3 Phase Out UPS 15KVA with Double Convertion Online
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 10000 Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Phase: Three Phase
Protection: Overcurrent
Weight: 78
Output Voltage: 380
Type: On-line
Application: Networking
Packaging & Delivery
Packaging Details: | wooden case for export package |
Delivery Detail: | 20 days |
Specificatons
1. Three phase in and out system, compatible with utility of 380/400/415V, 50/60Hz
2.Online double conversion,
Capacity | 6KVA | 12KVA | 18KVA |
Main Input | |||
Input voltage | 200V/208V (line to line), 50/60Hz | ||
Input connection | 3Ph+N+PE | ||
Power factor | >0.99 | ||
Input voltage window | +20%~-20%, full load | ||
-20%~-40%, power derating between 100% to 70% | |||
Frequency window | 40-70HZ | ||
Bypass input | |||
Bypass voltage | 200V/208V | ||
Bypass voltage window | +15%--20%, full load | ||
Frequency window | ±5Hz | ||
Battery | |||
Battery voltage | ±120VDC | ||
Charger power | 20%*Power | ||
Charger voltage precision | 1% | ||
Output | |||
Voltage precision | ±1% (balance load),2% (unbalance load) | ||
Output voltage transient | 5%(0~100% load step) | ||
Voltage THD(Total Harmonic Distortion) | THD<2%(linear load),THD<5%(nonlinear load) | ||
Power factor | 0.8 | ||
Frequency tracking range | 50/60Hz±3Hz, adjustable | ||
Frequency precision (free running) | ±0.02% | ||
Phase tolerance | 120°±0.5° (balance and unalance load) | ||
Voltage unbalance degree (100% unbalance load) | ±2% | ||
Frequency tracking speed | 0.5Hz/s to 5Hz/s, adjustable | ||
Crest factor | 3:1 | ||
Overload capabiltiy | 102% long time operation | ||
110%, transfer to bypass after 1hour | |||
125%, transfer to bypass after 10 minutes | |||
150%, transfer to bypass after 1 minute | |||
>150%, transfer to bypass after 200ms | |||
Bypass overload capability | 125%, long time operation | ||
125%< load<130%, last for more than 1 hour | |||
130%<load<150%,last for more than 6 minutes | |||
>1000%, last for more than 100ms |
- Q:Users buy a UPS power supply, the main purpose is what? High frequency, power frequency, interactive These are the direction of customer choice?
- UPS Chinese means "uninterruptible power supply", it can protect the computer system after the power failure to continue working for some time so that users can save an emergency, to avoid data loss. Personal computers generally do not need to configure, usually the company's server need to configure the UPS to prepare for power after the power can continue for some time to provide time to switch generator power generation. Interactive UPS is an intelligent UPS, can automatically detect whether the external input voltage is within the normal range, if the deviation can be boosted by the regulator circuit or buck, to provide a more stable sine wave output voltage. And it can communicate with the computer through the data interface (such as RS-232 serial port), through the monitoring software, the user can directly monitor the power from the computer screen and UPS status, simplify and facilitate the management work, and improve the computer system reliability. High-frequency UPS: the use of high-frequency switching technology to high-frequency switching components to replace the rectifier and inverter in the frequency transformer UPS, commonly known as high frequency machine, high frequency machine small size, high efficiency. Power frequency UPS: the use of frequency transformers as rectifier and inverter components of the UPS commonly known as frequency machine, the main feature is the main power components stable and reliable, overload capacity and impact resistance
- Q:30K of the UPS, need to delay half an hour, about how many batteries (how many security) is best to write how to calculate, in addition, I need to know what is the meaning of 32 output! There are two parallel hot backup means two UPS work together? Or a work ~, another machine to do it? I am not doing this line, but now there is a need to know this project, thank you, high score reward! Put away Added: UPS requires 32 output, what does it mean! Note: UPS is 30K
- 32 output means that the UPS output circuit to 32. Is that you have to be a switchboard, which should be installed 32-way air switch, respectively, control 32-way equipment.
- Q:What construction tools are required for UPS power supply installation
- You have to prepare, a screwdriver word, 5-color tape, omnipotent table, pliers pliers, crimping pliers, wrench openings are not open, hot fan saws, you can install. brothers!
- Q:What is the difference between UPS and on-line?
- Online does not need to convert time, and the same battery, even if the electricity is off all right. Back-up, online interactive are about to be eliminated.
- Q:Internet cafes with the server, the following configuration: CPU: E8200 Motherboard: Gigabyte G41M-S2H Graphics: motherboard integration Memory: Weigang Red Dragon 2 * 2G 800 Hard disk: West 1.5T Power: Hangjia wide king 350W Display: HPC 17 inch CTR The previous purchase of a mountain 300W UPS uninterruptible power supply but in the blackout when the server with a fixed host and CRT monitor, asked the seller, the answer is UPS power concerns small, to change the big, but I will not calculate concerns, Ask you: how much do I need to buy a UPS?
- Host security 500W operator, and then count the power factor, the best load percentage, you can be equipped with a 1500VA or so UPS.
- Q:Do not understand the ups on the 3 into the 3 out of this parameter in the end what advantage!
- On the UPS into a few points out of his input and output, probably divided into three kinds of three into three, single into a single, three into a single, and now there is a single into three, here Three and single live is to refer to the phase, the three refers to the three-phase, single refers to the single phase (three-phase is that we often say 380V of electricity, single-phase is our home and office commonly used 220V) ; As you said 3 into the 3 out of the popular say that the input is used 380V power supply, the output is 380V power to the equipment to be connected, 3 into the single is the UPS input is 380V, the output is 220V.
- Q:First, determine the power section first Second, to confirm the UPS power section, we can choose the UPS work. Currently on the market more common way of work back-up, online interactive, online double conversion (line pure online) these three
- Second, according to equipment power, delay requirements. Make a configuration. The longer the latency, the more battery pack capacity or number.
- Q:How to use and maintain ups power?
- UPS power supply is continuous power supply, so his battery maintenance is very important, the frequency of battery charge and discharge can not be too high, so the requirements of the engine room electricity environment must be better, and if there is little power failure in the engine room, 4 months of artificial put a power. So the battery with a 5-6 years is not a problem.
- Q:UPS power supply alarm, may be normal power supply, how should deal with?
- There are two cases of UPS alarm. One is UPS failure conditions: For example, 1, when the power failure or input power is not connected, then UPS battery power supply, the general UPS alarm is 2-3 seconds. 2, if the battery life is over, the battery power loss, the alarm sound from the indirect sound into a drop of continuous alarm, this time the battery lights will flash, the battery capacity lamp is generally only a grid show, then you should replace the new battery The. 3, UPS overload operation will alarm (overload, the general overload of the UPS in the specified time will be their own downtime protection), this time is not the UPS itself failure, as long as the overload of equipment to stop a few, UPS alarm will disappear. There is also a situation is the UPS internal failure, this situation is more common, many reasons, here is not tired, then the fault light will be bright, the alarm is generally 1 second or long. Then you can find a dealer or manufacturer for maintenance, troubleshooting, the alarm will be eliminated.
- Q:Uninterruptible power supply can be used as lighting power
- can. But pay attention to the load with ups' capacity ratio of not more than 80%
1. Manufacturer Overview |
|
---|---|
Location | Beijing,China (Mainland) |
Year Established | 2005 |
Annual Output Value | Above US$100 Million |
Main Markets | 50.00% Southeast Asia 20.00% Central America 20.00% Mid East 10.00% Africa |
Company Certifications | ISO 9001:2000;ISO 14001:2004;SA8000;OHSAS 18001 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Shanghai,Beijing,Shenzhen |
Export Percentage | 51% - 60% |
No.of Employees in Trade Department | |
Language Spoken: | English, Chinese, Spanish, German, Russian, Italian |
b)Factory Information | |
Factory Size: | 1,000-3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range |
Send your message to us
3 Phase Out UPS 15KVA with Double Convertion Online
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Set set
- Supply Capability:
- 10000 Sets per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords