• Unconventional Rhombic Form Traveller with High Quality System 1
  • Unconventional Rhombic Form Traveller with High Quality System 2
Unconventional Rhombic Form Traveller with High Quality

Unconventional Rhombic Form Traveller with High Quality

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

UNCONVENTIONAL RHOMBIC FORM TRAVELLER

The front tranverse beam gravity height of unconventional rhombic
form traveller is betwwen the height of rhombic form traveler and
triangular form traveler. Comparing with rhombic form traveler and
triangular form traveler, it has the advantages of low gravity height,
more operational space than triangular form traveler, easy operation,
safety during walking and firm anchorage, etc..

● Low gravity of front trancerse beam

● Applicable to large-scale stay-cable cantilever casting bridge with wide bridge deck

● Safe & easy operation, easy fixing, and safty during walking

● Big operational space under the main frame, and easy installation and removal

Q:Hanging basket assembly quality control point
The composition of the basketHanging basket bearing system, bottom formwork system, side formwork system (inside and outside), walking system, rear anchorage system. A hanging basket is made up of two triangles, each of which bears the weight of the beam. Taking into account the processing capacity of the construction site, the main beam, the sliding beam, the upper beam and so did not use a reasonable truss structure, and the use of steel structure.
Q:Hanging basket construction can bind steel
At the intersection of steel, the application of 0.7~2.0 mm wire, according to figure 8 staggered or cruciform manner by butting, butting
Q:The post tensioned prestressed anchorage of suspension bridge can be reused?
Obviously not, after a method is used to anchor the pre-stressed anchorage prestressed reinforcement
Q:Master, according to the whole process of analysis of the accounting process...... Did not do it, the specific process of each labor subcontracting costs are uncertain, give a train of thoughtThe key is the process unit price analysis process, not the comprehensive subcontracting guidance price. To help with micro letter envelopes......
Or do you need to calculate the price of labor subcontracting, I do not engage in the contract, I just say to do this industry to understand these things.
Q:I have a passion for travel, but being a single woman always have problem of companion. Would like to meet other female friends who face same problem. can we come together and form a group? so that we can arrange weekend trips and big holidays also.
I also find myself in same situation ..Please share your contact details
Q:Production and installation of hanging basket
8..5. fixation. In the process of pouring, the anchor plate is easy to loose 1 shift. Therefore, the screws must be fixed on the head template o8.6. positioning. The positioning of the corrugated pipe should be based on the bottom of the corrugated pipe, according to the curve coordinates of the prestressing tendon in the design.8.7. welding. In the process of pouring the bellows lands will be produced in the floating phenomenon, therefore, the bellows in place, can be tied to a "n" type in steel pipe, welded steel bracket and firmly, spacing is generally 60 cm, bracket welding in the stirrups, stirrup below advance real pad o
Q:Operating rules for hanging baskets
The hanging basket construction technology of formwork installation requirements is very high, must be strong, to prevent overturning, concrete pouring down. In addition, the control of formwork elevation is directly related to the precision of pouring concrete and the height of the box girder. Therefore, the elevation of formwork must be determined according to the pre camber of the design and the deflection of the basket.Technical specification for operation of formwork must pay attention to the following points: A1 first before using the rod on the beam bottom die height; B1 theodolite fixed bottom die axis; C1 fixed bottom die, covered with plastic plates, and adjust the width of the middle floor steel frame production to adjust the width of the bottom mold; the elevation of D, adjusting the lateral mode and the edge template and inclination; the elevation of E1 using the template template before adjusting rod.
Q:I am going to the US by car and i know we need to fill a form. But im not sure if we get the form at the boarder or what....
They will have the forms at the border crossing.
Q:The effect of hanging basket
Hanging basket construction technology, although it is the first time, but was successful
Q:What are the characteristics of the "hanging basket" bridge? What are the advantages and characteristics of such a bridge?
The bridge structure stress is divided into: the suspension system (such as cable-stayed bridge and suspension bridge); arch system (such as: deck arch bridge, arch bridge, arch bridge); beam system (such as: simply supported girder bridges, continuous girder bridges, continuous rigid frame bridge)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords