Application:Road Construction

Export Markets:Global

Additional Info.

Trademark:LIUGONG

 

Packing:N/P

Standard:CE

 

Origin:Guangxi, China

HS Code:84292090

 

Production Capacity:6000sets/ Month

Product Description

 Motor Grader Clg418 for Sale Road Machine 216HP
ZF transmission
Liugong 418 grader
Liugong motor grader
 
Operator Comfort and Safety
Dustproof, sound reducing, shock absorbing and anti-UV cabin.
Comfortable adjustable suspension seating. 
Air Conditioning optional.
Full range of visibility.
 


Engine

Net Power160kw/ 2200 rpm
Blade Width3,960 mm
Maximum Speed40.3 km/h
Draw Bar Pull86 kN
Operating Weight15,500 kg

Motor Grader Clg418 for Sale Road Machine 216HP

Motor Grader Clg418 for Sale Road Machine 216HP


Q: How much is the rent for the grader? Where's cheap?
if time is long rent a low, if only for a day or a month, the price is high, so please ask some detail, I detailed answer for you, my Baidu account is my QQ.
Q: How long does a grader usually learn?Anonymous browsing | 343 times
One or two months or so can learn to open, or with the master behind the competent, it would take 4 months to a year to work alone.
Q: work for a long time it will not run away is not hot, well or don't have the 5 brake lockingTiangong 180 grader, two, behind the keel, burns, work for a long time it will not run away is not hot, well the brake locking or there are other reasons, very hard work. Dare not foot, big brother detail, how should repair?
If the brake block if the brake disc brake block that frequent hot normal run or long road, suggested that engineering vehicles don't run long, there is to see how the brake piston return, with little attention, hope to adopt
Q: What engine was built in 2006 for the Tiangong 180 Grader?
then staging Shoufu, 200 thousand or 300 thousand, several specific, you can call phone manufacturers, but now the grader not live well, do not know where you do
Q: What's the reason for the slow response of laser graders?
It can also be used as a site for weed or snow removal. At present, the flat machines produced in China can be divided into two kinds in general.
Q: Tiangong 200 grader, how much can you sell for 5 years?
About 400 thousand or so you can search the peak of heavy machinery limited company, with advanced technology products, absolutely, the first grader is from R & D, is the predecessor of Chinese day, was first introduced from Germany, the digestion and absorption of innovation has formed a series of products, the introduction for the purpose of nuclear test after flat cover of contaminated soil...
Q: How much is the grader at Lan Xiang school?
Divided into long-term and short-term classes, semester and learning content is different,
Q: Has anyone used the grader of China National Heavy Industry?
GoodAskHow do you sayChasing the answerThe work efficiency is very high and fuel saving, and compared with other domestic machine is still relatively durable.
Q: What are the factors that affect the flatness of graders?
The main causes of uneven slurry content are: water cement ratio is not strictly controlled; concrete mixing time is insufficient; mixing material composition is uneven; and concrete transport process segregation phenomenon. In bridge deck pavement construction, using half construction, concrete by truck and are often transported from the other half, the first concrete pavement after two coagulation disturbance, undermining the integrity of cement concrete bridge deck pavement, it is prone to cracking. 2. quality management and control institutions a perfect quality management and control mechanism is the key to improve the quality of construction. Construction units and supervision units must work closely together, always put quality in the first place, ensure strict control according to the standard in the construction process, and monitor the construction quality at any time.
Q: A friend of mine who has worked on a dragon grader, a dragon grader and a grader? I want to buy a second-hand dragon grader. What's the matter? I hope a group of friends give an opinion
Lonking m Lide vanadium machinery, the company specializes in flat machine series, the quality is very good, with the long industrial gear pump and hydraulic components

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords