RL-scaffolding
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description:
1. Brief introduction
A convenient scaffolding system, especially for load-bearing support, its structure is simple and reasonable, its operation is easy and flexible, and the system is widely used in industrial buildings and civil buildings.
2. Competitive advantage
①. Product standardization, produce cost is lowered.
As the picture left shown, the standard is auto-welded; all the distance between cross plates of standards with different length is 500mm, which makes the auto-welded working method be easily achieved.
②. Spatial tower assembly guarantees high load-bearing capacity.
The main body of RL-scaffolding system is consisted of standard, ledger, diagonal ledger, and diagonal brace. The system forms a whole spatial frame structure that guarantees its high load-bearing capacity.
③.Smart joint design guarantees safe application and easy operation.
As the picture below shown, the “connect head” stuck in the position of cross plate with correct hole, then fix the pins tightly with a hammer, after that, you finish the whole connection work. The joint is safe and firmly.
3. Applications
- Q:Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
- Foundation and underground space engineering technology 11.1 Post-grouting post grouting technology ........... 11.2 long auger drilling pressure pile technology 21.3 Cement fly ash Gravel Pile (CFG Pile) Composite Foundation Technology 21.4 Vacuum Preloading Reinforcement of Soft Soil Foundation Technology 31.5 geosynthetics application technology ............
- Q:What kind of scaffolding is the building divided into? Where to use it as
- Interior decoration high construction area, you can use a fixed scaffolding, outside the rent, you can request to install; high construction period is short or small size, you can use the activities of scaffolding. Activities or fixed can be combined, Can be a few units together, depending on the specific area and requirements of the decoration. Construction of the lower height, but also their own use of bamboo or wood to produce temporary scaffolding or bench. Oh, thank you
- Q:Wanzhou District housing notarized brick structure is how much money per square meter
- Is the set of quotas, there will be poor material adjustment. Now this process is generally not set quota. Both sides follow the market to discuss the price
- Q:Why is all the civil safety information, there is no special decoration safety information? More
- Test thermal conductivity is generally chosen to test the heat flow meter
- Q:Discussion on the Selection of Tower Crane in High - rise Building
- project overview (project location, building height, ) the scaffolding erection form (floor type, steel cantilever) and erection parameters (erection height, vertical pole distance, distance, step, even the wall spacing, steel spacing, steel length, etc) construction and deployment (quality Safety management system; materials, equipment and labor organization; construction schedule, etc) scaffolding construction requirements and technical measures scaffolding construction and quality and safety management contingency plans scaffolding calculation book related accessories and charts Flat layout map, scissors supporting the elevation map, even the wall pieces of Fu Fung Phoenix Yu Hao Feng pupil tripod map, pole base node map, etc)
- Q:How far should the tower crane be from the outer wall?
- 1: it is best not to use this, this program in the construction, curing, use, life will bring a lot of problems. 2: hanging net and plaster is formalism, is not considered the consequences. 3: If you want to use tiles to decorate the wall, especially the sandwich panels, the size of the use of small. I have seen a tile wholesale owner home decoration, the 800X800 cut into 800X200 with, it seems good results.
- Q:What are the relevant laws and regulations for the filing of the attached scaffolding project above 150 meters? What is the specific name of the article? The More
- What are the relevant laws and regulations for the filing of the attached scaffolding project above 150 meters? What is the specific name of the article? The More
- Q:Will the door scaffolding norms who knows ah? Can you teach me?
- ; by erection of the pole row, but also a single row of shelves, double row frame and full house According to the erection of the use, but also can be divided into masonry frame households light Ju Chi angle Gui carrying wool, decoration rack; by erection of the location can be divided into external scaffolding and scaffolding The following small series on a brief introduction to several commonly used steel frame structures and scaffolding structures A scaffolding on the outside of a building or structure is called an outer scaffolding Outside the scaffolding should be put up from the ground, so, also known as floor scaffolding, in general, how high the building, the shelf will take how high Scaffolding can be divided into single row scaffolding and double scaffolding A scaffolding in a building or structure is called a scaffolding The main types of scaffolding are: horse stool-style scaffolding and pillar-style foot scaffolding Tool scaffolding has cantilevered scaffolding, basket scaffolding and hanging lift scaffolding, scaffolding and door steel scaffolding
- Q:What are the main points in the inspection of building safety data?
- Better with styrofoam, that is, can be insulated and heat.
- Q:How is the tower crane on the site raised?
- 1. Difference is not the mainstream of the heat dissipation heat sink + cooling fan, just based on the vacuum heat plate cooling technology VaporChamber. 2. From the heat side is still based on the vacuum plate is better. But based on vacuum hot plate cooling technology VaporChamber if the design is not good, but play a counter-effect. 3. If the price gap is not large, buy 5770 based on VaporChamber. The performance of the heat should be better.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
RL-scaffolding
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords