Aluminum Insulation Flexible Duct For Air Ventilation Syetem
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 20000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications
Insulated aluminum flexible duct
extension rate:1:10
Low /medium pressure central HVAC system flame and heat resistant
Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting
Material:
Double layers of aluminum foil reinforced with high tensile spring steel wire
Structure: High elastic wire, aluminum foil. A reinforcement model can be required.
Aluminum foil thickness: 0.035mm
Temperature range: -30°C~+140°C
Maxim Air Flow: 30m/s
Maxim working pressure: 2500 pa
Standard Length: 10m/pc Or as your requirement
Fire resistance: Non flammable.
Normal packing: In carton. Or as your requirment
Application: Low /medium pressure central HVAC system and ventilation system.
Application: Used in gigh pressure,low pressure air conditioner and ventilation system,easy installation, anti-temperature and inflaming retarding etc
Description | 100% Non-asbestos |
Raw Materials | Cement,Quartz Sand,Paper Pulp,etc. |
Standard Size | 1220mm×2440mm or 1200mm×2400mm |
Max Width | 1220mm |
Max Length | 3000mm |
Thickness | 4-20mm |
Density | 1.30-1.50g/cm3 |
Color | Light yellow or Grey |
FAQ
Thermal conductivity: 0.034-0.048W/mK
Average Fiber dia.:less than 7
Grade of combustibility:Non combustible Grade A
Hydrophobicity:More than 98.2%
- Q:Drain flexible pipe to keep the base design above the elevation of the number of meters
- , there are cloth-based materials, such as Teflon cloth, etc
- Q:How to strengthen the construction management and construction quality control
- Combined with national energy Policy, and then according to the design of the various properties of insulation materials, calculated through a complex calculation process is not free to set the thickness.
- Q:Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
- According to the "construction safety inspection standards" JGJ59-. the safety assessment of the project this month to meet the eligibility criteria, agreed to the construction unit self-evaluation views, wear raft flat Wo Zhuangguang state platinum card assessed as qualified.
- Q:Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
- In the past, the external wall insulation technology prevails, the external wall insulation is in the experimental stage, Basically no
- Q:Do you have a natural gas hose in the flue?
- Fastening steel pipe scaffold generally by the steel pipe rods, fasteners, base, scaffolding, safety net and other components of steel pipe: generally there are two, an outer diameter of 48mm, wall thickness 3
- Q:What are the scope of construction work special operators?
- This look at their own interest, ah, I was learning mechanical, or from the mechanical drawing began, in the study of tolerance, technology, design, etc., there are many, but also learn a three-dimensional software, like proe
- Q:Maintenance Skills of Leakage of Fire Pipe Clamp Joint
- Aluminum alloy small heat dissipation fast! Not conductive! Hope to help you
- Q:The sound of water pipes will not produce infrasound damage to the human body?
- The general pipe and pipe material to connect manufacturers to supply matching, so that more to ensure quality
- Q:We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
- The cost of the main cantilever is as low as the secondary structure can be moved
- Q:Can the kitchen sewage pipe pass through the walls of the stove wall?
- scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Aluminum Insulation Flexible Duct For Air Ventilation Syetem
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 20000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords