• Asphalt Mixing Plant LB1200 System 1
Asphalt Mixing Plant LB1200

Asphalt Mixing Plant LB1200

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

LB1200 Asphalt Mixing Plant

Item

Description

Remarks

1

Aggregate batching machine:4 units

The bin capacity: 8M³ (flat hopper), total capacity 32M³;

1 set

2

The feeding belt conveyor

1 set

3

Drying drum

Dimension: Æ1700×7000 mm, the installation angel: 4°, the running speed 10.9rpm, rotation running through 4 units electric motor and cycloid reducer, the outer side wrapped with 50mm mineral wool thermal insulation layer with stainless steel.

1 set

4

The burning system: Italy EBICO oil burner

Fuel kinds :diesel& heavy oil, coal or gas;

with a diesel tank (10t) and a heavy oil tank (10t).

With China made Automatic burner ( as optional )

With China made coal burner ( as optional )

1 set

5

The inertial dust collector: Two-drum vertical cyclone dust collector

1set

6

Bag dust collector ,The bag material:NOMEX America

With water filter ( as optional )

1set

7

Hot aggregate elevator: adopts the double-chain elevating hopper, Hoisting capacity ≥120t/h

1set

8

The vibration screen unit of the hot aggregate: two layers four segments

1 set

9

The hot aggregate bin:4 bin, 10.9m3 totally

1 set

10

The weighing system for the hot aggregate, filler and bitumen

1 set

11

The mixer capacity: 1200 kg/batch; 22kw×2

1 set

12

The tower frame

The main tower with supporting legs, repairing platform and guardrail

1 set

13

The filler supplying system, capacity: 26m3;

Capacity:20 –30 tons/hour;

Power elevator (as optional)

1 set

14

The hot oil heating system and pipeline

the hot oil heater capacity 60×104KCal/h (coal heater as optional)

1 set

15

Asphalt tank and pipeline: 2 units of 25tons tanks (30 tons as optional)

3 sets

16

Pneumatic control system

1 set

17

The electric control system

Siemens PLC control ,Main electric parts :Simens or Schneider brand

Automatic and Manual control mode

1 set

18

Control room: .4.5m×2.25 m× 2.50 m

1 set

19

Finished asphalt storage silo ( 60tons, 120 tons ) as optional part

1 set

Total power:340KW

Total size: 37m*30.2m*15m(length*width*height)

Total weight: 115t

Price range: (FOB Qingdao China)

USD250000~360000$





Q:What does HZS mean in the HZS120 concrete mixing station
HZ is the concrete mixing station. HZ is the concrete mixer. HZS is a concrete mixing station with a double sleeper shaft mixer
Q:Concrete mixstations belong to no special equipment
The boiler is a special equipment in the stirring station.
Q:What is the difference between a concrete mixer and a concrete mixer
The simple point is: the bones of the mixing tower are on top, and the bone is measured directly into the blender. The bone material of the stirring station is below, and the bone material is measured and then transported into the blender after the slanting belt. In a popular way, it is called the building, which is called the second ascent. Higher initial investment mixing floor production line 400000 station, because of mixing building bin above, therefore the steel structure will be bigger, inclined belt will be relatively longer. But in productivity, the churn is about 20 per cent more productive. In the operation, the energy consumption and the failure rate will increase due to the frequent start of the inclined belt of the mixing station, while the mixing building will be relatively low. Of course, in appearance, the mixing building is a bit more imposing than a mixer-stand, which can sometimes have an unexpected effect on the business. In addition, there are some technology mixing buildings that can be used, and the mixing stations can't be used, because the equipment is different. It's worth noting that the difference between the initial and the mixing stations is not absolute.
Q:What is the concept of on-site concrete mixer station
It's not a simple blender. It's not a simple blender. But an intensive production scale small and use the site concrete, according to the need to establish a set of automatic production line, divided into according to production output per hour 35 square (45), 50 square (60), 75 (90), 90 (120), the standard station with laboratory; To establish the corresponding scale of the stations according to the construction needs; This kind of mixing station can not only guarantee the quality of concrete, but not the time factor, which guarantees that 24 hours can produce the concrete needed for the site. He needs to have about 30, 000 or so in demand, and the site is suitable. This has low cost, convenient site management and mutual benefit!
Q:What are the ingredients for the concrete mixing stations?
Start with the glue: cement, coal ash, mineral powder, and various expansions! Sand: natural sand, mineral sand, fine sand; Stone: 5-10, 5-20 water reducer! And tap water
Q:What are the facilities of the concrete mixing station
One. Stir the host The mixing machine is divided into strong mixing and self-falling stirring. The powerful mixer is the mainstream in the domestic and foreign mixers, it can stir the liquid, semi-dry hard and hard and so on. The main mixing liquid concrete of the self-falling mixer is very rarely used in the mixing station. Two. Material transport system The material transport consists of three parts. Aggregate conveying; There are two ways of conveyance and belt conveyance. The advantage of hopper promotion is that the area is small and the structure is simple. The advantage of belt transport is that the transport is large, efficient and low. The belt conveyor mainly applies to the mixing stations that have aggregate storage, thereby increasing the productivity of the mixing stations. Powder conveying; The powder used in concrete is mainly cement, fly ash and mineral powder. The most commonly used powder conveyors are conveyors of screw conveyors, and the large mixing buildings are carried by pneumatic conveyer and scraper. The advantages of screw transport are simple structure, low cost and reliable use. Liquid transport mainly refers to water and liquid admixtures, which are delivered separately by water pumps.
Q:The main components of a mixing station
Feeding system: aggregate bucket, aggregate weighing hopper, flat belt machine, inclined belt conveyor. Mixing system: the main machine is a double-deckshaft mixer, reducer, cement weighing hopper, water and additive weighing hopper. Cement supply system: cement warehouse, screw conveyor, air compressor, screw electronic. Automatic water supply system: water tank, pump, pipe. Electrical operating system: computer console, electric control cabinet, operation room. Operation control system: microcomputer control or manual control.
Q:What constitutes the js750 concrete mixing station
The concrete mixing station consists of the mixing system, the aggregate supply system, the measuring system, the control system and the external supporting equipment. The main purpose of the mixing station is to mix concrete, also called concrete mixing station. HZS series products adopt international popular cement concrete mixing station quickly assembled module type structure, high-performance imported agitator, double machine double control way of computer control, prevent noise, prevent dust pollution, environmental design, is the new generation of cement concrete mixing equipment, applicable to urban commodity ready-mixed concrete, road and bridge, water conservancy, airports, ports and other large infrastructure construction project and concrete demand for large sites.
Q:What is the special work of the concrete mixing station
One of the features of the high-performance concrete mixer line is the low water ratio. In order to ensure its liquidity, it must be mixed with an efficient water reducer. Therefore, it is necessary to select cement that is suitable for low water cement ratio. One is the composition of fineness and particles, and the other is the early hydrogenation after the addition of water.
Q:How to choose a good concrete mixer station?
Selection is best good survey is supply and demand situation of you and how many mixing station, concrete demand how, don't blindly pursuing big equipment, vehicles and personnel left unused, but it is now generally good, as long as the operation, mixing station not at a loss

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords