• Duty Cable Ties System 1
Duty Cable Ties

Duty Cable Ties

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
2000 Pieces pc
Supply Capability:
60000 Pieces per Day pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detailed Product Description

 

1.UL, GL, ABS, Lloyd's Register approved product.

2.Min. loop tensile strength:114kg (250 lbs)

3.High tensile strength cable ties.

4.Extra heavy duty ties for application where higher tensile strength is required.

5.One-piece construction for consistent performance and reliability.

6.Lowest threading force of any one-piece cable tie in the industry.

7.Recognition/ certification: UL, ABS,  Lloyd's Register, GL

8.RoHS compliant. Halogen free material.

9.Material: Polyamide 6,6, UL94 V2

10.Color: All colors are available

 

Q:Dual-value capacitor asynchronous motor starting up the speed is high and low What is the reason, the motor rotation just to the high speed suddenly down again more
My professional is to do this, but depends on your TV there is no audio output, it is very simple to use two sets of lines, do not control what is HDMI or color or video, respectively, connected to the TV. And then use the TV AV / TV to choose just like the protection of the pole pole pepper locust Ge Wei Gonglian, if the TV sound to the sound, first look at the TV output. If there is connected to the amplifier. Not on the set-top box assigned to the amplifier "answer is completed
Q:I got the machine, and then removed, there is a section of the tube was bent, and that position really need to fold before, because there is a turn, but now that place too hard, and completely unreasonable that he is normal Of the time, because the demolition of a little time will be folded, do not know that they may be deliberately? And then to add money, encounter this situation usually how to do more
What you want to know, can add me or our Q group
Q:The role of cable connector box classification installation requirements
Although electricity and power generation are all power lines, they can be seen as two different systems. Therefore, when laying the cable, if the laying of the cable from the same bridge, the partition will be separated from the cable for future maintenance and maintenance. The The requirements of the partition depends on the depth of your bridge, the partition placed in the bridge, the bridge as high or slightly lower, if higher than the frame of the frame, affecting the beautiful, detailed provisions There is no ready-made plaintext.
Q:Ask the experts to teach how to make Tablet PC DIY antenna? Such as title
With the engine power: such as the BMW 320Li is 184 horsepower, 328Li is 245 horsepower. With the gearbox type: such as manual transmission, automatic transmission (manual block points: manual, stepless, double clutch) with the chassis suspension: such as Cadillac ATS ordinary version is a common suspension, the flagship version of the electromagnetic suspension. Related to the space: such as the natural sounds of 4.8 meters long version, 5.0 meters long version. Related to the safety of the body structure: such as Passat has a 1.4-ton version of the 1.6-ton version. With the tires: for example, some cars with low 225 / 55R17 tires, high with 245 / 45R18 tires. With the car configuration related to: For example, some leather seats have a world famous audio system with ESP ... ..., some no.
Q:What is the belt that is bound to the motorcycle line?
Is the separator divides the bridge into 2 and a half, usually with two different roles of the cable at the same time laying in a cable bridge, such as the power cable with the signal cable with the bridge laying, in order to avoid electromagnetic interference, with separator separation.
Q:Wire diameter of 15MM current transformer model for the BH-0.66- / 5LMK-0.66SDH-0.66 wear the core is very urgent online Thank you more
When there is a large current through the wire will produce a magnetic field, a little bit of sound.
Q:What are the precautions for using the cable mesh and how to use it?
Design time will not be set up, because, when you check the low-voltage lines, but also to the high-pressure corridor. The Design unreasonable ,,, As for the norms, do not know
Q:The use of composite heat - shrink tape
Composite insulation heat shrink tape (cable repair heat shrink zone) Operating Instructions
Q:The police station asked to install a small hotel to monitor the camera, do not know how to choose the camera, you need to prepare what materials, cost about how much money?
I would like to ask if the buried construction buried in the buried wall and floor casing, how to increase the protective casing, cable wall and floor to install the protection tube is the use of what,
Q:How can the tape of this tie open? I cut it with scissors
The general practice is to use flat steel in the bridge through the long ground. Reason: According to the requirements of the specification, the bridge is not less than two points and the ground connection reliable connection, in order to ensure the reliability of grounding, the conventional practice is to lay a long flat steel in the bridge. This requirement is regardless of the ordinary bridge or fire distribution with the fire bridge, are required to do. Supplementary reference: For example, "Code for construction and acceptance of grounding installations for electrical installations" GB-2006 Section 3.4.6: Laying of copper wires along the cable tray, galvanized flat steel and the use of metal structures along the bridge, such as When installing the metal components for the bracket as the grounding line, the cable bridge shall be grounded in accordance with the following provisions: 1 When the total length of the cable bridge is not more than 30m, it shall not be less than 2 connected with the grounding trunk. When the total length is more than 30m, Every 20m ~ 30m increase with the grounding point of the connection point; 3 cable bridge starting and end ends should be connected with the grounding network.
Our facilities are equipped with over 150 injection molding machines to produce full line of cable ties, stainless steel ties, wiring terminals, wiring ducts, flexible conduits, adaptors, and so on. The number of employees worldwide is around 1,500. We welcome customers from the entire world to cooperate with us.

1. Manufacturer Overview

Location Taiwan
Year Established 1976
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Central America
Northern Europe
Southern Europe
South Asia
Domestic Market
Company Certifications ISO 9001:2008;ISO 14001:2004;ISO/TS 16949

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Laem Chebang/Thailand,Bangkok/Thailand,Donnguan/China
Export Percentage 91% - 100%
No.of Employees in Trade Department 21-50 People
Language Spoken: English, Chinese, Spanish, Japanese
b)Factory Information  
Factory Size:
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range High and/or Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords