2014 New Holiday Lights
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 5000 Pieces pc
- Supply Capability:
- 100000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
General Introduction
2014 new holiday lights
Specification
Place of Origin | China (Mainland) |
Material | PC |
Model Number | Holiday lights F50-D |
Color | Red |
Length | 88mm |
Width | 52mm |
Voltage | 12V or 24V AC/DC;130V or 240V AC |
Certificate | CE,FC,ROHS |
Waterproof | IP65 |
Delivery | 30 days after deposit |
Our Services
1.Your inquiry related to our products or price will be replied within 24 hours.
2.All your inquireies will be well explained by our experienced staff.
3.OEM&ODM,also provide customized service
4.Distributorship is available for your unique design and some our current models.
5.We will keep secret for customer sale area,design ideas and all other private information
Customized options
Customized label/ Logo can be made onto packing box.
Packaging & Delivery
Package:
1 x Box
Standard exporting box or color box as your require
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
By sea | 30-40 business days |
1. 3-10 business days for Sample Orders; 7-40 business days for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address.
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.
- Q: CREE semiconductor lighting pay no
- In case of holidays or rest days, you should pay in advance on the most recent working days. Wages shall be paid at least once a month, and wages paid by week, day and hour shall be paid by week, day and hour.
- Q: Aomori Festival
- Time is not a holiday, the city of Aomori is August 2nd to 7, Hirosaki city is August 1st to 7, five in August 4th to 8 is set up. People use traditional Japanese paper to make huge square paper seat lights and parade them up and down the streets with their lighting.
- Q: How to choose lamps and lanterns? Inventory factors affecting consumer spending
- When are consumers accustomed to buying lights at nodes? Consumers know brand information through those channels? How to choose lamps and lanterns
- Q: Festival lights are connected by a number of light bulbs connected to the lighting circuit
- When the lighting voltage is 220V, 10 "12V" and "10W" series connected to the lighting circuit, the voltage of each bulb is 22V, over the rated voltage of the bulb, the bulb will be burned out. Therefore, A error
- Q: Zhengzhou Chuangxing for Lighting Design Co. Ltd?
- Our first-class occupation lighting designer team, we carefully read every city, every building and every place, understand
- Q: The sign and meaning of energy saving lamp
- the two signs all indicate that products meet the requirements of national standards for energy conservation evaluation.
- Q: Notes on installation of lighting for 105W high power energy-saving lamp factory building
- , after all, the market is mixed with many products, uneven quality.
- Q: The festival lights are strung together by a number of small light bulbs connected to the lighting circuit
- he voltage of each bulb was 22V, exceeding the rated voltage of the bulb, the bulb will be burned out. The A error.
- Q: What are the main points of power distribution and lighting energy-saving supervision?
- According to the construction drawings, according to GB50411 - 2007 "building energy conservation project construction quality acceptance specification", the provisions of the fourth section supervision
- Q: Every home needs lighting bulbs, which are popular on the market now
- when the electronic energy-saving lamp works normally, the current is 0.05A;
Send your message to us
2014 New Holiday Lights
- Loading Port:
- Shenzhen
- Payment Terms:
- L/C,T/T
- Min Order Qty:
- 5000 Pieces pc
- Supply Capability:
- 100000 Pieces pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords