Calcined Anthracite made from TAIXI anthracite with stable quality F.C. 92%
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100mt m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Calcined Anthracite F.C. 92%:
Place of Origin:Ningxia China
Type:Anthracite
Application:Anthracite coal
Product Type:Carbon additive
Fixed Carbon(%):90
Moisture:(%):1
Advantage and competitive of caclined anthracite:
1. strong supply capability
2. fast transportation
3. lower and reasonable price for your reference
4.low sulphur, low ash
5.fixed carbon:95% -90%
6..sulphur:lower than 0.3%
Specifications of Calcined Anthracite F.C. 92%:
PARAMETER UNIT GUARANTEE VALUE | |||||
F.C.% | 95MIN | 94MIN | 93MIN | 92MIN | 90MIN |
ASH % | 4MAX | 5MAX | 6MAX | 7MAX | 8MAX |
V.M.% | 1 MAX | 1MAX | 1.5MAX | 1.5MAX | 1.5MAX |
SULFUR % | 0.5MAX | 0.5MAX | 0.5MAX | 0.5MAX | 0.5MAX |
MOISTURE % | 0.5MAX | 0.5MAX | 0.5MAX | 0.5MAX | 0.5MAX |
Usage/Applications of Calcined Anthracite F.C. 92%:
Steel making & Anthracite coal
Packaging & Delivery:
Packaging: According to customers' requirements
Delivery:As soon as possible
We are also strong at below materials, please contact us if you are interested in any of them:
Calcined Petroleum Coke
Carbon Electrode Paste
Carbon Electrode
Calcined anthracite (Injection carbon, charge coke)
- Q: Various types of coal coke are the main test items
- The basic instrument of coal laboratory of these conventional indicators required are: calorimetry, sulfur detection apparatus, muffle furnace (Gao Wenlu), or when the microcomputer controller temperature controller, drying oven (oven), instrument, glial layer measuring instrument, the ash melting point determination of caking index, in addition to auxiliary equipment: crusher, pulverizer, electronic balance, vibration sieve machine, two points etc.. The above is the coal test indicators by Hebi Huanuo coal testing equipment factory to provide, I hope to help you.
- Q: What is the difference between coking plant and coke plant
- Never heard of coke plant, coking plant is the production of coke products, there are other chemical products, it is estimated that you said the coke plant is the purchase of other people's desire to sell second-hand coke traders.
- Q: Why is coke used in blast furnace steelmaking?Why not use coal?
- (2) reduction: high temperature gas generated in coke combustion in the raceway, passed to the material in the process of heat rising, the endothermic reaction and coke formation, CO and H2, then CO and iron oxide in iron ore reduction reaction is transformed into metallic iron.(3) the role of the skeleton: the blast furnace smelting process occurs in the movement and interaction between the rising of the gas and the falling of the charge. The pellets, coke, iron ore, ore and other materials according to a certain proportion, and batch sequence into a blast furnace, blast furnace smelting in reducing atmosphere under the hot metal, after providing to the steelmaking plant of the steel-making.
- Q: What's the connection between coking coal and coke
- Coke: the quality is hard and the hole is thick, the short hair will be wiped awayCoking coal is a kind of bituminous coal with medium caking property and strong caking property. The title of bituminous coal with high degree of coalification. Main coking coal.
- Q: 8 points will be isolated from the air to enhance the heat of coal, in addition to the main coke, but also the material listed in the following table: No.
- The structure of benzene and toluene is similar, and the molecular composition is different from that of a CH2 atom cluster, which is called homologous;(5) the number of chloro compounds in the hydrogen molecule is equal to the number of hydrogen atoms in different environments, and toluene has four kinds of hydrogen atoms in different environments: methyl group on the top, the benzene ring on the top of the 3 species, and so on, there are 4 kinds of chlorine compounds in toluene,
- Q: Purpose of using coke in iron making raw materials
- It can capture the oxygen atoms in iron oxide or magnetic iron oxide to form carbon dioxide. The reaction equation is as follows:3C+2 (Fe2O3) = ==3 (CO2) +2Fe at high temperature2C+ (Fe3O4) = ==2 (CO2) +3Fe at high temperature
- Q: Coke crushing, coke plant equipment, coke jaw crusher, coke crushing equipment prices, manufacturers offer? How is the output of these equipments?
- The number of cracks has a direct impact on the strength and crushing strength of the coke, the index is generally measured in terms of crack degree (the number of cracks in the unit volume coke)
- Q: How long should it be to store coke in the open air
- So, in addition to avoid rain and direct sunlight, ventilation is.Coal and coke stored in an airless environment, a large degree of risk. The temperature is too high or spontaneous combustion has been easy to stuffy.
- Q: What is the effect of coke moisture on the blast furnace?
- 2, if the long-term use of water containing high coke and blast furnace gas purification system and dry, it will affect the normal operation of the purification system (filtration pressure increased, serious and even lead to normal filtration, also lead to dust can not be normal unloading etc.); more serious for the blast furnace with net gas said not even a normal discharge (top pressure tank or a pressure higher than indoor clock dozens of kPa
- Q: How much coke is needed for a ton of iron
- Blast furnace production is continuous. A generation of blast furnace (from start-up to overhaul shutdown of generation) to continuous production of more than ten years. The production, from the top (usually roof is composed by Bell and hopper of modern blast furnace is the valve bell and bell less top) constant load of iron ore, coke, flux, from the lower part of blast furnace tuyere blowing hot air (1000 to 1300 degrees Celsius), sprayed into the oil, coal or natural gas. Fuel
Send your message to us
Calcined Anthracite made from TAIXI anthracite with stable quality F.C. 92%
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100mt m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches