HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 006
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q:What is the difference between land valuation and real estate valuation?
- based on the land market transaction data, according to the land's economic and natural attributes, according to the quality of real estate, grade and its real economic activities in the general income Situation
- Q:Determine what long-term factors in our housing market?
- First, the population factor. That is, with the increase in population, the demand for housing will increase
- Q:What is the real estate level market secondary market three market
- The real estate first-level market, also known as the land first-level market, is the land use right to sell the market
- Q:What is the trend of real estate now?
- First, real estate is China's pillar industries, the Government does not allow house prices collapse.
- Q:What kind of factors in our housing market?
- they will release a huge purchasing power and demand, thereby stimulating the development of China's real estate
- Q:What is the difference between a real estate model and a real estate sand table?
- The model is usually a single, single, or an independent type. From the external decoration to the internal use of functions
- Q:Real estate in the "five card" which five?
- Construction land planning permit" is the construction unit in the land management department to apply for the acquisition,
- Q:What is the main property sales?
- new homes and old houses, commercial housing, fund - raising room to do, the scope to be bigger, a region of all houses have the opportunity to do
- Q:What are the categories of real estate?
- 1, residential land, public facilities land (including commercial land), industrial land, storage land, foreign transport land, road plaza land, municipal utility land, green land, special land.
- Q:What is the real estate development prospects now?
- Although the short term, the real estate market because the price is too high lead to lack of effective demand
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 006
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches