Gypsum Board for Drywall Partition for New Use
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m²
- Supply Capability:
- 80000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Gypsum Board/Drywall Panel 7/7.5/8/9/12/12.5mm
1.Core material: Gypsum board
2.Surface: heatproof and moist-proof
3.Low formaldehyde emission, conforms to E1 Standard of Environmental protection
4.Has the highest fireproof of Class B1, passed National Fire protection Authority.
5.Easy to install
6.Widely used in Hotel, Dinning Room, Shopping Center, Theatre,Dancing Room,Cinema, Station, meeting room, Office, Airport, villas and residential areas et
FAQ
1.How about the quality of gypsum board?
Well,that is a good question.
Please do not worry.
We have passed ISO and CE certification..
such as Australia,New Zealand,Thailand and Columbia,etc.
2.Which payment do you prefer?
T/T is ok(30% advance payment,the other 70% before shipping).
3.When will the product be delivered?
Usually within 10-20 days after receipt of advance payment.
Obviously,it also dependson the quantity.
4.Do you accept customized?
Yes,we will do our best to meet our customers' demand.
SIZE(mm) | KGS/PC | PCS/20GP | SQM/20GP |
1200*2400*7 | 17 | 1180 | 3398 |
1200*2400*7.5 | 18 | 1150 | 3312 |
1200*2400*8 | 18.2 | 1080 | 3110 |
1200*2400*9 | 22.1 | 970 | 2793 |
1200*2400*9.5 | 22.8 | 940 | 2707 |
1200*2400*10 | 23.5 | 900 | 2592 |
1200*2400*12 | 29.5 | 720 | 2073 |
1200*2400*12.5 | 30 | 710 | 2044 |
1220*2440*7 | 17.55 | 1160 | 3453 |
1220*2440*7.5 | 18.14 | 1130 | 3363 |
1220*2440*8 | 18.58 | 1060 | 3155 |
1220*2440*9 | 22.83 | 950 | 2827 |
1220*2440*9.5 | 23.55 | 920 | 2738 |
1220*2440*10 | 23.83 | 900 | 2679 |
1220*2440*12 | 30.5 | 700 | 2083 |
1220*2440*12.5 | 31 | 690 | 2053 |
- Q:3dmax drawing with vray rendering when the plaster on the ceiling will appear how to solve the dark spots, hemisphere subdivision and light breakdown are improved, or can not solve the supposed
- If there is a little bit of dark spots, it can only open the PS. This and the light of the sub-nothing relationship, light breakdown is mainly to reduce the impatient point, not to reduce the dark spots.
- Q:Bedroom 23 square meters to do ceiling, gypsum board ceiling about how much cost? Integrated ceiling
- Bedroom with gypsum board ceiling it, integrated ceiling for kitchen and toilet.
- Q:Is the gypsum line calculated by the perimeter of the house ceiling or by the total perimeter of the gypsum line?
- Calculate the actual length of the gypsum line.
- Q:Gypsum board ceiling hanging good, can cut off part?
- Just say a word that theoretically said it is possible to see you on the actual effect of the degree of care! For example, when the original time is symmetrical or have other intentions, then there is no way to know. You can contact the original decoration of the construction team once in place it! And the price and talk!
- Q:What kind of workers are the ceiling workers?
- Ceiling (English name: sprung roof) refers to the housing living environment of the top decoration. Simply put, refers to the decoration of the ceiling, is an important part of interior decoration. Ceiling with insulation, insulation, sound insulation, sound absorption of the role, but also electrical, ventilation and air conditioning, communications and fire, alarm pipeline equipment and other projects hidden layer. Home decoration ceiling is a common part of home improvement.
- Q:Gypsum board ceiling, always cracks, what is the reason?
- Gypsum board ceiling causes cracks ???? First, the fixed hanging bolt expansion bolt selected location is wrong ???? 1, the top plate to fight the fixed fountain line, the first to find the floor joints, the general construction of concrete construction here for the concrete irrigation, the first line on the use of this seam. ???? 2, hanging point spacing in the construction requirements of the requirements is 900-1200mm, the specific construction, the hanging point spacing can be within this range according to the floor width modulus to determine, so as to avoid the occurrence of lifting points, but also to avoid hammer Break the floor when punching prestressed tendons, affecting the floor force. ???? In case of a fixed point falls in the floor hole there are two ways to deal with: 1, in the appropriate space around the hole again. 2, with 50 × 50 iron thickness 3-4mm nut tightening spot welding.
- Q:Use gypsum board to do the ceiling, the general life of how long, I always feel inside the rust after the wire will fall, there is no one professional know?
- Gypsum board ceilings generally do not drop to; national standards; as follows: According to the normal distribution of hanging a general 1 square meter, diameter 6mm-10mm; main keel spacing 300mm-600mm; Gypsum board and keel connection is self-tapping screws, generally 200mm a fixed; The project is not in this row;
- Q:Decoration plaster line is good or gypsum board ceiling effect map
- Beautiful words, of course, gypsum board. But the cost is relatively high. Gypsum line is now more popular. Cheap. Beautiful.
- Q:About 75 square meters or so, would like to decorate into a similar effect inside the map, a total of how much money ah (including labor costs and all materials)
- Ceiling, it should be 70 yuan per square
- Q:My family living room layer of the plateau 3030MM, hanging 2-level ceiling hanging chandelier position 2800, is now the gypsum board top with the original roof 23CM spacing How to install crystal chandeliers, chandeliers are heavier, carpentry said with the expansion of the top Fixed, I would like to ask 23CM gap can play up the expansion of silk? As well as the staircase position is now inclined to the top of the hanging now, the above empty 1 m 4 high, wood workers at that time to leave a ceiling with the boom that the lamp fixed on top. Can I? The ceiling are finished now all the latex paint are brush, and buy online buyers say that the poor installation, so to help!
- Today, the 23 cm spacing, the impact drill has been unable to drill, unless the 23 cm bottom panel removed. Staircase position reserved for the hanging bar, for the installation of lamps is feasible and correct - the installation of crystal lamps, then also need to reserve this hanging, and that hanging between the top (ho) and the floor between the The connector is the expansion bolt.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Gypsum Board for Drywall Partition for New Use
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m²
- Supply Capability:
- 80000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords