Rack Tower UPS HP9115CRT 1-10KVA
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Units pc
- Supply Capability:
- 4500 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Key Features:
Rack & Tower Design UPS
0.8 Output Power factor
LCD Display
Intelligent slot available
pure high frequency online UPS,with voltage adjustment circuit, provide stable power protection in bad operation environment
comprehensive electrical isolation protection and bypass protection, self test function
Input neutral and live wire detection function and data protection function
Main power failure,going to DC staring ,Convenient and reliable; Main power recover,UPS start automatically
Model | HP9115CRT 1-10KVA | HP9315CTR 10KVA | ||||||||||||||||||||
1KR/1KR-XL | 2KR/2KR-XL | 3KR/3KR-XL | 6KR/6KR-XL | 10KR/10KR-XL | 10KR/10KR-XL | |||||||||||||||||
1KVA/800W | 2KVA/1600W | 3KVA/2400W | 6KVA/4800W | 10KVA/8000W | 10KVA/8000W | |||||||||||||||||
220/230/240VAC | 380VAC | |||||||||||||||||||||
50/60 Hz | ||||||||||||||||||||||
115~295VAC(±3VAC) | 176~297VAC(±3VAC) | 304~478VAC(±3VAC) | ||||||||||||||||||||
50HZ:(46~54HZ);60HZ:(56HZ~64HZ) | ||||||||||||||||||||||
>0.98 | ||||||||||||||||||||||
220/230/240X (1±2%)VAC | ||||||||||||||||||||||
50/60HZ±0.05Hz | ||||||||||||||||||||||
0.8(option) | ||||||||||||||||||||||
Linear Load<3% Non-Linear Load<6% | ||||||||||||||||||||||
overload(110%~150%)after 30 seconds automatically transfer to bypass, it recover after normal load | ||||||||||||||||||||||
3:1 | ||||||||||||||||||||||
0ms(AC→DC) | ||||||||||||||||||||||
36VDC | 72VDC 96VDC | 192VDC &240VDC optional | ||||||||||||||||||||
5 hours to 90% | ||||||||||||||||||||||
1A | 4A/8A optional | 1A | 4A/8A optional | 1A | 4A/8A optional | 2.0A/4.2A(option) | ||||||||||||||||
Display input and output voltage, frequency, battery voltage, battery capacity, and the percentage of load | ||||||||||||||||||||||
RS232, SNMP card(option, USB port(option) | ||||||||||||||||||||||
0~40°C | ||||||||||||||||||||||
0~95% non-condensing | ||||||||||||||||||||||
-25°C~55°C | ||||||||||||||||||||||
<1500 meter | ||||||||||||||||||||||
<45dB | <50dB | |||||||||||||||||||||
N.W | 16.5 | 9 | 26 | 11.5 | 26 | 12.5 | 18.5 | 18.5 | 25 | 32 | 25 | 32 | ||||||||||
G.W. | 18.5 | 11.5 | 28 | 14.5 | 28 | 15 | 21.5 | 21.5 | 28.2 | 35 | 28.2 | 35 | ||||||||||
447x450 x130 | 447x600x130 | 447x450x130 | 447x600x130 | 447x450x130 | 447 x600x130 | 447x600x177 | ||||||||||||||||
- Q:How to use digital multimeter to detect the quality of 36 volt low voltage lighting transformer?
- The number of tables in this table is increasing when the table rings to show 1.Method 2 is only to measure the capacitance is good or bad, can not be measured capacity.
- Q:3 24V100W lights, I need to use a large capacity transformer (220V change 24V)?
- First look at this lamp,.24V100W, this specification is common in the headlights of large trucks, filled with inert gas, known as the small sunThe power supply comes from the generator or battery, and the mode of operation is to ignite by alternating current and direct current. In comparison with the power supply of the transformer, the method of alternating current ignition is better to save the cost and reduce the cost
- Q:Why is the two side of the lighting transformer grounded?
- The metal shell transformer grounding grounding protection is called: under normal circumstances is not charged, electrical metal and in the damaged insulation or other circumstances may be charged part (i.e. metal structure and insulation electrical parts part) and grounding wire connected to a reliable way to protect people.
- Q:Is the substation separate from the power and illumination transformer?
- The power and illumination of the substation are all used on a transformer, which is separated by power and lighting by the station screen of this transformer.
- Q:What type of low voltage transformer should be adopted for safety lighting power supply?
- In general, indoor transformers are used in general practice
- Q:What transformer can be used in a safety voltage lighting transformer?
- 220V/36V or 24V isolation transformer. Double winding, high and low voltage coils, not connected.
- Q:Why is elevator lighting transformer installed?
- Is that the kind of 220V change 36V ah, if it is that kind of thing, I think it should be for security reasons. After all, 36V is a safe voltage. The damage to humans is slightly smaller than that of 220V.
- Q:How to calculate the rated capacity of small transformers for lighting purposes?
- If the flow of large capacity motor starting current and welding machine, large current flows in a short period of time in the load even when the power equipment capacity can withstand current flow in a short time, but due to a voltage drop excitation electromagnetic switch relief, the motor can not start, damaged or the undesirable phenomenon of welding. Therefore, the voltage drop rate should be calculated as less than 10% of the supply voltage, as calculated below.
- Q:Why can't autotransformer be used as transformer for safety lighting?
- The transformer of the lighting circuit is a step-down transformer (general input 10kv., 220V). The first coil of the autotransformer is shared and connected together
- Q:How is the lighting power of the 380V transformer calculated?
- With a light bulb with 4KVA load, the premise of the distance can be Mrs. face light bulb, dark can light the best load, 3KVA bulb brightness
1. Manufacturer Overview |
|
---|---|
Location | Guangdong,China (Mainland) |
Year Established | 2006 |
Annual Output Value | US$10 Million - US$50 Million |
Main Markets | 9.09% North America 9.09% South America 9.09% Eastern Europe 9.09% Southeast Asia 9.09% Africa 9.09% Mid East 9.09% Eastern Asia 9.09% Western Europe 9.09% Southern Europe 9.09% South Asia |
Company Certifications | UPS CE UG/UX 1K; UPS CE (UG/UX) 2/3K; standards organisation of nigeria soncap; Soncap UX6K |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Shenzhen China |
Export Percentage | 61% - 70% |
No.of Employees in Trade Department | 11-20 People |
Language Spoken: | English, Chinese |
b)Factory Information | |
Factory Size: | 10,000-30,000 square meters |
No. of Production Lines | 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | Low and/or Average |
Send your message to us
Rack Tower UPS HP9115CRT 1-10KVA
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 100 Units pc
- Supply Capability:
- 4500 Pieces per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords