• Dry-mixed mortar powder Mortar Product Line machine System 1
  • Dry-mixed mortar powder Mortar Product Line machine System 2
  • Dry-mixed mortar powder Mortar Product Line machine System 3
Dry-mixed mortar powder Mortar Product Line machine

Dry-mixed mortar powder Mortar Product Line machine

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
  • Tower Type Dry Mortar Product Line


  • Tower type dry mortar product line is applied to mass production,for ordinary and special dry mortar.It can product variety kinds of products and have high efficiency,which capacity can reach to 200T/H.Lower operating cost,large productivity,big investment,compact structure and covering fewer floor area with magnificent structure.

  • ItemType
    GSW2000GSW3000GSW4000GSW6000GDW2000GDW3000GDW6000
    Theoretical Productivity(t/h)4060801204060120
    MixerSW2000SW3000SW4000SW6000DW2000DW3000DW6000
    Power(KW)200240400800200240800
    Floor area(㎡)300450500700300450700
  • Ladder Type Dry Mortar Product Line


  • Ladder type dry mortar product line is also applied to mass production,for both ordinary and special dry mortar.More variety,high efficiency,large productivity,big reat investment,covering more floor area.

  • ItemType
    GSW2000GSW3000GSW4000GSW6000GDW2000GDW3000GDW6000
    Theoretical Productivity(t/h)4060801204060120
    MixerSW2000SW3000SW4000SW6000DW2000DW3000DW6000
    Power(KW)200240400800200240800
    Floor area(㎡)400550600800400550800

  • Plant Type Dry Mortar Product Line

  • Plant type dry mortar product line is applied to medium scale production,less changeless of products,which capacity can reach to 100T/H.It is suitable for simple and flexible dry-mortar production.Less investment and covering more floor area.

  • ItemType
    GSW1000GSW2000GSW3000GSW4000GDW2000GDW3000
    Theoretical Productivity(t/h)204060804060
    MixerSW1000SW2000SW3000SW4000DW2000DW3000
    Power(KW)150200240400200240
    Floor area(㎡)300400550600400550


Q:What are the pros and cons of a concrete mixer?
If the concrete is not used, it is recommended to buy concrete from the concrete station Small mixers can't keep up with the efficiency, plus the cost of labor Better to buy from the concrete station
Q:Is the concrete mixer and mortar mixer a machine
The mortar mixer is the machine which mixes the cement, the sand and the aggregate with the water and mixed the mortar. It consists mainly of mixing, loading and unloading mechanism, water supply system, original motive, transmission mechanism, frame and supporting device. Mortar mixer equipment can meet the performance requirements of dry mortar, dry material, adhesive powder production needs, such as: putty powder, powder coating, masonry mortar, plaster mortar, insulation mortar, decorative mortar needed by the system and so on all kinds of dry powder mortar; And it has many advantages such as small area, little investment, quick results and easy operation. Working principle: when mixed machine work, inside the machine material subjected to two opposite direction of the rotor, with complex movement, the blades to drive the material aspect counterclockwise along the machine slot wall, on the one hand, drive material turning around, overlapping the two rotor shape floating zone, within the region, regardless of the shape of the material, size, and density, can make material floating instant weightlessness, which makes the material in the machine groove omni-directional continuous loop turn staggered shear each other, so as to achieve the effect of rapid mixing soft.
Q:For example, what is the more detailed and better td-50 td-80 td-60
Concrete mixer: mainly consists of mixing, loading and unloading mechanism, water supply system, original motive, drive mechanism, frame and supporting device. Concrete mixer function: To make each component macroscopically homogeneous; To destroy the phenomenon of cement grain reunion and promote the development of dispersive phenomena; The initial water coating on the surface of the cement particle. The effect of the friction between the material particles and the dust film is reduced. Increase the frequency of the unit and the cross frequency of the moving track, accelerate the homogenization
Q:250 litres of the blender once made concrete
250-liter blender once gives 200 to 220 litres of concrete. 250 litres of time the amount of concrete mixer quantitative is 250 litres, but is usually not meet this standard, because in the process of mixing concrete appear adhesion or water loss, so the volume will narrow. The actual quantity is approximately 80% of the quantity. A concrete mixer is a machine that mixes cement, gravel and water into concrete mixtures. It consists mainly of mixing, loading and unloading mechanism, water supply system, original motive, transmission mechanism, frame and supporting device.
Q:How long will it take for a concrete mixer to beat ten square?
1, 2 square, each time you can mix 1 square, top material, stirring, material for about 10 minutes, (depending on the material speed), 10 square about 100 minutes
Q:Concrete mixers need to be aware of which things
Prior to the use of the new machine, the requirements of the manual of the concrete mixer shall be conducted according to the instructions of the concrete mixer, and the test and the necessary trial operation shall be conducted for each system and the parts. Running in the empty car, checking the rotation direction of the mixer or stirring leaves, the operation of each work unit, the brake, the confirmation of normal, the operation. Fixed concrete mixer should be installed on a strong pedestal. When used in the long term, the ground bolts shall be buried; If used in the short term, you can lay the sleeper and stabilize the sleeper. For mobile concrete mixer, it should be installed on flat and hard floor with square or supporting frame, and hold water flat tire. If more than three months should be used, the tire should be removed properly and the shaft end should be cleaned and rusted. For some mixers that need to be excavated, the ground of the pit should be strengthened to prevent the surface water from entering the pit. The bottom end of the material rail frame should be rammed or laid, and the back of the frame shall be supported by wood to prevent the deformation of the track during work. After the concrete mixer has been started, the mixing drum should be made up after normal speed and after loading, it should be added to the water in time. The new material must be removed before it can be removed. Do not start the blender when the load is stopped or full load, except for the reverser.
Q:How many square concrete can be produced in an hour of concrete mixer
One hour of theoretical productivity is 50, which is actually about 40. Because it takes time to get into the car and get out of the car, it's not a matter of machine production.
Q:How is the concrete mixer cleaned
I don't know which type of blender you're talking about. The self-falling mixer is the roller mixer. Rinse directly with water. The strong mode is also the JS mixer water rinse to notice whether the shaft end of the shaft is clean, and be careful not to use the side shovel to break down otherwise there will be a sealing problem
Q:What is the difference between a concrete mixer, a JL type and a JW type?
The jw-375 concrete mixer is a turbo-reinforced concrete mixer, which is used for hard and semi-dry concrete. The main body of this mixer consists of the frame, the feeding system, the mixing system, the water supply system, the control device and the transmission mechanism.
Q:The safe distance of the concrete mixer
1. The correct use of 1) to ensure the mixing quality of the mixture, it must be the gravel, sand and cement to be accurate. Before stirring, adjust the position of the pointer on the water tank indicator to control the amount of water. The mixing time should be strictly controlled, and the hopper discharge should be clean, otherwise it will affect the mix of the next mixture. 2) when loading in the feed hopper, should pay attention to the loading sequence, namely the rubble next, cement, sand, in the hopper rises so does not cause cement float in the sky. When the work is finished, pour some gravel or sand into the mixing drum, stirring up 10min. Otherwise, it will be difficult to clear after the rest of the drum solidifies.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords