Led Ic Linkable Light X6
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 500 Pieces pc
- Supply Capability:
- 100,000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
LED flashing disco light(6 spots) Specification
Model No | LE-6CC |
Feature | >Have 47pcs LED in each casing |
>Separately installed in an interlock plastic casing | |
>With music responsive function to control the light flashing by the music | |
>Music sensitivity and flashing speed are adjusted | |
>AC/DC 14V 300mA adaptor | |
Lamp | LED |
Voltage | AC 110-240V |
Power supplier | DC 14V 300 mA |
Material | ABS Plastic |
Certification | RoHS,CE,EMC |
Product size | 34.6x13x36.5cm |
Packing | Inner box(4C gift box):36.5x13.5x35cm |
Master carton(4pcs/Ctn):38x28.5x71.5cm | |
Sample lead time | 7 days |
Delivery time | 30 days |
MOQ | 500 pcs |
INCOTERM | FOB shenzhen |
Payment term | T/T,L/C |
Application
Architectural decorative lighting
2. Car dectoration
3. Archway ,canopy and bridge edge lighting
4. Amusement park ,theater and aircraft cabin mood lighting .
5. Emergency hallway lighting
6. Auditorium walkway lighting
7. Widely used in the illumination of emporiums ,meeting room ,factory .light box ect.
Customized options
Customize your strip light by picture or by technical datas.
Packing & Delivery
Package:
plastic bag intside, cartons outside
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
- Q:Does the lighting for the workshop use energy-saving lamps or LED lights?.
- there is mercury pollution in the process of production and after the use of waste;
- Q:What are some good suggestions for plant energy saving lighting modification?
- the LED lamp replacement energy-saving fluorescent lamp, energy-saving lamp can reach more than 75% led
- Q:Lighting line connections?
- 2 parallel circuit: the circuit elements are connected together, the characteristic is: the current sanctions in the two part of the road branch, respectively through the two branches of the various components.
- Q:The sign and meaning of energy saving lamp
- A color mark marked with blue and white background, 50 mm long and 30 mm wide.
- Q:Voltage of lighting circuit in China
- The total voltage of a series circuit is equal to the sum of the voltage of each series element. The voltage across the series circuit is in direct proportion to its resistance,
- Q:Do the statutory holidays allow schools to assign homework to students?
- The forty-sixth article states: "citizens of the People's Republic of China have the right and obligation to receive education.
- Q:Building lighting in lighting, lighting should pay attention to what details?
- . Besides the light distribution characteristics, the appearance, material, dustproof, waterproof grade and so on are all the factors that must be taken into consideration.
- Q:Do you want city lighting?
- I am professional to do this, in fact, the concept of city lighting China is not deep, because the industry was founded only 15 years, but we already have a mature operating system, and LED lighting now have replaced the traditional light source, LED power consumption is only the traditional source of electricity consumption 15/1, light effect is also higher than him.
- Q:What does elevation lighting mean?
- The facade lighting light good color, three-dimensional sense of strong, low power required lighting device, can save power consumption, so it is widely used in the design. The facade lighting required illuminance size, should be highly regarded building wall material and reflection conditions around and lighting projection the same luminous flux to brightness produced by different reflectivity the wall is different.
- Q:What lamps or lighting energy-saving schemes are available for underground parking?
- I think you can go to Shenzhen Rui Rui look
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Led Ic Linkable Light X6
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 500 Pieces pc
- Supply Capability:
- 100,000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords