• 2014 New Holiday Lights System 1
  • 2014 New Holiday Lights System 2
  • 2014 New Holiday Lights System 3
2014 New Holiday Lights

2014 New Holiday Lights

Ref Price:
$0.62 - 1.03 / pc get latest price
Loading Port:
Shenzhen
Payment Terms:
L/C,T/T
Min Order Qty:
5000 Pieces pc
Supply Capability:
100000 Pieces pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

General Introduction

2014 new holiday lights  

 

Specification

Place of OriginChina (Mainland)
MaterialPC
Model NumberHoliday lights F50-D
ColorRed
Length88mm
Width52mm
Voltage12V or 24V AC/DC;130V or 240V AC
CertificateCE,FC,ROHS
WaterproofIP65
Delivery30 days after deposit

 

 Our Services  

1.Your inquiry related to our products or price will be replied within 24 hours.

 2.All your inquireies will be well explained by our experienced staff.

 3.OEM&ODM,also provide customized service

 4.Distributorship is available for your unique design and some our current models.

 5.We will keep secret for customer sale area,design ideas and all other private information

 

Customized options

Customized label/ Logo can be made onto packing box.

 

Packaging & Delivery

 

Package:

1 x Box

Standard exporting box or color box as your require

 

Delivery:

Shipping Service

Estimated Delivery Time

DHL

2-8 business days

FedEx

3-8 business days

TNT

2-10 business days

UPS

1-7 business days

EMS

6-14 business days

ePacket

7-12 business days

China Post Air Mail

7-15 business days

China Post SAL

14-30 business days

By sea

30-40 business days

1. 3-10 business days for Sample Orders; 7-40 business days for Bulk Orders.

2. "Business days" means Monday-Friday, excluding holidays.

3. DHL and UPS cannot ship to military or P.O. boxes address.

4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.

Q: CREE semiconductor lighting pay no
In case of holidays or rest days, you should pay in advance on the most recent working days. Wages shall be paid at least once a month, and wages paid by week, day and hour shall be paid by week, day and hour.
Q: Aomori Festival
Time is not a holiday, the city of Aomori is August 2nd to 7, Hirosaki city is August 1st to 7, five in August 4th to 8 is set up. People use traditional Japanese paper to make huge square paper seat lights and parade them up and down the streets with their lighting.
Q: How to choose lamps and lanterns? Inventory factors affecting consumer spending
When are consumers accustomed to buying lights at nodes? Consumers know brand information through those channels? How to choose lamps and lanterns
Q: Festival lights are connected by a number of light bulbs connected to the lighting circuit
When the lighting voltage is 220V, 10 "12V" and "10W" series connected to the lighting circuit, the voltage of each bulb is 22V, over the rated voltage of the bulb, the bulb will be burned out. Therefore, A error
Q: Zhengzhou Chuangxing for Lighting Design Co. Ltd?
Our first-class occupation lighting designer team, we carefully read every city, every building and every place, understand
Q: The sign and meaning of energy saving lamp
the two signs all indicate that products meet the requirements of national standards for energy conservation evaluation.
Q: Notes on installation of lighting for 105W high power energy-saving lamp factory building
, after all, the market is mixed with many products, uneven quality.
Q: The festival lights are strung together by a number of small light bulbs connected to the lighting circuit
he voltage of each bulb was 22V, exceeding the rated voltage of the bulb, the bulb will be burned out. The A error.
Q: What are the main points of power distribution and lighting energy-saving supervision?
According to the construction drawings, according to GB50411 - 2007 "building energy conservation project construction quality acceptance specification", the provisions of the fourth section supervision
Q: Every home needs lighting bulbs, which are popular on the market now
when the electronic energy-saving lamp works normally, the current is 0.05A;

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords