• TC5610 Construction Equipment Building Machinery Accessary Sales System 1
  • TC5610 Construction Equipment Building Machinery Accessary Sales System 2
  • TC5610 Construction Equipment Building Machinery Accessary Sales System 3
TC5610 Construction Equipment Building Machinery Accessary Sales

TC5610 Construction Equipment Building Machinery Accessary Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Tower Crane TC6016 Details:

Minimum Order Quantity:     1unit                                            Unit:     unit                            Loading Port:     China main Port

Supply  Capability:         5unit/month                                                                Payment    Terms:      T/T   or  L/C


Tower Crane TC6016 Description:

1.CMAX Tower Crane TC6016  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6016 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6016 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6016  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6016  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6016  Parameter:

 Max. working range 60m, tip lifting weight 1.6T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 1.6


Tower Crane TC6016   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC6016 Diagram:

TC5610 Construction Equipment Building Machinery Accessary Sales

TC5610 Construction Equipment Building Machinery Accessary Sales

Tower Crane TC6016 Technical Sheet:

TC5610 Construction Equipment Building Machinery Accessary Sales

Tower Crane TC6016 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6016 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “16” means the tip load is :1.6 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.






 



Q:What functions should be achieved in mechanical structure design?
Mechanical structure design plays an important role in mechanical design. This chapter mainly discusses the characteristics, steps and mode of thinking of mechanical structure design. The working principle and design requirements of the machine assembly is a major factor in determining the structure and shape of the parts, followed by the selection of materials, manufacturing process requirements, which has the advantages of good manufacturability (processing and assembly). In addition, the perfection of the structure and shape of the parts has a great influence on the strength and stiffness.
Q:Definition of large mechanical equipment?
Depending on the size of the part to be machined, the parts must be set up as large equipment with the aid of a crane, and large machinery is usually assembled after the parts have been delivered to the destination. Material handling machinery is mainly in enterprises (including terminals, materials, mines and commercial warehouses, etc.) within the material handling, transportation, lifting, stacking and storage of machinery and equipment
Q:What are the sectors of machine building and parts processing?
Industry to classify, it is not very strict. For example, the insurance industry, mining, energy, food, hotels, real estate services industry, garment industry, advertising industry, aerospace, aviation, chemical, chemical, construction, health care, education, training, computer, metal smelting, fire, police, soldiers, accounting, beauty, body, media, publishing, wood, paper retail, wholesale, agriculture, tourism, justice, lawyers, sports, sports, arts, entertainment, medical, art, design, banking, finance, Internet, music, dance, postal, courier, transport, consulting services.
Q:Where does Heilongjiang do the most construction machinery?
Construction machinery is an important component of equipment industry. To sum up, all mechanical equipment necessary for comprehensive mechanical construction projects, such as earthwork construction, pavement construction and maintenance, mobile lifting, loading and unloading operation, and various construction projects, are called construction machinery
Q:What are the construction materials, components, fittings and equipment in construction?
3. Equipment: a complete device which belongs to the unique function of each function of the construction project. There are systems, equipment and conventional equipment, such as: elevator, automatic fare collection, HVAC, gas fire protection, etc..
Q:How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
With what groove related, open groove is not the same, marking is not the same, "welding structure" reference to our specialized courses
Q:What are the mixing arms of the concrete mixer?
Mixing arm concrete mixer is a component of the mixing arm itself and divided into lateral mixing arm (positive and negative points), stirring arm (also have positive and negative points), stirring arm below is the bearing seat connected, connected with 4 sets of high strength bolts with stirring arm. The top is equipped with wear-resistant mixing blades, connecting with mixing blades, high-strength bolts 2 sets. In addition, some manufacturers have designed mixing side bonded shaft swivel, is installed in the interval between the stirring arm fixed and rotated in two ways.
Q:Where was the construction machinery conference held in 2015?
2015 Bada international construction machinery exhibition, exhibition information time: June 5, 2015 (Friday) - 7 day (Sunday) location: Shandong Bada international engineering machinery City Theme: cooperation, win-win, innovation, development, guidance: National Quality Supervision and inspection center of engineering machinery, Shandong Machinery Industry Association, Shandong province transportation and Logistics Association Shandong, Shandong Jiaotong University, Shandong Institute of road, economic development zone of Qihe Province
Q:What are the principles, performances and uses of the commonly used construction machinery equipment?
2.: Principle: loader loader work, powered by a flywheel of the diesel engine to the hydraulic torque converter, the torque converter will drive to the gearbox, and before and after the output flange of the gearbox, the power output of the gearbox after the transmission shaft are respectively transmitted to the front and back drive axle to drive the wheels forward. Performance: 1) Central articulated frame, turning radius is small, flexible and convenient operation in narrow space; 2) using hydraulic mechanical transmission, according to the size of the external resistance and automatic stepless speed change, which can make full use of engine power, and improve the maneuverability, simplifies the loader operation. Is to protect the transmission parts and engine; 3) adopts full hydraulic steering, power shift transmission, hydraulic or flexible manipulation, portable and flexible machine; 4) stable and reliable operation; wide use of low-pressure off-road tires, rear axle swing, with good cross-country performance and through the performance by 5); gas cap oil disc brake system and brake foot up, emergency braking system, the braking performance is safe and reliable; 6) with advanced structure and bright cab. The air conditioning system operates more comfortably. Uses: loaders are mainly used for shovel, loading, unloading, transport of soil and stone a kind of bulk materials, rock and hard soil can also be slightly shovel operations.
Q:Construction machinery production need to deal with what documents?
The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords