Flexible Led Strip Light Christmas Led Lights
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 5 Meters m
- Supply Capability:
- 40000 Meters m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
flexible led strip light christmas led lights
Item No. | ML-B1228RGB60-TOP |
IP | 20 |
Material | PCB |
CRI value | >80Ra |
Input Voltage | DC12v |
Out Power | 72w |
Light Source | SMD5050 led |
Beam Angle | 120° |
Working temperature | < 60°C |
Color | RGB |
Quality Warranty | 2 Years |
LED QTY | 300pcs |
Certificate | CE, RoHS |
Lifespan | 50,000hrs |
Package: | fistly rubber by bulb bag, then box, carton. |
Application Environment |
Product Show:
Advantage
1: pretty appearance as quality
2:more than 80% energy -saving
3:long life span(50,000h)
4:Easy to install and use
5:RoHS and CE cetification
Features
1: Designed with constant current technology
2:Perfect structure design withaluminum base to disperse heat easily
3:The latest indoor illumination product with comprehensive application
4:Easy to install and low cost of maintenance
5:High lumen, high power, lowv degradation,low heat
6:We are led factory and specilized in designing and developing the LED lamps
7:LED chip from taiwan or Epistar, Bridgelux.Cree etc.
8: High lumens output, low heat and functing is more steadier.
9:Healthy beam, without ultraviolet radiation &infrared ,no radicalization
10:Green lighting, without mercuty&Plumbum and other relative hazardous substance
11:Eyesight protection, DC dirive without frequency flash,eye will not be tired easily when light
Terms&Conditions
1.Trade terms:FOB SHENZHEN
2.Sample lead time:7 working days once we comfirm the order or recieved payment
3.Minimum order:MOQ is 10 meters per item
4.Payment Terms:T/T ,L/C
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
- Q:CREE semiconductor lighting pay no
- In case of holidays or rest days, you should pay in advance on the most recent working days. Wages shall be paid at least once a month, and wages paid by week, day and hour shall be paid by week, day and hour.
- Q:How much does LED lighting save more than regular lighting?
- As far as the luminous efficiency of monomer is concerned, LED is ten times higher than incandescent.
- Q:Festival lights are connected by a number of light bulbs connected to the lighting circuit
- When the lighting voltage is 220V, 10 "12V" and "10W" series connected to the lighting circuit, the voltage of each bulb is 22V, over the rated voltage of the bulb, the bulb will be burned out. Therefore, A error
- Q:What are the main points of power distribution and lighting energy-saving supervision?
- According to the construction drawings, according to GB50411 - 2007 "building energy conservation project construction quality acceptance specification", the provisions of the fourth section supervision
- Q:The sign and meaning of energy saving lamp
- At present, China's lighting products have two kinds of energy-saving certification mark: "CQCES energy saving" and "Festival" word mark
- Q:Energy saving of urban lighting
- The focus of urban lighting energy-saving work is urban nightscape lighting. A) implement a single project in accordance with the overall urban lighting plan
- Q:Building lighting in lighting, lighting should pay attention to what details?
- Building lighting should be performed according to the design of the building and the coordination of lighting effects, because the appearance of the building is very different, so we should choose a lively representation to decide, so as to achieve good results.
- Q:The festival lights are strung together by a number of small light bulbs connected to the lighting circuit
- the lighting voltage is 220V, 10 "12V, 10W" series connected to the lighting circuit,
- Q:How to use electric car storage battery and energy saving lamp to produce street lamp
- Battery car battery series voltage, battery voltage and battery charge used vary greatly, in order to make the power supply voltage regulator circuit lamp will not be too complicated, so to the battery lighting device power supply voltage should not be too high, with a 12V battery to supply it.
- Q:What are the energy saving measures for lighting and distribution?
- the office, the computer room, the control room, the shop, the dining room, the guest room and the bathroom mirror lamp and so on should use the straight tube lamp, the decoration request high place may use the compact fluorescent lamp (hereinafter called CFL)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Flexible Led Strip Light Christmas Led Lights
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 5 Meters m
- Supply Capability:
- 40000 Meters m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords