• Motor Grader 722-6 New Model Hot Sale Pre-order System 1
  • Motor Grader 722-6 New Model Hot Sale Pre-order System 2
  • Motor Grader 722-6 New Model Hot Sale Pre-order System 3
Motor Grader 722-6 New Model Hot Sale Pre-order

Motor Grader 722-6 New Model Hot Sale Pre-order

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
11 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

Details

 

Feature: Motor Grader

Condition: New

Model Number: 722-6

Place of Origin: China (Mainland)

Brand Name: CMAX

Certification: ISO, CE

Warranty: 1 Year

Application: Building, Construction, Industrial

 

Main Features

 

1.Equipped with original Cummins engine
2. Single-handle electro-hydraulic controlled power-shift T/M, 6 forward &3reverse shifts makes operation easy and convenient
3. Hydraulic lock, auto lock/unlock NO-SPIN differential guarantees stability and powerful traction
4. Ideal axel load allocation provides excellent stability while cutting hard surface
5. Serviceable, efficient hydraulic system enables every part to be fully used
6. Box-typed frame and advanced T/M enable it to complete heavy-duty work
7. A wide working range is accomplished through flexible blade suspension system and articulated frame

 

Specifications

 

Motor Grader 722-6 New Model Hot Sale Pre-order

 

Images of Product

 

Motor Grader 722-6 New Model Hot Sale Pre-order

Motor Grader 722-6 New Model Hot Sale Pre-order

Motor Grader 722-6 New Model Hot Sale Pre-order

 

FAQ

 

 

Q1: If we can produce some Motor Grader 722-6 according to customers request?

A1: Yes, we can produce Motor Grader 722-6 according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q2: How to make a quick resolution for after service?

A2: OKorder and our manufacture both have overseas branches all-around of world, If needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.

 

 

Q: How do grader learn?
This exam, or find a school or teacher to learn it!!
Q: Excavators, flat machines, dump trucks, rollers, loaders, wearing parts have what?
There's nothing bad about love when you worry about your car, your skin, your net, your butter mouth
Q: How much is rent for the 180 Grader? Let's go for it ourselves
It's hard to say. I haven't seen anything like it yet,
Q: The Volvo grader gearbox is not two, three or four, stalls
This can search for "no repair repair, solve transmission failure" to find solutions, without any damage to the vehicle, but also to extend the transmission oil change cycle 3-5 times, effectively control the temperature of the transmission oil.
Q: Shantui grader maintenance what needs attention?
5) clean the cockpit glass and check whether all mirrors are in place.6) also pay attention to check the fuel tank storage capacity, fill the tank on time, when refueling, shall not be added to the fuel tank top, in case the temperature rise, the fuel spill. Check the ball head and the ball cover of the traction frame. Check every 50 hours of work, such as loosening should be tightened, loose should be adjusted. When adjusting the gasket, it should be replaced when worn seriously.
Q: Asphalt paver asphalt mixer jacking machine grader about how much money ah
Paver 300-400About 1 million of the graderImports and domestic differences are much older
Q: How to use the leveling machine to dig the side ditch? Side ditch, please help your friend
The first time when the blade angle adjustment will deepen to 11o, and then gradually increased to 16O, 21o, 26o, every increase 5O, plane angle 35o45o is unchanged, after each shovel put away the earth for the next time to deepen work, soil ridge formed by earth should be to avoid the rear wheels. Impact of the next operation. The last shovel work should reach the full depth and full width of the ditch. When the trench is dug to full depth, the outer slope should be trimmed. If the topographic conditions permit, can make the grader across the trench, the soil after cutting to ditch the outer edge of the shovel or with the shovel shovel of soil will be tangential to the rear ditch, then clear. If the limit of the terrain, can be tilted to the guide blade side side of the fuselage, the adjustment method of top.
Q: How much is the 160 Grader?
You can search the peak of heavy machinery limited company, with advanced technology products, absolutely, the first grader is from R & D, is the predecessor of Chinese day, was first introduced from Germany, the digestion and absorption of innovation has formed a series of products, the introduction for the purpose of nuclear test after flat cover radiation polluted soil. At present, all the domestic manufacturers of grader technology are spread out from the factory, and now the company is developing the largest horsepower grader, leading domestic technology, the price of about 2 million Oh!
Q: Sany's full hydraulic grader: how much is the PQ190C offer?
Of course, the price refers to the domestic engine. If you want to import power, but also to add a forty thousand or fifty thousand.
Q: How many days a day is the laser grader hm2?
And land gap, the driver's way of work, experience has a direct relationship, depending on the specific circumstances

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords