50W UL Led Spot Light
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 20000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
1. Features
-Aluminum alloy ADC12, Fine sand oxidation surface, bright silver/black.Nice appearance and long service life.
-Use unique heat-dissipating design and thermal conductivity aluminum as heat-dissipating material to ensure the high heat-dissipating performance.
-60% energy-saving compared with traditional lights.
-Professional optical design ensure the high light efficiency.
-Use fog lens to eliminate the glare.
-Beam angle:45°.
-Long life span up to 30,000 hours.
-Fully compliant with RoHS and CE standard.
Technical Parameter of the PAR30
-Input Voltage: 100-240V AC;50/60Hz.
-Max Current: 0.12A
-LED type: 5730 LED
-LED Number:24 pieces
-Output Power: 12W
-Shell color: oxidation bright silver, oxidation black
-Use environment: -20 °C to 45 °C
-Net weight: 0.218KG
-Gross weight: 0.3KG
-White box size: 115 * 115 *130mm
-Package size: 485 * 485 * 315mm (32PCS per box)
Main Applications of the PAR30
-Hotel, super market, meeting rom and reception desk lighting;
-Forum, fair, and hall lighting;
-Advertisement, cabinet and cupboard lighting;
-Home use lighting.
2. Specifications
3.Dimensions
4. Production of Flowsheet
5. Images
6. FAQ
We have organized several common questions for our clients,may help you sincerely:
①How about your company?
A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.
②How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
③How long can we receive the product after purchase?
In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served.
- Q:The difference between floodlight and LED to shoot the light
- Hello!!!!! Waterproof, omni can be waterproof, but it is difficult to do waterproof shoots the practicability, floodlight used outdoors, but shoot the lamp to be more used for indoor power size, floodlight can reach the maximum power of far distance is much bigger than that shoots the light projection, omni range than shoot the light
- Q:Help: anyone know how high power LED small shoot the light and the light band?
- Conventional seven holes small shoot the light with the power of flooding into account, perhaps within 3 w - 4 w LED lights with a meter with 4-15 w, if you are buying into back slot instead of T5 fluorescent tube with the words should be within 10 to 15 w
- Q:Motorcycle lens and the LED lamp can be installed at the same time, and shall not affect the circuit?
- Can be a switch control by an external switch to control
- Q:Led to shoot the light is broken how to change
- Nails dig is commonly used in the edge of the lamp tube (position) linking to the smallpox condole top, a little bit hard pull became one! Two used to locate the wire spring clip!
- Q:Led lamp and cob light which is suitable for hanging the sitting room
- COB is a new way of LED packaging Belong to the point light source Condole with canister light
- Q:LED to shoot the light flash when open, a period of time is normal
- This is very normal! Especially used for the first time, slowly is normal. Low voltage will be flashing, should avoid to use.
- Q:The sitting room how to shoot the light off?
- The removal of circular suck chandelier on the head: If bedroom absorb dome light is round, when removing the time to pay attention to. Step 1: turn off the ceiling lamp power, only turn off the power supply, to ensure the process of removal is safe. The second step: use a screwdriver slowly down the chimney of the iron ring around 3 small screw, then rotate until unscrewed the lampshade. Step 3: remove the light bulb.
- Q:How to choose to shoot the light
- Of LED lamp encapsulation: resin encapsulation and silica gel encapsulation. Resin encapsulation is some cheaper price, because the cooling performance is a bit poor, the other is the same. Silica gel encapsulation of the cooling performance is good, so the price a little expensive than resin encapsulation.
- Q:Want to buy a track first and then buy several different wattage of led track light to try and see what specifications apply. I don't know between different brands and wattage led track lamp, is common
- Orbit, there are two lines, three lines, four line. LED track shoot the light rail head to match the orbit (that is, the lamp with the rail joint should match), otherwise will not come up. China and southeast Asia line usually use more. Usually three lines with more Europe. Now the LED track shoot the lamp to the parameters of the large difference of different brand.
- Q:The ceiling of a ceiling light is of general size
- The first is the difference between the different wattage specifications: on the one hand the size of the lamp for 35 w generally has two kinds: The first is a opening, width is 205 * 90, the size of the high of 170; The second is opening, width is 243 * 106, the specifications of the high of 198. And 20 w lamp is generally only one, that is opening, width is 235 multiplied by 106, the specifications of the high of 198. A third type of even 50 w to shoot the light, the size of the gas is opening, width 235 * 106 plus 198.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
50W UL Led Spot Light
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 20000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords