24W 300x1200mm LED Square Panel Light
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5 Pieces pc
- Supply Capability:
- 3000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detailed Product Description
Led Panel:
1.OEM ODM
2.Certifications:CE&RoHS
3.24W,300*1200mm
4.Warranty:2 years
LED panel Light Detail Specifications:
Item |
HC-30120 |
Material |
Aluminum alloy |
Input Voltage |
AC85-265V |
CRI |
74-80Ra |
CT |
2700-7000K |
Short Current |
<5mA |
Work frequency |
50-60HZ |
P F |
≥0.9 |
IP |
20 |
Work Humidity |
<90%RH |
Storage temperature |
-30-60°C |
Operating temperature |
-10-50°C |
Luminous flux |
3320±10%LM |
Certifications |
CE&RoHS |
Warranty |
2 years |
Main features:
1. Environment friendly, no flashing, no UV or infrared, low heat radiation, mercury free, no polluting material in the process of application;
2. Easy installation, direct replacement for traditional grille lamp;
3. The imported optical light panels used for even illumination;
4. Soft natural light;
5. Superior raw materials. Stylish everlasting color aluminum frame with advanced anodized and oxidation treatment. Modern &
elegant appearance makes the ceiling more graceful;
6. Ultra thin design, 15mm in thickness.
7. Aluminum alloy body and leading light transmitting Optical PMMA cover.
Application:
1. Residential buildings, institution building, home;
2. Office, meeting room;
3. School, library;
4. Factory, warehouse;
5. Hotel, casino;
6. Parking, garage;
7. Hospital;
8. Commercial lighting;
9. Supermarket, shopping mall
- Q:Are there any projection lights that can be used in major cities?
- The company is located in Zhengzhou Henan hi tech Development Zone, with a total area of more than 3000 square meters, including more than 600 square meters of modern office space and more than 2000 square R & D, trial production and production processing center. With more than 200 employees, including 20 senior engineers, 15 quality inspection staff, 16 senior foreign trade personnel, 12 domestic sales team, more than 10 after-sales service team.In the projection products industry, especially high-tech LED projection lamp and high-power outdoor projection lamp field, Le Di photoelectric will be your reliable and powerful partner.
- Q:Do you see the star light on the wall or the wall?I want to put it out in the open space on the outside, just like the effect of the fireworks. I stay in the sky. I don't know where there is such a star light. I can see the effect in the air
- Production: in PVC rubber (projection film) ` ` in the sky with crayons, pictures painted on the stars. And then divided into six corner pieces, and then combined with ``OK!Satisfaction, please adopt.
- Q:How does the projector light the picture?
- Advertising is the use of LOGO projection lamp optical projection principle, using high brightness light source,
- Q:The whiteboard projection light doesn't turn on, the alarm light and the power indicator red light at the same time
- Your problem should be the bulb fault of the projector. Recommend you change the emperor's projector and electronic whiteboard, service life will be 2 to 3 times longer than the average length
- Q:When I go shopping to buy, not on the Internet, and almost like this, but there is a sound, but I ask the lights to sell online, they say, without sound, when I bought the clerk tried to give me, the sound can be turned off T-T for help
- One switch is to control the main lights and music, and the other is Lantern and rotation, that is, no music, but also lighting effect, then only turn
- Q:Where is the projection lamp?
- At the same time, after more than 2 years of development, the company has become the domestic production of projection lamp manufacturers, which have the strongest comprehensive strength, the most R & D patents, product quality satisfaction of the projection lamp manufacturers. In November 2015, the future plan and development of China projection lamp, which was established by many domestic projection lamp manufacturers, was called by Le Di photoelectric companyLeague planning.....Le Di photoelectric, with excellent product quality, careful technical services, rapid response to the installation and after-sales team and a steady stream of products and technology updates, well deserved to become a projection lamp,
- Q:The scientific projection lights of the adults should be assembled by themselves, but when they are glued to the lampshade, I wonder if the edges should be folded or folded inside. Fold outside feel bad, folding inside afraid of affecting the projection effect, such as a shadow, what. Ask for help ~!Not asking which face is outward. When you ask each surface to stick together, does that extra edge need to be folded inside or inside the ball?
- When you can't tell yourself what you learned today, you don't go to bed. - Lixidun Fort
- Q:it is necessary to tear off the outer protective film, how to tear it? You can't see it. It's annoying!
- How can I tear it off? Look, there's no need to tear it
- Q:Are there any differences between the light projector and the projection lamp?
- Spotlight categories: 1. under the spotlight. Can be installed in the ceiling, the head of the bed, cabinets, but also hanging, landing, suspended, divided into the whole Tibetan and semi Tibetan two types.
- Q:How do you do routine maintenance of projection bulb?
- The light bulb is most afraid of long-term bakingUse, was according to the inquiry found, originally formed mostly due to factors still take the initiative to shut down the projector bulb temperature is too high, the heat can not be dissipated in time when the formation of the projection lamp and the internal temperature of the machine is too highWhen the projector self thermal protection function will take effect, accordingly, the operating status of the projector will automatically switch over to protect the situation -- take the initiative to shut down, now you don't have to do the projector, or worried, first adopted by theMethod is to be active projector shutdown after about half an hour, you in accordance with the general boot order to open the projector, general can let the projector rehabilitation normal operation.Originally, processing initiative off the most radical solution, one is to construct the projector cleaning of dust regularly, to ensure that all the wind road smooth and maximum limit to the bulb cooling; another is not to let the projection lamp is not betweenThe long-term operation - that users don't make continuous projection homework 5 -- 6 hours or more, especially in the high temperature environment, even if there is a cooling fan can play a cooling effect, but the long-term high temperature bakingIs still very simple light bulb life decay.
1. Manufacturer Overview |
|
---|---|
Location | Guangdong,China (Mainland) |
Year Established | 2009 |
Annual Output Value | US$10 Million - US$50 Million |
Main Markets | North America; Southeast Asia; Western Europe |
Company Certifications | CE; RoHS |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | 81% - 90% |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 5 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range |
Send your message to us
24W 300x1200mm LED Square Panel Light
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 5 Pieces pc
- Supply Capability:
- 3000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords