• Tower Scaffolding for Building Construction System 1
  • Tower Scaffolding for Building Construction System 2
Tower Scaffolding for Building Construction

Tower Scaffolding for Building Construction

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Scaffolding

Shoring tower is an effective supporting system. It is easy to assemble and dismantlement, and

has excellent stability and bearing capacity. It has been widely used in the construction of industry

& residential buildings , bridges, tunnels and dam project, etc.


Characteristics:

◆ High degree of standardization.

◆ Easy storage and transportation




Q:Seeking architectural internship diary, at least sixty, can be a different project, a project five or six of the do not made
Seeking "industrial furnace masonry construction and acceptance of norms" GB-2004 electronic version, urgent use! If appropriate to add bonus points more
Q:Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
The actual score of each item in the checklist should be calculated as follows: A1 = B * C / 100 where: A1 - the summary table is the actual score of the sub-item; B- Full score; C-check the score score.
Q:What are the safety protection appliances, machinery and equipment, construction machinery and accessories for construction enterprises?
Construction of special types of work are: electrician, electric welder, shelf workers, tower crane driver, tower crane Division workers, tower crane signal workers, the documents required by the relevant departments for training.
Q:What is a new construction technology, new technical information
Flexible interface allows a certain deformation ~ ~ and rigid interface is connected into the whole ~ ~
Q:Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
Excellent: sub-check the score no 0 points, the summary table score of 80 points and above;
Q:What are the contents of the safety and civilized construction measures?
Glass fiber board for the core of the vacuum insulation board, this board thermal conductivity is generally low in the 0
Q:What are the basic processes of civil engineering need to prepare the construction program
The general needs of the minimum . namely: construction crane equipment (tower crane), construction crane machinery (material hoist), construction crane machinery (construction lifts), building shelves (ordinary scaffolding), construction Construction workers, construction electrical welding (cutting) workers, high operating basket installation demolition workers and other special operations personnel with or without provincial management issued by the "construction of special operations personnel operating qualification certificate", " And the card is consistent.
Q:What kind of jobs are the construction workers in the labor service network of the China Construction Service Network?
Metal hose with austenitic stainless steel or according to user requirements of the material manufacturing, metal hose has excellent flexibility, corrosion resistance, high temperature resistance (-235 ℃ ~ +450 ℃), high pressure (up to 32MPa) , Metal hose in the pipeline can be connected in any direction for temperature compensation and absorption of vibration, reduce noise, change the direction of media transmission, to eliminate the pipeline or between the pipe and the mechanical displacement between equipment, double flange metal corrugated hose It is particularly suitable for flexible joints with various pumps, valves and so on for displacement and vibration
Q:The latest "current building construction specifications Daquan" electronic version can give me a copy of it My mailbox @ thanks for more
(Insulation, thermal insulation effect is better) of the insulation material and the building wall fixed one (the thermal insulation effect is better), and the thermal insulation material is fixed with the building wall (fixed, mechanical anchoring, paste + mechanical anchoring, spraying, casting, etc.) , Increase the average thermal resistance of the wall, so as to achieve the insulation or insulation effect of a engineering practice. Should include roof insulation!
Q:What is the difference between the inside and outside of the car
First, the basic structure of the wall system: the basic structure of the basic wall system ① adhesive layer ② insulation layer ③ fixed ④ ??protective layer ⑤ decorative layer ⑤ reinforced concrete wall concrete hollow block clay clay porous brick wall clay brick wall Gas concrete wall base wall should be consistent with national standards; Pleasant Hercules adhesive mixture, coated plate thickness of 5mm-7mm, depending on the wall flatness, and the wall paste thickness of 2mm-4mm; Plastic polystyrene insulation board or foam polystyrene insulation board

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches