• High Medium Voltage Drive 6KV 1400KW RMVC4000-A060/1800 VFD System 1
  • High Medium Voltage Drive 6KV 1400KW RMVC4000-A060/1800 VFD System 2
High Medium Voltage Drive 6KV 1400KW RMVC4000-A060/1800 VFD

High Medium Voltage Drive 6KV 1400KW RMVC4000-A060/1800 VFD

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Energy-saving Solutions for Enterprise
1
Program Overview
Saving energy achieves 10% -70%
The enterprises do not need to pay for expense of equipment manufacture and installation.
Enterprises only need to pay the saving electricity expense to our company according to the actual quantity of energy saving after the equipments put into operation.
According thousands of the projects’ implementation experiences, such projects recover the investments in three or four years. (Equipment service life is 15 years)
Our company will no longer charge the saving electricity expense after recovering the investment.

The significance of the program:
1
)、Concentrate on solving problems of energy conservation, make enterprises’ energy-saving work reach new level and take their social responsibility
2
)、Avoid the enterprises reactive power fine of low power factor caused by electric energy using (according to Ministry of Electric Power and Water Resources, State Price Control Bureau establish the " measures of power factor adjustment expense ").
3
)、Avoid the high-energy consumption enterprises are implemented differential prices because of the changes of national power regulation.
4
)、For the standard-conforming large-scale (saved energy equal 10 thousand tons standard coal or more) energy-saving technological transformation projects, China will reward the enterprises for energy saving which based on the "Financial Incentives Interim Measure for Energy-saving Technological Transformations" established by Ministry of Finance, the National Development and Reform Commission.( Amount of 200 yuan / ton of standard coal).
5
)、Equipments recovery period is generally 3-4 years, each period payment equal to the amount of current energy-saving benefits, and equipments service life are 15 years, so enterprises will gain huge energy-saving benefits.


2
Implementation Process
Energy Audit
Energy Saving Program Design
Construction Design
Equipments Manufacture
Construction and installation
Maintenance and Repair
Energy Monitoring and Efficiency Insurance
Recovery of Program Investment


3
Program Features
High energy-saving efficiency
The project saving rate is generally 10% -30%, highest is up to 70%.
Clients Zero Investment
All works of design, audit, manufacturing, construction, monitoring are handled by RXPE, clients does not require investment.
Energy-saving Guarantee
RXPE promises the amount of energy saving, ensuring that clients’ cost reduction immediately.
Short Investment Recovery Period
The investment recovery period is short, average period is 3-4 years.
Low Risk
Customers do not input large sums of money also can enjoy professional energy-saving products, technologies and services, and the investment risk is very low.
Improvement of Cash Flow
Customers with the support of RXPE approve energy-saving program to improve cash flow, invest the limited funds into other priority investment areas.
Enhance competitiveness through implementing energy conservation, improving energy-saving efficiency, reducing energy costs and enhancing the quality of environment, establish green corporate image and enhance market competiveness.

Q:Servo control system can give the inverter signal,
but want two motor synchronization, it should be impossible, the converter does not reflect so fast, and the speed is not so stable.
Q:What parts of the inverter composition
Simply put, the inverter is mainly composed of rectifier (AC variable DC), filter, inverter (DC variable AC), brake unit, drive unit, detection unit micro-processing unit
Q:How to choose the inverter
Look at the motor seat size is 7.5kw it, this model of the inverter manufacturers a lot of production, and are built-in brake unit, so in the function which are the same It is important that the inverter life, stability, price comprehensive consideration Mitsubishi, Panasonic, LG, Emerson, Yaskawa, Siemens and so on
Q:How to choose the right inverter?
, fan, pump load This is the most suitable for use in frequency conversion speed of the scene environment, the inverter function technology is not too high requirements, the use of inverter energy saving effect is remarkable. For example: a large-scale heating equipment in a large-scale heating system, including blower, induced draft fan (centrifugal fan) inverter configuration configuration with the power of the P-type machine; water pump (centrifugal pump) inverter configuration configuration with the power of the P-type machine ; Conveyor pump frequency converter selection configuration with the power of G-type machine; belt machine (coal feeder) inverter configuration configuration to enlarge a file of the G-type machine; slag converter inverter configuration configuration to enlarge a file of the G-type machine; Crusher (coal crusher) inverter configuration configuration to enlarge a file or two stalls of the G-type machine.
Q:The inverter is running independently
. Main working circuit (1) Operation circuit: the external speed, torque and other instructions with the detection circuit current and voltage signal comparison operation, determine the inverter output voltage, frequency. (2) voltage and current detection circuit: isolation with the main circuit potential detection voltage, current and so on. (3) drive circuit: drive the main circuit device circuit. It is isolated from the control circuit to turn on and off the main circuit device. (4) speed detection circuit: mounted on the asynchronous motor shaft speed detector (tg, plg, etc.) signal for the speed signal into the operation loop, according to the command and operation can make the motor running at the command speed. (5) protection circuit: the detection of the main circuit voltage, current, etc., when the overload or over-voltage and other abnormalities, in order to prevent the inverter and asynchronous motor damage
Q:What is the single axis of the inverter and multi-axis applications
Inverter is the application of frequency conversion technology and microelectronics technology, by changing the motor power supply frequency and amplitude of the way to control the AC motor power transmission components.
Q:With the inverter control fan 37Kw4 pole with what model inverter
If the speed is not very high requirements, all the general-purpose inverter can be.
Q:22kw.2 pole fan can use Fuji inverter?
Definitely yes. 2-pole motor and four-pole motor difference is: the current is different, the speed is different, the torque is not the same,
Q:HP laptop power adapter how to open
HP notebook power adapter for the full size of the design, you can follow the following steps to dismantle: 1, notebook computer power adapter for the injection molding package or with a strong adhesive glue, without any screws, so generally only with violence to crack. However, as long as the method properly, after the dismantling of the power adapter can be restored to the original, do not carefully observe almost no traces of open. 2, the power adapter on the side of the side of the white paper, with an electric knife edge along the power adapter between the gap between the cover, and then hit the electric knife with a hammer, so that the electric knife from the adapter between the upper and lower cover go with. In the different positions of the gap between the upper and lower covers of the adapter, use the tip of the electric knife to be scratched along the gap. When the upper and lower covers are first split, the depth of the tool is deep and then the upper and lower covers of the adapter are separated. 3, then open the shell of the power adapter, you can see the adapter circuit outside the package with a copper shield, with a knife to cut the shielding tape on the tape, and then use the soldering iron shield and the internal circuit board connected to the two Solder joints, you can remove the shield. 4, between the shield and the circuit board is also separated by a layer of thick plastic film, and then cut off the knife after the United States, you can see the circuit board "Lushan true"
Q:Notebook power adapter on how to look at power
then the same formula can be used to calculate: power (unit: W) = voltage (unit: V) × current (unit: A). For example: the power adapter only identifies the output voltage is 20V, the output current is 4.5A, then we set a formula to know the output power is 20 × 4.5 = 90W.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords