• SPU Waterproof Coating Material Single Component System 1
  • SPU Waterproof Coating Material Single Component System 2
  • SPU Waterproof Coating Material Single Component System 3
  • SPU Waterproof Coating Material Single Component System 4
  • SPU Waterproof Coating Material Single Component System 5
SPU Waterproof Coating Material Single Component

SPU Waterproof Coating Material Single Component

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
5000 kg
Supply Capability:
1000000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Single Component Polyurethane Waterproof Coating Introduction

Single-component moisture-curing pure polyurethane waterproof coating is a kind of liquid polymer waterproof material,

suitable for dry and wet base surface construction, solidified into tough and elastic, non-toxic and tasteless waterproof 

film after coating. It is a new type of environmental friendly waterproof material without solvent.

 

Single Component Polyurethane Waterproof Coating Application

•Building roof

•Concrete

•Wall

•Water Tank Structure

•Floor(kitchen floor, bathroom floor ect)

•Underground Tunnel

•Sewerage Structure

•Movement Joint

•Wet Area, Pipes, Sewer & etc.

 

 

Single Component Polyurethane Waterproof Coating Advantage

1.water based and solvent based

2.Solid content above 80%

3.Durable performance, UV resistant, ageing-resistant,resistant high and low temperature,antifatigue, withstand constant immersion in water

4.Good splicing performance

5.Operate conveniently, low viscosity

6.Can splicing with concrete and many kinds board stuff

7.Will not change color after used

8.Apply for Roof,Swimming Pool,Tank and more

 

Single Component Polyurethane Waterproof Coating Specifications


NO.

Items

1

Tensile Strength MPa≥

1.9

2.45

2

Elongation at Break %≥

550

450

3

Tearing Strength N/mm≥

12

14

4

Bend at Low Temperature°C≤

-40

5

Unpermeability0.3MPa 30min

Impermeable

6

Solids Content%≥

80

 

Single Component Polyurethane Waterproof Coating photos

SPU Waterproof Coating Material Single Component

 

SPU Waterproof Coating Material Single Component

SPU Waterproof Coating Material Single Component

SPU Waterproof Coating Material Single Component

SPU Waterproof Coating Material Single Component

SPU Waterproof Coating Material Single Component


 

FAQ

1. Which payment do you accept?

For you convenience, our payment can be L/C, TT

2. Is free sample available?

We can supply free samples. You'll just need to pay for express cost.

3. How about your quality?

We have strict quality control system, we make testing on incoming raw material and finished products. Your third party testing is also welcomed. With high quality, our products are used on government projects at home and abroad. Our product quality is accepted by clients from all over the world. Warmly welcome your samples requirement or trail order.

 

 

Q:Find the construction steps for waterproof coatings
1, base surface treatment (1) roof structure After the completion of concrete pouring, should be repeated water compaction, so that the surface of the grass-roots level, the flatness with 2m to check the ruler, ruler and grass-roots gap of not more than 5 mm, and only allow gentle changes. (2) the base surface of the pores, rugged, honeycomb, gap, sand, etc., should be promptly treated, the base surface must be clean, no floating slurry, no water beads, no water; when the base surface appears more than 0.3 mm cracks , Should rush each 10 cm brushing 1 mm thick polyurethane coating waterproof layer, and then set the polyurethane cloth reinforcement layer, and finally brushing waterproof layer. (3) all the corners are used 5 × 5㎝ 1: 2.5 cement mortar for chamfering, the angle made R = 10 mm rounded corners.
Q:Bathroom first leveling or do waterproof, what is the difference
3. Protective layer with cement mortar smooth. 4. backfill recommended the best use of ceramic, followed by light brick, commonly used slag, can also be overhead, cinder can also be less. Backfill attention to the protection of finished products.
Q:Villa roof leakage what general reasons, what materials to remedy
Fourth, the roof of a large area of ??leakage or a number of water leakage points, the first by the professionals to check whether the cracks, according to the previous program to deal with the cracks in the roof covered with waterproof membrane, to enhance the waterproof effect, but also And then covered with insulation board, because the height of the insulation board in 20 cm or more, to achieve the protection of waterproof layer and thermal insulation of the double effect. Wall cracks appear seepage, under normal circumstances the professional construction team will use the basket, by the maintenance staff in the external wall construction.
Q:What is the price of a waterproof window cover?
1, solid wood sets With the emphasis on environmental protection and economic conditions, some families choose solid window curtains, solid wood materials with environmental protection, beautiful, natural and other advantages, but also easy to deformation, thermal expansion and contraction, crack and other shortcomings. According to the final color of different, solid wood sets are divided into primary colors, color and color mixing. At present, more often solid wood materials are Pinus sylvestris, red pine, Qu Liu, Catalpa wood, and some valuable materials such as: beech, Phoebe, pear, rosewood and so on.
Q:Roof sunscreen waterproof layer leakage, brush milk white plastic can solve it?
Fourth, for some of the construction of the roof of the cover of Hong Kong leakage, as long as the removal of tiles on the grass, moss or dust after the replacement of tiles, leak-proof effect is the same. For flat roofs, the roof of the obvious cracks, with the tool will be cracked into a "V" or "U" shape, filling the caulking ointment, filled with cracks and above the use of waterproof wrap around the package. To strengthen the leak-proof effect, you can also shop a layer of waterproofing membrane. ? ???Roof leakage how to deal with five, most of the use of clean up the roof, crack filling, crack sealing, mortar to find equal maintenance methods. Waterproof methods are: membrane waterproof, rigid waterproof, flexible waterproof, waterproof coating and other methods. You can also use the plugging the king is better, for the seepage, slightly dug the slot can be directly plugging the dry powder into the tank, compaction, wiping, sprinkler can be maintained. If the investigation is your home to leak water, the main problem should focus on the surface of the leakage interface and the upper part of the section, it is recommended to find professional leak-proof, it is estimated that it is to spend tens of dollars, if you want to repair it To buy a waterproof paint, (the specific name of a lot to go to that kind of store that they know) and then painted in the floor drain and toilet under the mouth of the water pipe and the upper section can be.
Q:Home improvement waterproofing problem
5, the kitchen is designed to be waterproof. In principle, there should be water and water treatment should be done to avoid the water pipe out of the problem, affecting the destruction of downstairs decorating
Q:Do you use the waterproof material on the building to be harmful to the human body?
Of course harmful, not just this particle, there are auxiliary materials are also toxic.
Q:What decoration materials, light and water, and the wall, the perfect combination of glass
Four, pressure glue Hold the 45 ° angle along the gap to press out the glass compound to ensure that the glass compound is in close contact with the substrate surface. Glue gun moving speed according to the size of the gap, the depth of the line evenly move the glue gun, cloth evenly full, do not pile material and broken. When the seam width is greater than 15 mm, need to repeatedly glue.
Q:Waterproof material water leakage construction should pay attention to what
3, do the closed water test After the waterproof construction is completed, the water storage test. Will be blocked all the toilet outlet, the door at a pound of about 200mm high barrier, and then poured in the bathroom about 20mm ~ 30mm deep water, and 24 hours after the inspection of the walls and the ground around the leakage phenomenon , Waterproof test is to ensure the quality of the bathroom waterproofing the key, we must do. Such as after 24 hours without leakage as qualified. If you find a leak, you should immediately stop the water storage test, re-waterproof layer to improve the treatment, after passing the water test.
Q:Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords