• Stationary Bitumen Mixer HMAP-ST800 60t System 1
Stationary Bitumen Mixer HMAP-ST800 60t

Stationary Bitumen Mixer HMAP-ST800 60t

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Set set
Supply Capability:
60 Sets per Year set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detailed Product Description of 60t HMAP-ST800 Stationary Bitumen Mixer

 

 1.   Aggregate Supplying & Cold Bin:

        --- Cold bin / Belt Feeder / #1ST Belt Conveyor

  2.   Aggregate Heating Unit:

        --- #2nd Belt Conveyor / Dryer / Burner / Blower / Hot Elevator

  3.   Main Frame:

        --- Screen / Hot bin / Weighing Unit / Mixer / Asphalt Spray Pump

  4.   Dust collecting unit:

        --- Dust Chamber / Exhaust Fan / Bag Filter / Chimney Dust Recycling Screw Conveyor / Air     Compressor & Piping

  5.   Filler Supplying Unit:

        --- Filler Silo / Screw Conveyor / Filler Elevator

  6.   Asphalt Tank:

         --- AP Tank / AP Feeding Pump & Piping / Hot Oil Heater / Hot Oil Circulation Pump & Piping

  7.   Bunker-C/Diesel Tank / Heating Unit:

        --- Bunker-C/Diesel Tank / Bunker-C & Diesel Piping.

  8.   Control System Operation Room:

        --- Control Panel / Printer / C.C TV / Power Panel / Electric Wiring.

Q:Is the concrete mixer and mortar mixer a machine
Principle, working condition and so on but the mortar mixer design than concrete mixer So you can use concrete mixer mixing mortar, but unfavorable use mortar mixer mixing concrete
Q:How to safely use concrete mixer
A concrete mixer is a machine that mixes cement, gravel and water into concrete mixtures. It consists mainly of mixing, loading and unloading mechanism, water supply system, original motive, transmission mechanism, frame and supporting device. Operating procedures Before stirring, the car should be run in an empty car. Adjust the timing of the relay according to the stirring time. Water moistening the mixing bowl and the blade and the ground. The process, such as electrical or mechanical fault, should be discharged from the part of the mixing material, lighten the load, remove the fault and then drive again. When operating, the operation should be checked regularly to prevent safety accidents such as electrocution and mechanical injury. Finish the experiment, turn off the power supply, clean the mixing drum and the ground and clean up the cleaning.
Q:For example, what is the more detailed and better td-50 td-80 td-60
That's right, tipping over, tdcm125-6d Turn out the material JZC350 (rdcm350-6e, rdcm350-8eh, rdcm350-11e), JZC500, JZR750, JZR1000 Forced JS500, JS750
Q:Common type of concrete mixer
The common concrete mixer is divided into two kinds: self-falling concrete mixer and strong concrete mixer.
Q:How long will it take for a concrete mixer to beat ten square?
The first set of 10 square is 120, and the first set of 2 squares is calculated from the above, and the time is saved by 4 minutes in 4 minutes, the average of 15 minutes is calculated by C50 high performance concrete. If it's a C20 no water reducer, just five minutes!
Q:How does a concrete mixer operate
Steps and considerations for concrete mixers: Steps: 1, switch the function switch from the column to "automatic" position, press the start switch on the controller, and the whole operation will operate automatically. After the whole process is finished, it will stop automatically, and in the running project, if it is necessary to stop, press the stop button and then restart. After the start button is pressed, the display begins to show time, slow, sand, fast, stop, fast, and run the light on time. When automatic control, all the switches must be allocated to the stop position.
Q:Concrete mixers need to be aware of which things
Prior to the use of the new machine, the requirements of the manual of the concrete mixer shall be conducted according to the instructions of the concrete mixer, and the test and the necessary trial operation shall be conducted for each system and the parts. Running in the empty car, checking the rotation direction of the mixer or stirring leaves, the operation of each work unit, the brake, the confirmation of normal, the operation. Fixed concrete mixer should be installed on a strong pedestal. When used in the long term, the ground bolts shall be buried; If used in the short term, you can lay the sleeper and stabilize the sleeper. For mobile concrete mixer, it should be installed on flat and hard floor with square or supporting frame, and hold water flat tire. If more than three months should be used, the tire should be removed properly and the shaft end should be cleaned and rusted. For some mixers that need to be excavated, the ground of the pit should be strengthened to prevent the surface water from entering the pit. The bottom end of the material rail frame should be rammed or laid, and the back of the frame shall be supported by wood to prevent the deformation of the track during work. After the concrete mixer has been started, the mixing drum should be made up after normal speed and after loading, it should be added to the water in time. The new material must be removed before it can be removed. Do not start the blender when the load is stopped or full load, except for the reverser.
Q:Operation procedure of concrete mixer
Safety procedure of concrete mixer A blender must be placed in a solid place, secured with a bracket or a leg holder, and no tires should be replaced. Before starting the mixer, the clutch, brake, wire rope and so on should be checked, and no foreign material in the roller. When the hopper is hoisted, no one shall pass or stay in the hopper, and the hopper shall be fixed after the work is completed. When running, it is strictly forbidden to put the tool into the roller. It is strictly forbidden to leave the work station without any evidence of operation or operation. When repairing, should fix the hopper, cut off the power supply. After the work is finished, should clean the fuselage concrete, do the lubrication to maintain, cut off the power to lock the door.
Q:How is the concrete mixer cleaned
When the blender is finished, rinse the water immediately, but you can't wash it if you don't clean it immediately
Q:The safe distance of the concrete mixer
Different devices have different requirements. But the principle is, as far as possible little, and can't always wall during operation. Therefore, maintenance convenience, give attention to two or morethings is good with 3 -- 5 mm, the thickness of the maintenance when the replacement is a flat screwdriver
"High-Quality Products, Efficient Service, Integrity and Innovation" is our eternal pursuit. . It's always our hope to establish long and stable business relationship with you to reach Win-Win situation. We welcome new and old customers from all walks of life to contact us for future business relationships and achieving mutual success!

1. Manufacturer Overview

Location Liaoning, China
Year Established 2001
Annual Output Value US$1 Million - US$2.5 Million
Main Markets South America
Eastern Europe
Southeast Asia
Africa
Mid East
South Asia
Domestic Market
Company Certifications ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port DALIAN
Export Percentage 31% - 40%
No.of Employees in Trade Department 6-10 People
Language Spoken: English, Chinese, Spanish, Portuguese, Arabic, French, Russian, Hindi
b)Factory Information  
Factory Size: Above 100,000 square meters
No. of Production Lines 2
Contract Manufacturing OEM Service Offered
Product Price Range Low and/or Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords