• Aluglass Foil Tape Foil tape Duct Tape Cloth tape System 1
  • Aluglass Foil Tape Foil tape Duct Tape Cloth tape System 2
  • Aluglass Foil Tape Foil tape Duct Tape Cloth tape System 3
Aluglass Foil Tape Foil tape Duct Tape Cloth tape

Aluglass Foil Tape Foil tape Duct Tape Cloth tape

Ref Price:
$1.00 / roll get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
50 roll
Supply Capability:
50000 roll/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Aluminium Foil Tape Description

1. Specifications of Aluminium Foil Tape

     PROPERTIES

UNIT

VALUE

TEST METHOD

Alu Foil Thickness

micron

30

GB

Adhesive Coating

g/m2

40

GB

Adhesive Type

-------

water acrylic

GB

Peel Adhesion

N/25mm

11

GB

Rolling Tack(11mm ball)

cm

20

GB

Fire Rating

-------

Class 0

BS476

Temp Resistance

°C

-20-+120

ASTM E84

1) Roll length: 27m-1000m

2) Roll width: 50mm-100mm

3) Jumbo roll: 1.2m x 1,200m, 1.2m x 1,000m

2. Applications and Features of Aluminium Foil Tape

1) HVAC system for building thermal insulation,suitable for sealing seams and joints of various laminated insulation facings.

The applications include: Duct Wrap, Wall Insulation, Metal Building Insulation,

Pipe Insulation, Hot Water Tank Insulation.

2) Electronic refrigeration fields ,Used for refrigerator industry,  masking operations in electroplating and paint stripping, also good at protecting cable splices, metal patching and sound dampening applications.

3. Package & Delivery of Aluminum Foil Tape

Inner packing:

Cut roll: printed core and shrink wrapping

Log roll: cardboard wrapping

Jumbo roll: plastic film + corrugated board wrapping

Outer packing:

Cut roll: carton

Log roll: carton + pallet / ply-wooden case

Jumbo roll: ply-wooden case

 

 

4. Production Flow of Aluminum Foil Tape

The main producing procedure includes the following steps:

Raw material-Adhesive Coating-lamination-Wrapuping-Cutting-Packing

5. FAQ of Aluminum Foil Tape

We have organized several common questions for our clientsmay help you sincerely  

1.    How about your company

A world class manufacturer & supplier of Aluminum Foil Facing and is one of the large-scale professional investment Aluminum Foil Facing bases in China. Annually more than 1000 containers of Aluminum Foil Facing are exported to markets in Europe, America and Japan.

2. What is the storage condition? 

The Aluminum Foil Facing should be stored at room temperature and kept from wet and heat source.

 3. How to guarantee the quality of the products

We have established the international advanced quality management systemevery link from raw material to final product we have strict quality testWe resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 4. How long can we receive the product after purchase?

In the purchase of product within four working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 7 to 10 working days can be served.

 

Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Embedded stove, such as the use of rubber tube connection, then the rubber tube in the platen, often subject to heat radiation easily aging; and aging, falling more difficult to find, so many local poisoning and other vicious accidents
Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Not the ,,, mobile air conditioning inside the compressor, the winter heating also need the compressor, but also a ventilation pipe, charged heating Well?
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
The general level of more than 12 layers when you need to use.
Q: External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q: Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
Q: HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords