• SET SCREW EMT COUPLING-ZINC,EMT couplings System 1
SET SCREW EMT COUPLING-ZINC,EMT couplings

SET SCREW EMT COUPLING-ZINC,EMT couplings

Ref Price:
$0.05 - 2.50 / pc get latest price
Loading Port:
Ningbo
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description:
EMT couplings are used in dry location to connect the ends of two unthreaded EMT conduits together. EMT aluminum set-screw couplings provide concrete tight connections when taped. Additionally, These set-screw couplings eliminate the need to thread bald conduits to fit old threaded couplings. EMT conduit couplings are pure aluminum material for excellent corrosion protection in damp location.


EMT Coupling
American Standard
UL Standard 514B
Size: Zinc 1/2" to 4"
Aluminum 1/2" to 2"
Set-screw type
Material: Zinc/Aluminum Die Cast


Applications:

These set-screw couplings are used in dry locations to connect   the ends of two EMT thinwall conduits together. topele’ die-cast aluminum, set-screw couplings provide concrete-tight connections when taped and properly secured with the included set-screw. Topele’ set-screw electrical couplings are rated for electrical applications above 600 volts.

SET SCREW EMT COUPLING-ZINC,EMT couplings

 

 

 

 

Q:How much of the cable with the switch?
Switch = (2-2.5) current three-phase current = P / 1.732 / 0.38 / 0.8 single-phase current = P / 0.22 / 0.8
Q:What is the meaning of PG + digital markings for electrical wiring?
If no color distinction, 100 meters after you know which line of the fire line which line? The
Q:25 square copper cable how much money one meter?
There is no 1..2..4.5 square wire. The family uses most of the four wires with 1.. 1.. 2.5 and 4. Power 1KW Approx. 5A.3KW Approx. 15A.2.5 square copper wire can be used. Plug or empty open (25A).
Q:Is the cable head made of every building?
Building in accordance with the floor or unit configuration distribution box, there are office buildings using a total box. Where there is a cable out of the situation, must be wrapped to make the cable head, according to the choice of distribution box circuit breaker wiring crimp or not crimp the cable terminal. In other words, the cable head must be made, but not necessarily crimp the cable terminal.
Q:6 square cable up to how many air conditioning (1.5P)
7 kilowatts of electricity with what specifications of the wire if it is single-phase 220V, then 7 kilowatts of current is 7000 × 220V = 31.8A, check the electrical manual 4 square copper wire interception is 33A, to meet the requirements.
Q:Does anyone know the "line buckle" classification (including shape / size / material / has been some commonly used size!) Line deduction is a hardware products! For daily necessities!
In accordance with the relevant safety regulations, the power cable should not be parallel to the top of the thermal pipe laying, when can not be avoided, the interval distance should not be less than 1000mm, during which should also take effective insulation measures. Power cable and thermal pipe cross, the thermal pipe insulation layer, the separation distance should be not less than 500mm, no insulation layer should not be less than 1000mm, and in the cross with the insulation board to be protected, the length of the insulation board should not be less than d + 2000mm (d for the thermal pipe insulation layer diameter).
Q:The difference between nylon balls and geese and ducks
If the 2.5 square copper wire for the output extension cable, 20 meters distance, the total resistance of about 2 * 1.7 * 0.2 / 2.5 = 0.272 (ohms), the current maximum 1.8A, the voltage drop is 0.272 * 1.8 = ), The charging voltage is 55-0.5 = 54.5 (volts), a difference of about 1% will not have any impact on the battery. However, the third floor, said Ye Hao, you can put the charger put the debris room, from your house put a 220V power cord down, home and then engage in a switch control. It is best to design a light at home, can intuitively see if the electricity is full. That's better. Design light, teach you a way: to find a bad leakless protector, open there is a coil-like ring-shaped stuff, called zero sequence current transformer, it will be down, be careful, do not put Transformers inside the coil hurt, get down, in the transformer two thin lines connected to a light-emitting diode. And then your 220V power cord line of fire from the center of the sensor through, around 3-5 turns. In this way, as long as there is current flow, the light-emitting diode will be bright, when the charge is over, the charging current is close to zero, the light-emitting diode will be extinguished. You can from the light-emitting diode is lit to determine whether the electric has been filled. I also have an electric bike that is so charged.
Q:Can the main cable be aluminum cable? And explain why, thank you!
Excretion training is the use of positive reinforcement, that is, a variety of food, toys, the best time to reward
Q:How do I ask for cable prices? How many tons is one or more?
Yellow line is video, red and white are audio, you can only pick one!
Q:1000 kW 600 m cable to use much
Such a large load so far away, can only be transported with 10KY, near the installation of the transformer Caixing, if the 380V transmission, cross-sectional area, high cost, loss of large, not worthwhile. 10KV high-pressure delivery, current 55A, with 25mm? copper cable 35mm? aluminum cable delivery on it. If the 380V transmission, according to the line voltage loss simple calculation formula △ U% = PL / CS take △ U% = 5 copper cable S = PL / CS △ U% = 1000X600 / 77X5 = / 385 = 1558mm? aluminum cable S = PL / CS = U06 / 46X5 = / 230 = 2307mm? Line voltage loss △ U Simple calculation formula △ U% = PL / CS △ U% - Percentage of voltage loss P - Active power of conveying (Kw) Distance of L- M) C-constant, aluminum single-phase 8.. aluminum three-phase four-wire 46; copper single-phase 12.. copper three-phase four-wire 77S-conductor cross section (mm?) (quoted from "electrical entrance permit test low pressure Class theory "" electrical engineering basis ")

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches