• Single Component SPU Overstrength Elastic Waterproofing Coating System 1
  • Single Component SPU Overstrength Elastic Waterproofing Coating System 2
  • Single Component SPU Overstrength Elastic Waterproofing Coating System 3
  • Single Component SPU Overstrength Elastic Waterproofing Coating System 4
  • Single Component SPU Overstrength Elastic Waterproofing Coating System 5
Single Component SPU Overstrength Elastic Waterproofing Coating

Single Component SPU Overstrength Elastic Waterproofing Coating

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
5000 kg
Supply Capability:
1000000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Single Component Polyurethane Waterproof Coating Introduction

Single-component moisture-curing pure polyurethane waterproof coating is a kind of liquid polymer waterproof material,

suitable for dry and wet base surface construction, solidified into tough and elastic, non-toxic and tasteless waterproof 

film after coating. It is a new type of environmental friendly waterproof material without solvent.

 

Single Component Polyurethane Waterproof Coating Application

•Building roof

•Concrete

•Wall

•Water Tank Structure

•Floor(kitchen floor, bathroom floor ect)

•Underground Tunnel

•Sewerage Structure

•Movement Joint

•Wet Area, Pipes, Sewer & etc.

 

 

Single Component Polyurethane Waterproof Coating Advantage

1.water based and solvent based

2.Solid content above 80%

3.Durable performance, UV resistant, ageing-resistant,resistant high and low temperature,antifatigue, withstand constant immersion in water

4.Good splicing performance

5.Operate conveniently, low viscosity

6.Can splicing with concrete and many kinds board stuff

7.Will not change color after used

8.Apply for Roof,Swimming Pool,Tank and more

 

Single Component Polyurethane Waterproof Coating Specifications


NO.

Items

1

Tensile Strength MPa≥

1.9

2.45

2

Elongation at Break %≥

550

450

3

Tearing Strength N/mm≥

12

14

4

Bend at Low Temperature°C≤

-40

5

Unpermeability0.3MPa 30min

Impermeable

6

Solids Content%≥

80

 

Single Component Polyurethane Waterproof Coating photos

Single Component SPU Overstrength Elastic Waterproofing Coating

 

Single Component SPU Overstrength Elastic Waterproofing Coating

Single Component SPU Overstrength Elastic Waterproofing Coating

Single Component SPU Overstrength Elastic Waterproofing Coating

Single Component SPU Overstrength Elastic Waterproofing Coating

Single Component SPU Overstrength Elastic Waterproofing Coating


 

FAQ

1. Which payment do you accept?

For you convenience, our payment can be L/C, TT

2. Is free sample available?

We can supply free samples. You'll just need to pay for express cost.

3. How about your quality?

We have strict quality control system, we make testing on incoming raw material and finished products. Your third party testing is also welcomed. With high quality, our products are used on government projects at home and abroad. Our product quality is accepted by clients from all over the world. Warmly welcome your samples requirement or trail order.

 

 

Q:What material waterproofing can be mixed with cement sand
Construction can be made with the waterproofing agent and cement made of waterproof mortar. The ratio of cement to sand is 2: 3, and the amount of waterproofing agent is 1% of the cement.
Q:What is the difference between finished mortar and cement mortar?
Finished mortar white lime compounds, and cement mortar dark gray black.
Q:I would like to ask how to do in the warm water above,
Do not know why you are in the floor to do the top of the waterproof? The We are here in the northeast of the winter is very cold, are warm, no one to warm the ground to do the above water, I think you over and over again, ah, no need, every family is warm, you have to do waterproof in the above is afraid of soaking your floor or tiles Bubble? The If the pipe really leaked, did not use the waterproof, the first warm tube must be selected, followed by your shop is good or bad, workers, water, are very important, you focus on this line on the line
Q:Waterproof mortar expensive or dry mortar expensive
Cationic neoprene latex is a polymer modified polymer anti-corrosion system. By the introduction of imported epoxy resin modified latex by adding the domestic neoprene emulsion and polyacrylate, synthetic rubber, various emulsifiers, modified latex and other components of the polymer latex.
Q:Villa roof leakage what general reasons, what materials to remedy
Third, for some of the city building cover the construction of red tiles leakage, as long as the removal of tiles on the grass, moss or dust after the replacement of tiles, leak-proof effect is the same. For flat roofs, the roof of the obvious cracks, with the tool will be cracked into a "V" or "U" shape, filling the caulking ointment, filled with cracks and above the use of waterproof wrap around the package.
Q:How does the waterproofing membrane work?
4, rolling the membrane: the first turn up the end of 1m long, with a long torch melting the bottom of the hot melt adhesive, the rapid paste fixed on the grassroots, and then re-harvest the rest of the volume. The gunmen stood on the paved webs, aligned with the corners of the rolls and the surface of the base layer with the flame of the long gun, and slowly rolled the edges by melting the hot melt. The web is pasted on the base;
Q:A complete set of basement waterproof construction program
First, the basement of the external walls of water leakage project engineering basement waterproofing standard GB50108-2001 "underground engineering waterproof technical specifications" secondary waterproof rating. Basement exterior wall waterproof structure with self-waterproof concrete plus coil waterproof, 50 thick polystyrene board protective layer.
Q:Js waterproof coating without powder can brushing
4. Coating protection: JS waterproof coating after the end of the construction, not thoroughly dry before the need to protect the coating, including the suppression of pedestrians, rain erosion, exposure, sharp damage to objects; thoroughly dry solid JS cement Emulsion coating does not need to do other protective layer;
Q:What decoration materials, light and water, and the wall, the perfect combination of glass
Second, cover the surrounding surface With the tape or the US profile of paper to cover the surface of the interface surface, according to the width of the gap to keep the gap width, width uniformity to ensure that the sealing of the work lines neat and perfect;
Q:Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords