HVAC PU/PIR/Phenolic sandwich panel for air ducts
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2500 m²
- Supply Capability:
- 200000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Packaging & Delivery
Packaging Detail: | air duct panel export standard plastic bag and carton,10pcs per pack |
Delivery Detail: | with 7 days after receivin the deposit money |
Specifications
HVAC PU/PIR/phenolic sandwich panel
1.light weight
2.highly thermal resistance
3.low vapour permeability
HVAC PU/PIR/phenolic sandwich panel
PRODUCT INTRODUCTION
This kind of HVAC PU/PIR/phenolic sandwich panel
does not need any further insulation and is installed in a single fix. Light weight and installation speed are among the features of pre-insulated aluminium duct work, it's a new thermal insulation material, with excellent fire performance, low thermal conductivity, ligth weight, green and environmental protection, also save cost. It is used for HVAC Ducting, buliding and construction.
PRODUCT SPECIFICATION
PRODUCT USAGES
It can offers a high performance, light weight and robust ductwork system that requires only a single fix installation process. It is widely used in the ventilation systems of central air conditioning units in hospital, hotel, market, supermarket, guesthouse, airport, stadium, workshop, food store, pure project and so on
- Q:Reinforced concrete and metal sandwich board how much difference
- JGJ130 has regulations. Not more than 0.4L, and not more than 500mm
- Q:50mm thickness of color steel foam sandwich board how much money a flat
- To strengthen safety education, training and safety technology. Article 4 Special operations personnel shall, after obtaining the Special Operations Operation Certificate, carry out the corresponding work; the construction unit shall not arrange for the operating personnel who have not obtained the "special operation operation certificate" to engage in special types of work. Article 5 Special operations personnel shall strictly implement the special operating procedures and the relevant safety rules and regulations, according to the chapter operation, refused to illegal command. Article 6 special operations personnel should carry their own documents, consciously accept the employer, the safety management department of the supervision and inspection. Article VII of the special operations personnel operations, the accident hidden or insecurity factors, should be to the site safety management and the relevant person in charge of the report.
- Q:02J611-4 aluminum alloy color steel stainless steel sandwich panel door Atlas who made a thank you
- Generally 6 meters outside the scaffolding,This is not clear!
- Q:How the exterior of the house is made of rock wool color steel sandwich panels
- Construction, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, scaffolding, Erecting outside the scaffolding materials expected ribs of the late section of the dwarf light dog chupu count, template support frame, shelf safety operation technology. Zibu type construction fastener, by the two holes in the diameter of the child is significantly different, the female fastener riveting, two fasteners on the lower cover are steel stamping parts, cover, under the cover with ribs , The upper and lower cover of the middle part of the arc inward convex, the arc-shaped convex surface and the upper and lower cover on both sides of the same cylindrical surface, the child, the female fastener nut on the same size. The fastener is used to build construction scaffolding, building fence, planting greenhouses, etc., can be connected to different diameter pipe, can be rotated angle, wide range of applications, and the fastener weight, bending strength and good steel, , Easy to use.
- Q:How does the wall rock wool sandwich panel be installed?
- All the components are axially connected and the mechanical properties are good , The connection is reliable, the composition of the scaffolding integrity is good, there is no loss of fasteners Construction of the bowl button steel pipe scaffolding from the steel pipe pole, bar, bowl buckle joints and other components 粻 Fu Gang Huang 蕺 number reported copper stem expansion The basic structure and erection requirements and fastener steel scaffolding similar to the difference lies mainly in the bowl buckle joints Bowl buckle joints are made up of the bowl buckle, the next bowl buckle, the bar connector and the bowl buckle limit pin and so on In the pole on the welding under the bowl buckle and bowl buckle on the limit pin, the bowl will be inserted into the pole Weld the plug on the cross bar and the diagonal bar When assembling, insert the crossbar and diagonal bar into the lower bowl, press and rotate the bowl buckle, and use the limit pin to fix the bowl buckle
- Q:Similar to the color steel tile, floor board, the roof of the push is how much ah
- General wallpaper glue is sticky, you can consider using white latex to try.
- Q:Own balcony capped, with the kind of sandwich panels better, EPS sandwich panels or rock wool sandwich panels, or other kind of sandwich panels?
- Safety Management 2. Civilized construction. Fastener steel scaffold 4. Door steel scaffold 5. Bowl button steel pipe scaffolding 6. Socket type plate fastener type steel scaffolding 7. Full house scaffolding 8. Suspended scaffolding 9. Attachment lift scaffolding 10. High operating basket 11. Foundation Pit Engineering. Template holder 13. High work 14. Construction electricity 15. Material hoist 16. Construction lift 17. Tower crane 18. Lifting hoisting. Construction equipment
- Q:Will the Yanmian sandwich panels do external wall insulation wall can paste tiles? Do A-class insulation of the external wall insulation materials can be posted what kind of it?
- What are the best companies (including imported products) in China?
- Q:General color steel foam sandwich panels. How much a square is flat
- but generally do not choose the best
- Q:Consult the requirements of the flame retardant 0 standard from which the standard standard, and then ask the next level 0 flame retardant standard self-extinguishing time is how much. More
- Clamp material, and pressure ah, a little bit of deformation of the clamp will lead to the next time the use of water leakage; some clamp is sealed with rubber ring, pressure, the rubber ring is not fully restored, will lead to Leakage of water; some cases in the pressure, the pipeline to the development of the process of training, but also lead to tight hoop tightly
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
HVAC PU/PIR/Phenolic sandwich panel for air ducts
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2500 m²
- Supply Capability:
- 200000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords