• Tower Crane CMAX TC5613 Construction Machiney System 1
  • Tower Crane CMAX TC5613 Construction Machiney System 2
  • Tower Crane CMAX TC5613 Construction Machiney System 3
Tower Crane CMAX TC5613 Construction Machiney

Tower Crane CMAX TC5613 Construction Machiney

Ref Price:
$83,800.00 / set get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Introduction:
Tower Crane is a machinery used for vertical lifting and horizontal delivering of building materials and any other heavy items during construction process. It can lift and lay down, horizontally shift, and rotate, so the working range is very large. The whole body can be fixed or movable.


Features:
1. Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,
2. This Tower Crane equipped with hydraulic lifting and connecting. This Tower Crane' s height can accordign to the actual height of the building and at the same time unchange the lifting capacity.
3. LVF:Frequency control, variable speed, smoothness and high stability, non-striking.
4. Moment motor, high stability, long working life.
5. SM:Three-speed change pole motor, simple in structure, economical ,fitting.

6. has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.


Specifications:

Tower Crane CMAX TC5613 Construction Machiney

Tower Crane CMAX TC5613 Construction Machiney


Q:I'm just curious about it, and i need it for a fan fiction story i'm writing. thanks ^__^
im not from Japan although my niece studied there so i assume yes in kindergarten school level there's a activity that well teach you how to make Origami or folding a paper crane and stuff like that however not every child in japan knows it about 80% how know and 20% don't for street children,and those who are hate Origamis ;D
Q:How do they erect those giant cranes used for constructing tall buildings?
They build themselves actually.... well the first part is assembled by a small crane but after that hydraulic lifts lift up the top section of the crane while the crane lifts up another mid section and places it underneath itself. cool huh?
Q:HOw to classify tower crane?
From okorder / are divided into upper rotary tower crane and lower tower crane two broad categories.In which the carrying capacity of the former is high than the latter, in many Construction sites the tower cranes we have seen are On a rotary festival add up on the top of a high tower crane access. According to whether the move can move,tower crane are divided into: walking a line, and fixed ones. The fixed tower crane do not switch, installed in the block of concrete baseBasis, or installed in the form of X-shaped concrete foundation. In the housing construction generally use a fixed style.
Q:I have to create a crane to support a dead load for my Engineering Technology class. It can be made out of only 1/8 inch balsa wood and wood glue, and is going to be graded by the ration of weight held to structure weight.Could anybody give me some suggestions as to how to go about designing this thing? I already know most of the basics, but if anybody could give me some specific tips, they would be greatly appreciated.Thanks!
Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.
Q:I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:How much does it cost to build 18, 22, 35, 40, 50, 70, 100, and 120 ton cranes?
You would have to contact the crane manufacturer. Each size would have different cranes that meet that requirement, eg portable versus not portable. That's assuming those are total crane weight numbers? Or are they lifting capacities?
Q:What are the requirements for the use of an anti-two block device on a lattice boom crane used as a drill?
what the hell are you talking about
Q:What should be included in the disassembly plan of the tower crane?
- 1 -Contents and requirements of special construction plan for tower crane installation1. General situation of Engineering; 2, installation location and elevation plane3. The type, performance and technical parameters of the tower crane selected4,; foundation and attachment device set(1)The foundation of tower crane and the bearing capacity of its foundation shall comply with the product specificationRequirements for books and design drawings. Before installation, the foundation shall be checked and accepted before installation. There should be drainage facilities around the foundation.(2)Attached tower crane is used, the attachment device and set freeThe end height shall comply with the requirements of the product manual. When adhering to a horizontal distance or attachmentThe design calculation and drawing system should be carried out when the spacing is not satisfied with the requirements of the product specificationDrawing and writing relevant instructions shall be examined and approved by the technical leaders of the enterprise or through the originalManufacturer confirmation. Attachment device and component shall be the original manufacturer or by embedded partsEnterprise with corresponding ability to make. Attachment device design, the main structure of the building to support the checking.5, climbing conditions and adhesion node detail;The foundation, anchor and climbing support structure of an internal climbing tower crane shall be used as the foundationAccording to the product manual to provide the design calculation, and the internal climbing tower crane bearing structure checking.6, the main components of the weight lifting and installation position.7, the installation of auxiliary equipment; the type, performance and arrangement position.8. Rigging and special tools9, set the power supply;10, the construction personnel configuration;
Q:For my science fair project we have to build someething using simple machines, me and my partner decided to do the crane, but we havent been able to find any place that shows intructions on how to build it. If you can please included a step by step plan, the things you will need ( whether or not they are hard to find/ and if so where i might be able to find them ), and your sourcetruely i appreciate this sooo much thankyou in advance everything counts so please make it as detailed as possible and if you know any other sites that show please include thank you sooo much :)
you are totally just trying to avoid doing this work by yourself. anybody with two eyes can just look up crane on google and learn how it works. they are super simple just go to the library or something. or better yet go look at a real crane.
Q:my overhead crane refuse to work transvesely
Limit switch replacement requires adjustment of the cranes travel limits. The limits are imposed by the manufacturer for the application. This service is normally factory authorized only.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords