Flexible Led Strip Light Christmas Led Lights
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 5 Meters m
- Supply Capability:
- 40000 Meters m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
flexible led strip light christmas led lights
Item No. | ML-B1228RGB60-TOP |
IP | 20 |
Material | PCB |
CRI value | >80Ra |
Input Voltage | DC12v |
Out Power | 72w |
Light Source | SMD5050 led |
Beam Angle | 120° |
Working temperature | < 60°C |
Color | RGB |
Quality Warranty | 2 Years |
LED QTY | 300pcs |
Certificate | CE, RoHS |
Lifespan | 50,000hrs |
Package: | fistly rubber by bulb bag, then box, carton. |
Application Environment |
Product Show:
Advantage
1: pretty appearance as quality
2:more than 80% energy -saving
3:long life span(50,000h)
4:Easy to install and use
5:RoHS and CE cetification
Features
1: Designed with constant current technology
2:Perfect structure design withaluminum base to disperse heat easily
3:The latest indoor illumination product with comprehensive application
4:Easy to install and low cost of maintenance
5:High lumen, high power, lowv degradation,low heat
6:We are led factory and specilized in designing and developing the LED lamps
7:LED chip from taiwan or Epistar, Bridgelux.Cree etc.
8: High lumens output, low heat and functing is more steadier.
9:Healthy beam, without ultraviolet radiation &infrared ,no radicalization
10:Green lighting, without mercuty&Plumbum and other relative hazardous substance
11:Eyesight protection, DC dirive without frequency flash,eye will not be tired easily when light
Terms&Conditions
1.Trade terms:FOB SHENZHEN
2.Sample lead time:7 working days once we comfirm the order or recieved payment
3.Minimum order:MOQ is 10 meters per item
4.Payment Terms:T/T ,L/C
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
- Q: What are some good suggestions for plant energy saving lighting modification?
- the theory of life can reach 50000 hours, to the factory lighting energy saving renovation has brought great benefit.
- Q: Aomori Festival
- Time is not a holiday, the city of Aomori is August 2nd to 7, Hirosaki city is August 1st to 7, five in August 4th to 8 is set up. People use traditional Japanese paper to make huge square paper seat lights and parade them up and down the streets with their lighting.
- Q: Voltage of lighting circuit in China
- The series circuit current is equal, 50 lights are connected in series, and the current flowing through them is equal, which is 200mA=0.2A;
- Q: Festival lights are connected by a number of light bulbs connected to the lighting circuit
- When the lighting voltage is 220V, 10 "12V" and "10W" series connected to the lighting circuit, the voltage of each bulb is 22V, over the rated voltage of the bulb, the bulb will be burned out. Therefore, A error
- Q: LED lighting energy-saving transformation really good?
- Ed lighting energy-saving transformation, the general use of LED lamps instead of the original fluorescent lamps, metal halide lamps, halogen lamps and other high-power old lamps
- Q: Zhengzhou Chuangxing for Lighting Design Co. Ltd?
- With excellent design and advanced technology, the company fully displays the potential artistic charm of light and shadow, and beautifies people's life with light.
- Q: What are the energy saving measures for lighting and distribution?
- the office, the computer room, the control room, the shop, the dining room, the guest room and the bathroom mirror lamp and so on should use the straight tube lamp, the decoration request high place may use the compact fluorescent lamp (hereinafter called CFL)
- Q: Do the statutory holidays allow schools to assign homework to students?
- The forty-sixth article states: "citizens of the People's Republic of China have the right and obligation to receive education.
- Q: About the brightness of LED lighting
- The second problem is that the spotlight cup uses only the angular astigmatism of the LED itself
- Q: What does elevation lighting mean?
- Building facade lighting design and other lighting design are very different, it is based on the original building, through the bright lighting changes, color changes to show the characteristics of the building. Therefore, we must fully understand the design of building function, building network
Send your message to us
Flexible Led Strip Light Christmas Led Lights
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 5 Meters m
- Supply Capability:
- 40000 Meters m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords