• Common Nail/Polished Nail/ Wholesale Factory 1 System 1
  • Common Nail/Polished Nail/ Wholesale Factory 1 System 2
  • Common Nail/Polished Nail/ Wholesale Factory 1 System 3
Common Nail/Polished Nail/ Wholesale Factory 1

Common Nail/Polished Nail/ Wholesale Factory 1

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
10 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Material:
Carbon Steel,Stainless Steel
Standard:
ANSI,BS,DIN,GB,ISO,JIS
Power Supply:
AC Power,DC Power,Gasoline,Diesel
Customized:
Customized,Non-Customized
Surface Treatment:
Polishing,Zinc Plated,Nickel Plated,Copper Plated,Chrome Plated

1.Structure of Common Nails Description

1.Material: Low Carbon Steel Wire Q195

2.Length: 3/8"-7"

3.Wire gauge: BWG4-20

4.Surface treatment: polish or galvanized

5.Capacity of 20’container: 27 tons

6. Usage: industrial construction/wood work 


2.Main Features of Common Nails

flat cap, round bar, diamond point, bright surface, strong rust-proof

3.Common Nails Images

Common Nail/Polished Nail/ Wholesale Factory 1

Common Nail/Polished Nail/ Wholesale Factory 1

 

4.Common Nails Specification

LengthWire Diameter (mm)
1”1.6mm  1.8mm
1-1/2”2.1mm
2”2.8mm  3.0mm
2-1/23.0mm
3”3.4mm
4”4.2mm
5”5.0mm
6”5.0mm
As to your requirement


5.FAQ

1.Q: Could you send me your catalogue and price list?
A: As we have more than thousands of products, it is really too hard to send all of catalogue and price list for you. Please inform us the style you interested, we can offer the pricelist for your reference.

 

2. Q: How about the quality of your product?
A: 100% inspection during production. Our products are certified to ISO9001,   TS16949 international quality standards.

 

3. Q: What material of the product can you supply?
A: Carbon Steel, Alloy Steel, Stainless Steel, Brass, Copper or according to your requirement.

 

4. Q: What's the delivery time?
A: For products in stock, we can ship it within 7 days after receiving your payment. For custom order, within 24 tons, production time is 15-20 days after confirmed every details.


Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords