• Easy Clean Pleated Window And Door System System 1
  • Easy Clean Pleated Window And Door System System 2
  • Easy Clean Pleated Window And Door System System 3
Easy Clean Pleated Window And Door System

Easy Clean Pleated Window And Door System

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
20000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Introduction of Easy Clean Pleated Window And Door System


The latest in European styling, the ScreenSolutions Plisse is the newest and most innovative retractable screen designavailable. So simple to install that almost anyone can do it in as little ashalf an hour.
This elegant, stylish, pleated screen is unlikeany other screen on the market. This unique product has low-profile bottomglide is making it ideal for any locations. You can leave the screen in anyposition without any spring action and will stay in that position till you moveit.


Avaiable Size for Easy Clean Pleated Window And Door System

Single door width: 800-1500mm Height: 1900-2700mm
Double Door width: 1600-3000mm Height: 1900-2700mm
Other special size could be also available


Advantage for Easy Clean Pleated Window And Door System

▪The mesh cassette could be removable then easy to clean and when damage the mesh, each to change the new mesh.

▪(6063-T5) aluminum alloy outline border. Hardness ≥12.

Environmental no-lead process surface, thickness ≥1.0.

Anti-friction, spring folding net, PET and terylene are optional.

▪Anti-friction and anti-striction draw cord, with special process.

▪Advanced adhesion machine, first-class adhesion technique.

▪Super anti-friction rivet, can stand up to 100,000 times friction.

▪Super amphiphobic process makes a complementary (e.g bulge and concave) structure.


▪Super loeophobic performance after super amphiphobic process

▪Super dewatering performance after super amphiphobic process



Q: Plastic doors and windows are plastic doors and windows or belong to the metal doors and windows? Stainless steel blinds are metal doors and windows or special doors and windows?
Plastic doors and windows are plastic doors and windows are not metal doors and windows Stainless steel blinds are special doors and windows
Q: Metal doors and windows (aluminum doors and windows) installation engineering inspection batches need to do a separate qualification? Is not to aluminum alloy doors and windows of the company's qualifications to do
Generally do not need, you can drink a party to talk about. Pay the management fee to the total package
Q: Metal doors and windows of the three qualifications in the 4000 square meters refers to the building area or doors and windows area?
Is the area of the doors and windows area, or else specifically in the metal doors and windows three qualified business requirements inside
Q: Is the metal doors and windows of the decoration qualification banned?
The current civil construction does not have the installation of technology, personnel, equipment, which will be a slowly transferred over
Q: Metal screens can be used how to stick ah.
1. Use dry cloth or sandpaper will be followed by the surface of the dust, oil, rust, etc. to remove, and then acetone or trichlorethylene and other cleaning agents to clean the surface to clean. (A: B = 2: 1); in order to ensure the use of the effect, but also pumping a vacuum and then use the same, in order to ensure the use of the effect, The 3. Note that the use of time must be used within the run out, or will be solidified, resulting in waste of material, 24 hours after the maximum strength. 4. After coating at room temperature 2 to 6 hours curing 40 degrees to 50 degrees 1 to 3 hours curing; glue 24 hours after use; ten days after the sticky better. Cold and wet days, need 15 to 25 degrees room temperature bonding as well. 5. Adhesive face. After pouring the surface. After the glue must be sticky paper stickers. Or 502 glue positioning. Epoxy Resin Adhesive Epoxy Resin AB is made of epoxy resin based two-component high temperature adhesive, mainly for high temperature metal, ceramic and other adhesive. The use of temperature operating temperature of -50 ~ + 180 ℃, short-term up to +250 ℃.
Q: Metal doors and windows project what acceptance criteria
Metal door frame installation must be strong, the number of embedded parts, location, buried connection method and anti-corrosion must meet the design requirements. Aluminum alloy doors and windows and non-stainless steel fasteners should be done between the anti-corrosion treatment. Soundproof door seal installation position is correct, fan frame closed tight. Inspection method: observation, inspection of hidden engineering records.
Q: Do metal doors and windows project, do a more convenient, want to know the process and time
Metal doors and windows engineering contractor qualification is divided into one, two, three. The qualification of new enterprises can only be reported from the third level. Three qualification standards: 1, the company nearly two years to undertake the following three items in more than two metal doors and windows construction, project quality qualified. (1) metal doors and windows of buildings of 6 or more buildings; (2) area of ??1000 square meters above the metal doors and windows works; (3) single contract amount of more than 1 million yuan of metal doors and windows works. 2, business managers with more than 2 years of project management experience; technical person in charge with more than 5 years engaged in metal doors and windows construction technology management experience and has the relevant professional intermediate titles; financial executives with intermediate or above accounting titles. Enterprises with titles of engineering and economic management of not less than 8 people, including engineering and technical personnel of not less than 5 people; engineering and technical personnel, with more than mid-level titles of not less than 3 people. Enterprises with three qualifications above the project manager of not less than 3 people. 3, the registered capital of more than 100 million enterprises, corporate net assets of more than 1.2 million. 4, the enterprise nearly two years the highest annual settlement income of more than 3 million yuan. 5, the enterprise has a metal doors and windows processing, production of the plant area of ??not less than 500 square meters, and a matching processing, production, installation equipment and testing equipment.
Q: Construction general contracting special qualification can contract metal doors and windows project?
Construction general contracting special qualification is to contract metal doors and windows works
Q: Less than three months of pregnancy are all wood furniture processing plants, as well as metal doors and windows processing plant will affect the tire
There are a lot of harmful gases in the processing plant, and it is better to stay away from it
Q: Metal doors and windows to install the project quality requirements which
Door and window installation to meet the installation process, at any time to check and adjust the installation quality of each process. Window frames and window holes are to draw the center line, the window frame into the hole when the center line alignment, the frame angle for temporary fixed, carefully adjust the window frame of the vertical, horizontal and straight angle, the error should be within the allowable deviation range.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords