• SC160/160 Building hoist for passenger and materials System 1
  • SC160/160 Building hoist for passenger and materials System 2
SC160/160 Building hoist for passenger and materials

SC160/160 Building hoist for passenger and materials

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:


CMAX BUILDING HOIST SC160/160


DOUBLE CAGES

MAX LOADING CAPACITY= 2X1.6 T

CAGE SIZE= 3X1.3X2.5 M

MOTOR POWER= 2X2X11KW

MAST SECTION SIZE= 650X650X1508 MM

HOT GAVALNIZED OR PAINTED MAST SECTION AVAILABLE

MAST SECTION & ATTACHED FRAME

TYPE OF SAFETY DEVICE: SAJ30-1.2    

WITH OVERLOAD LIMITER & ALARM SYSTEM

MAXIMUM HEIGHT:200M





Q:The principle of material handling
Adaptive principle (flexibility principle) : adopt methods and devices that can adapt to various kinds of work and applications, unless it is a device that must be used for a particular purpose. Reduce the principle of self-importance: reduce the ratio of air to heavy load. Principle of utilization: the optimal utilization rate of planning and carrying equipment and manpower. Maintenance principle: plan all the maintenance and maintenance of all moving equipment. Obsolete principle: replace outdated methods and equipment when there are more efficient means of handling and equipment. Control (control) principle: use material handling activities to improve control of production, inventory and order processing. The principle of production ability: use the handling equipment to improve the production capacity.
Q:There are three things to do when the material is stacked up and down
Fire proof, waterproof and center of gravity
Q:The function of material handling
Material handling machinery factory factory factory logistics system in logistics system involving the coordination of production plan, process flow, handling operation, warehouse management, information system and so on various aspects. High quality and safe operation, lower logistics cost (including transportation, storage etc.). The main logistics system of the manufacturing process of the complex machine factory
Q:What is the proof of working in mechanical design?
The mechanical engineer qualification exam outline (trial) is the Chinese mechanical engineering society, the ministry of education test center for mechanical engineering and technical personnel in our country one of technical qualification certification exam standards documents. It is a mechanical engineer declarant qualification to participate in "comprehensive qualities and skills" the basis of a review test for reference, is to write "mechanical engineer qualification examination instruction" and so on the basis of learning materials, is carried out around the student counseling on the basis of, is the basis of a qualification examination proposition. This outline is divided into four parts: Ⅰ. Basic requirements, Ⅱ. Exam content, Ⅲ. Regulations and instructions, Ⅳ. Sample questions example. Basic requirements part aims to show that as a qualified mechanical engineer, should actively adapt to the world manufacturing industry globalization, informationization, greening and the trend of the development of the service, strive to improve their own comprehensive quality, become a good professional ethics and innovation concept, master machinery manufacturing technology, understand the economic and management knowledge as well as the relevant international rules of a new generation of mechanical engineering and technical personnel.
Q:Material handling system in the factory
Improve logistics quality (material loss, high transport efficiency, safety operation), lower logistics cost (including handling, storage etc.).
Q:What is the relevant content of the flow of materials, storage and usage
What is the relevant content of the flow of materials, storage and usage? Material flow, in lean as "one-piece flow," the core idea is how to make the material in the production process is in a state of flow, however it is very difficult, a more realistic approach is to ensure that in the process of circulation between the products is the least (quantity). The real meaning of storage is what you really need at the scene. Using a process is the sequence of steps to complete a task
Q:The material needs to be transported, it is easy to produce dust.
In general can be used in coal chemical industry material, and can control the dust conveying equipment are: the tube chain conveyor, screw conveyor, continuous chain bucket conveyor, bucket elevator, belt conveyor belt cover, scraper conveyor, and pneumatic conveying system and so on. If there is a technical problem, we are willing to answer for you and invite you to visit the user!
Q:Urgent, please go to logistics expert, the question about the warehouse
Can put the goods of a few higher. Our company is such a place, a lot more than before, and also not easy be affected with damp be affected with damp. Totally can use this way.
Q:What is the carrying equipment of the container cargo
Container (container), crane, forklift truck Kunshan city peng a lift lifting transportation and handling professional clean room equipment installation, precision air handling import and export container, unpacking, assembling positioning, whole factory move, special lifting engineering contracting, precision machine packed in wooden cases
Q:What is the rational and scientific classification of logistics facilities and equipment
You can look at this book In the 21st century, the teaching materials of high vocational high vocational logistics Book this center around the logistics facilities and equipment, introduced the logistics packaging, warehouse, storage, transportation, loading and unloading handling, container unitization, port logistics, distribution processing, automatic sorting, information platform, modern logistics equipment management such as logistics facilities and equipment of theoretical knowledge and practical content. If you don't like reading, you can also check the website of the home logistics equipment.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords