• Aluminum Adhesive Tape For Thermal Cold Insulation System 1
  • Aluminum Adhesive Tape For Thermal Cold Insulation System 2
  • Aluminum Adhesive Tape For Thermal Cold Insulation System 3
Aluminum Adhesive Tape For Thermal Cold Insulation

Aluminum Adhesive Tape For Thermal Cold Insulation

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
800 roll
Supply Capability:
80000 roll/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Aluminum Adhesive Tape For Thermal Cold Insulation

Description 

Aluminum Foil Tape is made of aluminum foil as backing material which single coated with acrylic adhesive of excellent tackiness and adhesive layer is covered with a protective silicon paper as release liner. Aluminum Foil Tape has excellent resistance against chemical corrosions due to the protection of a thin layer of aluminum oxide which coated on the surface of aluminum foil carrier.

 

Aluminum Adhesive Tape For Thermal Cold Insulation Features 

Aluminum foil surface is well prepared for efficient wetting, bonding and adhesion durability

Excellent flame resistance, outdoor weathering as well as good ultra-violet light (UV) resistance

Good thermal conduction and light reflection due to silvery chemical elements in aluminum foil

Water-proof carrier has excellent ability as protective equipment against vapor, dust and rusting

 

Aluminum Adhesive Tape For Thermal Cold Insulation Pictures

 

Aluminum Adhesive Tape For Thermal Cold Insulation

Aluminum Adhesive Tape For Thermal Cold Insulation

Aluminum Adhesive Tape For Thermal Cold Insulation

 

 

Aluminum Adhesive Tape For Thermal Cold Insulation Specification 

Item

product structure

Aluminum foil

Dry glue

Total thickness

T-1801SP

18m

 38um

 56um

T-2601SP

26um

 38um

 64um

T-3001SP

30um

 38um

 68um

T-4001SP

40um

 38um

 78um

T-5001SP

50um

 38um

 88um

 

FAQ

We have organized several common questions for our clientsmay help you sincerely

How long can we receive the product after purchase?

In the purchase of product within 10 working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 20 to 25 working days can be served.

 

How to guarantee the quality of the products

We have established the international advanced quality management systemevery link from raw material to final product we have strict quality test; We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

What is the storage condition?

The welded wire mesh should be stored at room temperature and kept from wet and heat source.

Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
After learning that feel boring, to diverted it, brush point repair it. Architectural design institute will need to design equipment (that is, plumbing) design talent, that is, will generally participate in architectural design, the wages should be
Q: Air conditioning ventilation when the sound is a big reason
Buried plastic pipe under external load, the diameter of the vertical diameter deformation rate should be less than the allowable diameter of the pipe deformation rate The diameter of the allowable diameter of the pipe shall not be greater than 5% The diameter deformation rate of the pipe and the allowable diameter deformation rate are calculated as follows: ε ΔD / D0 × 100% [ε] ε0 / K where: εΔD pipe in the combined load (Mm) [ε] Permissible diameter Deformation rate ε0 Elastic diameter Deformation rate (%) of pipe, by the flattening of the diameter of the pipe diameter (mm) The test determines the K safety factor, generally desirable 15
Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Embedded stove, such as the use of rubber tube connection, then the rubber tube in the platen, often subject to heat radiation easily aging; and aging, falling more difficult to find, so many local poisoning and other vicious accidents
Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Can be small, according to your roof to do what material.
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.
Q: What is the whole heat exchange fresh air ventilator?
Second, the new insulation decorative board is integrated through the production line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing construction energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing Building energy-saving transformation of the preferred materials
Q: External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q: Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q: HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords