Pre-Painted Galvanized Steel Coil in Prime Quality Green Color
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Pre-Painted Galvanized/Aluzinc Steel Coil Description:
With GI as base material, after pretreatment (degrease and chemical treatment ) and liquid dope with several layers of color, then after firing and cooling, finally the plate steel is called pre-painted galvanized (aluzinc) steel. Pre-painted galvanized steel is good capable of decoration, molding, corrosion resistance. It generally displays superior workability, durability and weather resistance.
2.Main Features of the Pre-Painted Galvanized/Aluzinc Steel Coil:
• Excellent process capability
• Smooth and flat surface
• Workability, durability
• Excellent heat resistance performance
• High strength
• Good formability
• Good visual effect
3.Pre-Painted Galvanized/Aluzinc Steel Coil Images:
4.Pre-Painted Galvanized/Aluzinc Steel Coil Specification
Standard: AISI, ASTM, BS, DIN, GB, JIS
Grade: DX51D, DX52D
Thickness: 0.17-2.0mm
Brand Name: KMRLON
Model Number: coil
Type: Steel Coil
Technique: Cold Rolled
Surface Treatment: Coated
Application: Boiler Plate
Special Use: High-strength Steel Plate
Width: 20-1250mm
Length: customized
commoidty: pre-painted galvanized steel coil
Thickness: 0.13-4.0mm
width: 20-1250mm
zinc coating: 40-180g/m2
printing thickness: top side: 20+/-5 microns, back side: 5-7 microns
color: all RAL color
surface treatment: color coated
coil weight: 4-7 tons
coil ID: 508/610mm
packaging: standard seaworthy packing
5.FAQ of Pre-Painted Galvanized/Aluzinc Steel Coil
1. What’s the application of this product?
Roof, roof structure, surface sheet of balcony, frame of window, etc.
2. What’s the brand of the paint?
We use the best brand of all of the word—AKZO.
3. How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
4. How long can we receive the product after purchase?
Usually within thirty working days after receiving buyer’s advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.
- Q:What are the contents of the installation of the elevator floor door components?
- Elevator floor installation components Contents: 1 with a vertical wall of the installation of the plane 2 to adjust the plane of the wall connector, 3 fastening the connection to set the slot with the adjustment of the surface with the adjustment plane in conjunction with the door joints Interconnection. 4 is provided on the wall mounting plane and the adjustment plane of the wall connection. The connection slot for the provision of the fastening connection and the longitudinal direction is perpendicular to each other. And the length of the connecting slot on the adjustment plane connected to each other is also perpendicular to each other, and the length of one of the slots is perpendicular to the wall mounting plane The
- Q:Which parts of the elevator change is the transformation of it
- The elevator transformation project includes: the main parts of the model, specifications change, such as: speed limiter, safety gear, buffer, door locks, rope combination, rail, traction machine, control cabinet, fire floor, glass doors and glass Wall, upstream overspeed protection device, safety circuit with electronic components, hydraulic pump station, speed limit shut-off valve, electric check valve, manual drop valve, mechanical anti-settling (anti-climb) device, step or pedal, cascade chain, , Wheel (main wheel, secondary wheel), metal structure, handrail, escalator or automatic walkway control screen. The main parameters and other content changes, such as: rated speed, rated load, drive mode, speed control mode, control mode, lifting height, running length (on the sidewalk), tilt angle, nominal width, explosion-proof level, explosion-proof media, The
- Q:The elevator has a certain useful life
- This really is not, only reference scrapped, not forced to scrapped!
- Q:What is the most valuable part of the elevator?
- Of course it is traction machine
- Q:Elevator hoist inside the iron frame how to build, that is how to put the parts to the top of the
- Do you know that there is a hook on the top? Bearing capacity is generally 2 tons. At first start the bottom of the car. Then people stand on top. Pull up the hook. People to pay ridge barnyard jealousy Huan half of the newspaper only began to install rails. Ring beam and so on. The
- Q:What is the name of the elevator?
- Elevator wire rope rope combination, the lower end (tapered hole) need Babbitian pouring. This rope combination is generally used for straight pull traction.
- Q:The elevator warranty period is in accordance with the Ministry of Construction in 1995 issued the project (1995) No. 167 "on the strengthening of the elevator management of the Interim Provisions Implementation Rules" provides: the newly installed elevator quality warranty period from the date of acceptance of one year, Or goods to the site for 18 months basis? Or on the basis of the 25th executive meeting of the State Council on January 10, 2000 (Decree No. 279 of the State Council of the People's Republic of China on January 30, 2000) "Regulations on the Quality Management of the Project" In the provisions of the electrical pipeline, water supply and drainage pipes, equipment installation and renovation works the minimum warranty period of 2 years? More
- Follow one of the previous
- Q:What are the elevator parts?
- (Control circuit, control circuit, signal circuit, safety circuit, drive module, contactor relay, power supply, power supply, power supply, power supply, power supply, Heat sink, etc.) sockets, distribution box, intercom car: car, guardrail, car top, car wall, bottom row, bottom beam, weighing (also may be installed in the rope), control panel, display, maintenance Device, signal device, car door, switch door device, emergency light, lighting, alarm device, safety window (option), safety gear, mechanical lock (option), intercom Well: rail, signal device, with cable, (Optional), lighting pit: buffer and the base, up tight wheel, emergency stop, socket, intercom temporarily think of so much
- Q:The elevator does not need to be sealed
- An old cell phone, logo can not see
- Q:The home has been renovated, the toilet and hose links do not install the filter, fall, resulting in running water, water into the elevator, causing damage to the elevator parts, responsible for the loss of fear of consumption with the treasure who will bear. Because the elevator is always bad before, always wrong, how to set loss, how can determine the bad is caused by the run of the water? More
- I'm not here! I do not know! You have to say that sanitary ware I do not do the other I do not know you go to you to install the bathroom to see if he seems to be responsible
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Pre-Painted Galvanized Steel Coil in Prime Quality Green Color
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m²
- Supply Capability:
- 10000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords